Clovis, NM Traffic and Road Conditions

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Clovis Traffic Alerts

Title: NM 45 Coors Boulevard between Montano Boulevard and Irving Boulevard Milepost 18.07 to 20.9
Description: August 29 to October 25, 2016 Crew hours: 8 p.m. 5 a.m. nightly. NMDOT with Contractor: Mountain States Constructors, Inc. will be doing pavement preservation work as well as ADA ramp and sidewalk reconstruction. Various lane closures and sidewalks closed for construction. NMDOT Project Manager: Emiliano Martinez. Project A300016/A300018.
Post Date: 2016-08-24 15:23:46.0
Update Date: 2016-09-15 10:11:46.0
Expiration Date: 2016-10-27 01:00:00.0
Title: US 380 eastbound and westbound at mile marker 107 Hondo
Description: Trucks over 65 foot are prohibited on US 380 between Hondo and Carrizozo. This is a PERMANENT ALERT.
Post Date: 2016-06-22 11:07:22.0
Update Date: 2016-09-23 08:53:17.84
Expiration Date: unknown
Title: US 380 eastbound and westbound at mile marker 66 Carrizozo
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.
Post Date: 2016-06-22 11:06:27.0
Update Date: 2016-09-23 08:53:17.84
Expiration Date: unknown
Title: Rio Bravo Boulevard (NM 500) between University Boulevard and Broadway Boulevard
Description: Right and left lanes closed on Rio Bravo at I 25 for pothole repair. Sept. 15-29 from 9 a.m. - 3 p.m. Contractor: Cobb Fendley
Post Date: 2016-09-14 13:51:29.0
Update Date: 2016-09-14 13:51:29.0
Expiration Date: 2016-09-29 17:00:00.0
Title: Interstate 10 from mile marker 140 Mesilla (NM 28/MESILLA) to mile marker 143 Tortugas
Description: The New Mexico Department of Transportation (NMDOT) along with La Calerita Construction (Contractor) continues with work at the I-10/Ramp E Bridge and the I-10/Union Avenue Bridge in Las Cruces, New Mexico. There will be intermittent lane closures. The contractor will still be working over the next three to four weeks that may require shoulder work traffic control or day time short duration lane closures. There will be shoulder work signs installed when contractor is working on medians. San Bar (Contractor) will be completing the guardrail installation at east bound on ramp beginning Monday, June 20th. Please pay attention to the traffic control signs and watch out for workers and equipment.
Post Date: 2015-08-12 09:38:37.0
Update Date: 2016-09-22 07:26:00.626
Expiration Date: unknown
Title: New Mexico 344 northbound and southbound from mile marker 0 Edgewood to mile marker 2
Description: (NMDOT) will begin roadway work and ADA improvements on NM 344 from mile marker 0.218 to mile marker 0.557 in Edgewood. -Starting August 16, 2016, the NM 344 northbound lanes will be reduced to one lane. Northbound NM 344 will have a right lane closure and NM 344 / Church St. east side intersection closure that will remain in effect until mid-September. Once the roadway work and ADA improvements along northbound NM 344 intersection have been completed, the contractor will then begin ADA improvement work on the west side of NM 344 / Church St. intersection -In mid September thru mid-October, the Intersection of NM 344 / Church Street will be OPENED. This project is scheduled to be completed end of October, 2016; weather permitting.
Post Date: 2016-08-16 15:35:09.0
Update Date: 2016-09-19 16:04:39.235
Expiration Date: 2016-10-31 17:00:00.0
Title: New Mexico 90 from mile marker 40 to mile marker 33
Description: The New Mexico Department of Transportation along with Braiser Asphalt (Contractor) will be performing roadway rehabilitation operations on NM 90 from MP 33.8 to MP 40.8 in Grant Co. Construction will begin Thursday, August 18, 2016 and is expected to be completed by Fall 2016. Highway traffic will encounter a single lane drop at times. Motorists are asked to reduce speed, obey posted signs, and use extreme caution, and be cautious of personnel in the area. The closure will be in affect from 6:00 am to 7:00 pm Monday through Saturday.
Post Date: 2016-08-16 07:26:48.0
Update Date: 2016-09-22 07:26:00.626
Expiration Date: unknown
Title: US 64 eastbound and westbound from mile marker 2 to mile marker 3 Beclabito
Description: New Mexico Department of Transportation will begin road work construction on US 64 from mile marker 2.80 to mile marker 3.80 near Beclabito northwest of Shiprock. This roadway improvement project will include the installation of two new school bus stops. Starting September - November 7, from 7:00 a.m. to 5:00 p.m., the US 64 eastbound lanes will be reduced to one lane. The contractor will be constructing new lanes to the school bus stop and new turnouts. Traffic can expect delays during this time. This project is scheduled for completion in mid-January of 2017; weather permitting. Old Castle SW Group of Farmington, New Mexico is the contractor for this project.
