Bessemer, AL Traffic and Road Conditions

 
Click any alert icons on the map to see info.

Bessemer Traffic Alerts

I-59 Northbound in Jefferson County
Mon, 16 May 2016 19:37:05 -0500
Monday, May 16 at 7 p.m. thru Thursday, May 19 the I-59 northbound 2 inside lanes near Milepost 126 will be closed until approximately 7 a.m. each night. The contractor will implement the double lane closures and rolling roadblocks to continue installing the steel bridge girders over the I-59/20 northbound roadway. This closure will be between downtown Birmingham (31st Street/280 Expressway) and just north of the 31st Street N (Exit 126B) and I-59 northbound Roadway exit. - The on-ramp from 31st Street N to I-59/20 northbound will also be in a yield condition from 7 p.m. to 7a.m. each night. Motorists should use caution when merging into mainline traffic from this interstate on-ramp. Rolling Roadblocks with complete lane closures will be implemented every night between the hours of 11:00 p.m. to 3 a.m. to set and install the new bridge girders. Traffic will be allowed to clear every 15 minutes or less.
US 78 All in Jefferson County
Fri, 13 May 2016 21:41:23 -0500
AL 5 (US 78) – on the outside shoulders and median in the northbound and southbound directions from the I-59 Interchange (134.5) in Birmingham to the Walker County Line (Milepost 154.7) in Sumiton. This work may require closure of the outside (right) and the inside (left) lanes at various times and locations in the area where guardrail repairs are being made. - Planned Guardrail Repairs. Sunday May 15 at 8 p.m. This work may require intermittent lane closures for up to 8 weeks.
I-22 All in Jefferson County
Fri, 13 May 2016 21:40:40 -0500
I-22 – on the outside shoulders and median in the westbound and eastbound directions from the Coalburg Rd. interchange (Exit 93) in Birmingham to the Walker County Line (MP 78.6) in Leeds. This work may require closure of the outside (right) and the inside (left) lanes at various times and locations in the area where guardrail repairs are being made. - Planned Guardrail Repairs. Sunday May 15 at 8 p.m. This work may require intermittent lane closures for up to 8 weeks.
I-20 All in Jefferson County
Fri, 13 May 2016 21:39:30 -0500
I-20 – on the outside shoulders and median in the eastbound and westbound directions from the I-59 interchange (MP 130.0) in Birmingham to the St. Clair County Line (MP 142.9) in Leeds. This work may require closure of the outside (right) and the inside (left) lanes at various times and locations in the area where guardrail repairs are being made. - Planned Guardrail Repairs. Sunday May 15 at 8 p.m. This work may require intermittent lane closures for up to 8 weeks.
I-459 All in Jefferson County
Fri, 13 May 2016 21:38:44 -0500
I-459 – on the outside shoulders and median in the northbound and southbound directions from the I-59 interchange (MP 0.0) in Bessemer to the I-59 interchange (MP 33.3) in Trussville. This work may require closure of the outside (right) and the inside (left) lanes at various times and locations in the area where guardrail repairs are being made. - Planned Guardrail Repairs. Sunday May 15 at 8 p.m. This work may require intermittent lane closures for up to 8 weeks.
I-459 All in Jefferson County
Wed, 11 May 2016 14:55:32 -0500
– Weather permitting, beginning Monday, May 16, the Alabama Department of Transportation will continue a project for Intersection Improvements on the I-459 Interchange (Milepost 32) and AL 7 (US 11) near Edwards Lake Road (Milepost 137.378) in Trussville as follows: - • Monday, May 16 begin asphalt paving on the northbound off ramp to US- 11 near Trussville. • Tuesday, May 17 begin asphalt paving on the northbound on ramp to I-459 to US-11. • Wednesday, May 18 begin asphalt paving on the southbound off ramp to US-11. • Thursday, May 19 begin asphalt paving on the southbound on ramp to US-11. Hours of operation for this paving is scheduled to be from 9:00 p.m. to 5:00 a.m. for each night scheduled. The ramps will be closed during this scheduled time. This will complete all of the asphalt paving for the project. There will be a 2 week curing period before all of the permanent striping on these ramps can be completed
I-22 Eastbound in Jefferson County
Wed, 11 May 2016 14:53:56 -0500
– Weather permitting, from Friday, May 13 at 8 p.m. thru Monday, May 16, at 5 a.m. the Alabama Department of Transportation will resurface the Eastbound Loop Ramp from US-78 to Eastbound I-22. This work will require the loop ramp to be closed while this area is under construction. - The ramp is expected to be opened no later than 5 a.m., Monday, May 16
I-459 All in Jefferson County
Wed, 16 Mar 2016 14:01:07 -0500