Post Date: 2016-09-06 17:00:52.0
Update Date: 2016-09-19 16:04:39.235
Expiration Date: 2017-02-01 00:00:00.0
Title: Interstate 40 northbound and southbound from mile marker 233 to mile marker 239 (McKENZIE)
Description: Bridge improvement work on I-40 from mile marker 233.705 to mile marker 239.428 east of Clines Corners. There are two bridges under construction; the I-40 Bridge (Exit 234) near the Flying "C" and the I-40 Bridge (Exit 239) at McKenzie. DAY TRAFFIC IMPACTS: I-40 Bridge (Exit 234) near the Flying C Ranch cross road over I-40 is reduced to one lane of travel. There is a temporary signal light that will guide traffic across the bridge. The I-40 Bridge (Exit 239) on and off ramps at McKenzie are CLOSED. The cross road over I-40 is reduced to one lane of travel. This bridge work is scheduled to be completed Fall of 2016.
Post Date: 2016-05-03 16:53:35.0
Update Date: 2016-09-19 16:04:39.235
Expiration Date: unknown
Title: US 380 eastbound and westbound at mile marker 43
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a permanent alert and will not be updated regularly.
Post Date: 2014-12-02 15:01:56.003
Update Date: 2016-09-23 08:53:17.84
Expiration Date: unknown
Title: New Mexico 6 at mile marker 35 Los Lunas, right lane closed.
Description: NM 6 eastbound right lane closed at Rio Grande river bridge (MP 35) Sept. 27-30 9 a.m. 4:30 p.m. for utility work. Contractor: Cablecom
Post Date: Thu Sep 22 16:12:21 MDT 2016
Update Date: 2016-09-23 08:25:23.0
Expiration Date: Sun Oct 02 00:00:00 MDT 2016
Title: Interstate 10 westbound at mile marker 164 Anthony
Description: Anthony Vistor Center closed at this time, rest area still open.
Post Date: 2016-09-22 14:53:42.0
Update Date: 2016-09-22 14:53:42.0
Expiration Date: unknown
Title: New Mexico 24 from mile marker 27 to mile marker 28
Description: Motorists please use caution and reduce speed on NM 24 at mm 27 to mm 28.2 (East of Pinon) until repairs can be completed on the highway.
Post Date: 2016-09-08 08:35:36.0
Update Date: 2016-09-23 08:53:17.84
Expiration Date: unknown
Title: Interstate 25 northbound and southbound from mile marker 276 (NM 599) to mile marker 278 (NM 14)
Description: Santa Fe - I-25//NM 14 (Cerrillos Road) DIVERGING DIAMOND INTERCHANGE: This project is scheduled to be completed in winter of 2016. There is a 10 width restriction on NM 14. Speed is reduced. Double Fines are in effect.. TRAFFIC IMPACTS I-25: On September 24, the I-25 northbound lanes at the mile marker 278.00 will be reduced to one lane from 8:00 a.m. to 5:00 p.m. I-25 Exit 278 (Cerrillos Road) northbound off ramp will be CLOSED from 10:00 p.m. to 2:00 p.m. Traffic will be detoured to Exit 276 (NM 599) to the West Frontage Road to access NM 14 (Cerrillos Road). Traffic Advisories and updates on this project will be posted on the New Mexico Department of Transportations road conditions website, http://nmroads.com/. You can also call the NMDOTs road hotline at 511 or 1-800-432-4269. ### For more information on the DDI please visit. http:://www.santafeddi.com/
Post Date: Thu Jun 04 12:18:32 MDT 2015
Update Date: 2016-09-23 18:22:21.0
Expiration Date: unknown
Title: New Mexico 68 northbound and southbound at mile marker 20
Description: NMDOT will begin bridge rehabilitation work at the Jct. of NM 68 & NM 75 at mile marker 20.80 north of Espanola near the Dixon turn off. The bridge rehabilitation will include concrete deck repairs, replacement of bridge joints and bridge railing. TRAFFIC IMPACTS: Starting Monday August 8th, the NM 68 northbound and southbound lanes will be reduced to one lane. There will be a flagger operation guiding traffic through the work zone from 6:00 a.m. to 8:00 p.m. Monday through Friday. Motorists can expect delays during this time. This work is scheduled to be completed end of August 2016. NMDOT thanks you for your patience during this bridge improvement project. The contractor for this project is Hasse Contracting Co. of Albuquerque, New Mexico. Drivers are urged to proceed with caution through the work zone, observe traffic control signs and reduce speed to the posted limit.