On Sunday, March 20, weather conditions permitting, beginning at 8 p.m., the Alabama Department of Transportation will begin repairs to the guardrail - • I-459 – on the outside shoulders and median in the northbound and southbound directions from the I-59 interchange (MP 0.0) in Bessemer to the I-59 interchange (MP 33.3) in Trussville. This work may require closure of the outside (right) and the inside (left) lanes at various times and locations in the area where guardrail repairs are being made.This work may require intermittent lane closures for up to eight weeks.
I-59 All in Jefferson County
Wed, 16 Mar 2016 13:57:37 -0500
On Sunday, March 20, weather conditions permitting, beginning at 8 p.m., the Alabama Department of Transportation will begin repairs to the guardrail. - • I-59 – on the outside shoulders and median in the northbound and southbound directions from the Tuscaloosa County Line (MP 100.5) in Bessemer to the St. Clair County Line (MP 147.8) in Argo. This work may require closure of the outside (right) and the inside (left) lanes at various times and locations in the area where guardrail repairs are being made.This work may require intermittent lane closures for up to eight weeks.
I-65 All in Jefferson County
Wed, 16 Mar 2016 13:55:52 -0500
On Sunday, March 20, weather conditions permitting, beginning at 8 p.m., the Alabama Department of Transportation will begin repairs to the guardrail.-65 – on the outside shoulders and median in the northbound and southbound directions from the Shelby County Line (MP 248.7) in Hoover to Fieldstown Rd. (Exit 270) in Gardendale. This work may require closure of the outside (right) and the inside (left) lanes at various times and locations in the area where guardrail repairs are being made - Upon completion of all guardrail repairs on the outside (right) shoulders, the repairs will move to the inside (left) median shoulders in both the northbound/eastbound and southbound/westbound directions, which will require the inside (left) travel lane and shoulder to be closed in areas where the guardrail repairs are being made. This work may require intermittent lane closures for up to eight weeks.
I-65 All in Jefferson County
Tue, 12 Jan 2016 11:21:01 -0500
Road and bridge work consisting of grade, drain, base and pave, bridge raising, lighting, bridge widening and approaches from the 2nd Avenue North overpass to the I-59 / 20 interchange in Birmingham. - Heavy equipment working adjacent to roadway. Delays and lane closures possible. - Expected Completion: 6/15/2016
I-20/59 All in Jefferson County
Tue, 12 Jan 2016 11:17:30 -0500
Road and bridge work consisting of interchange modifications, grade, drain, base and pave, striping, signing, signals, lighting, bridge removal, bridge widening, bridge replacement and retaining walls at I-65 from west of Arkadelphia Road to east of I-65. - Heavy equipment working adjacent to roadway. Delays and lane closures possible. - Expected Completion: 11/15/2017
Future I-22 All in Jefferson County
Tue, 12 Jan 2016 11:00:31 -0500
Road and bridge work at I-65 in Birmingham and on I-65 from Daniel Payne Drive (41st Avenue) to Walkers Chapel Road consisting of grade, drain, base and pave, signing, lighting, bridge removal, partial bridge replacement and bridges. - One-lane closures permitted Sunday thru Thursday 9 PM to 5 AM, Friday 10 PM to 7 AM and Saturday 10 PM to 8 AM. Two-lane closures permitted Sunday 12 AM to 3 AM, Monday thru Thursday 11 PM to 3 AM, Friday 12 AM to 4 AM and Saturday 12 AM to 5 AM. - Expected Completion: 5/15/2016
Future I-22 All in Jefferson County
Wed, 08 Jul 2015 11:00:54 -0500
Road work consisting of final base and pave from CR 77 (Coalburg Road) to I-65 and to include the partial signing and striping from west of the U.S. 78 (AL 4) interchange to I-65. - Heavy equipment working adjacent to roadway. Delays and lane closures possible. - Expected Completion: 8/15/2016
I-20/59 All in Jefferson County
Wed, 08 Jul 2015 09:16:21 -0500
Road and bridge work on I-59/I-20 at 31st Street North and 12th Avenue North consisting of grade, drain, base and pave, retaining walls, bridge removal, bridge replacement, approaches and signals. - Heavy equipment working adjacent to roadway. Delays and lane closures possible. - Expected Completion: 2/15/2017
source: Alabama DOT

IN CASE OF EMERGENCY CALL 911 OR *HP (*47 from your cell phone). ALDOT Emergency Call Center (when activated) Number 1-888-588-2848 - FOR NON-EMERGENCIES, CALL 211

Bessemer AL Traffic Nearby

More Local Information

Bookmark and Share

Bessemer weather and traffic updates by locals

Write your own Bessemer, Alabama report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read the Terms of Service and the Bessemer, AL report and/or forecast you are posting is in compliance with such terms. Be respectful. An inappropriate Bessemer, AL report and/or forecast will be removed by a moderator.