Post Date: 2016-08-04 15:54:11.0
Update Date: 2016-09-19 16:04:39.235
Expiration Date: unknown
Title: Dr. Martin Luther King Jr. Ave. NE (Under I-25) from Locust St. to Cedar St. (Under I-25) various lanes closed for multi transportation improvements.
Description: Through September 30, 2016; 9 a.m. - 4 p.m. or 9 p.m. - 5 a.m. for multi transportation improvement project. Contractor: TLC Plumbing.
Post Date: 2016-09-01 13:47:57.0
Update Date: 2016-09-15 09:13:30.0
Expiration Date: 2016-09-30 12:00:00.0
Title: New Mexico 556 northbound and southbound from mile marker 7 to mile marker 15
Description: 9/6/2016 to 9/27/2016 for Road Maintenance. Crew Hours: 9 p.m. - 5 a.m. Sunday night through Friday Morning until Sept. 27. There will be single lane closures. Crews will be working on Tramway from County Line Road to Central Avenue. The bicycle/pedestrian path on Tramway will also be treated following roadwork. Signs are in place near the workzone. Contractor: Dismuke Construction Company. Project Manager: Rick Matteson, NMDOT.
Post Date: 2016-09-01 12:49:28.0
Update Date: 2016-09-15 09:10:17.0
Expiration Date: 2016-09-29 01:00:00.0
Title: Interstate 25 at mile marker 284 (OLD PECOS TRAIL)
Description: I-25 NB at Old Pecos Trail - CLOSED - DUE TO MOTOR VEHICLE ACCIDENT. TRAFFIC IS BEING DIVERTED TO OLD LAS VEGAS HWY.. EXPECT DELAYS.
Post Date: Sun Sep 25 01:46:45 MDT 2016
Update Date: 2016-09-25 01:48:37.0
Expiration Date: unknown
Title: US 82 at mile marker 16 Cloudcroft
Description: US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles! STEEP GRADES, NUMEROUS TIGHT TURNS AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route - US 62/180 or US 70. This is a permanent alert. (lc).
Post Date: 2015-10-25 15:29:32.0
Update Date: 2016-09-23 08:53:17.84
Expiration Date: unknown
Title: New Mexico 519 from mile marker 0 La Madera to mile marker 14
Description: NM 519 - NMDOT will begin chipseal operations on Wednesday August 31. NM 519 will be reduced to one lane with a flagger and pilot car operation guiding traffic through the work zone. Lane closures will be in effect Monday through Friday. Project is scheduled to be completed end of September 2016.
Post Date: 2016-08-29 16:38:21.0
Update Date: 2016-09-19 16:04:39.235
Expiration Date: unknown
Title: New Mexico 95 at mile marker 1
Description: NM 95 - Bridge rehabilitation project on NM 95 for mile marker at 1.00. TRAFFIC IMPACTS: There is an 11' width restriction. There is a one lane closure at the bridge with a temporary signal that will guide traffic through the work zone. The contractor is Kimo Construction. This project is scheduled to be completed end of November 2016; weather permitting.
Post Date: 2016-08-29 08:43:01.0
Update Date: 2016-09-19 16:04:39.235
Expiration Date: unknown
Title: US 550 at mile marker 151
Description: US 550- Mile Marker 150.85 #8243 Farmington - The contractor will be completing bridge deck grinding, replacing bridge railing and bridge deck overlays. TRAFFIC IMPACTS: The US550 northbound and southbound lanes will be reduced to one lane in each direction. The contractor will be working on bridge deck seal overlay is scheduled for mid-September. NMDOT thanks you for your patience during this bridge improvement project.
Post Date: 2016-04-18 11:04:18.0
Update Date: 2016-09-19 16:04:39.235
Expiration Date: 2016-10-01 08:00:00.0
Title: New Mexico 273 at mile marker 1
Description: The Texas Department of Transportation has closed McNutt Road at the Rio Grande in Anapra/Sunland Park until further notice due to the Loop 375 construction project. Please follow detour signs to Racetrack Drive then onto Doniphan Drive.
Post Date: 2015-11-16 08:13:18.0
Update Date: 2016-09-22 07:26:00.626
Expiration Date: unknown
Title: Interstate 25 at mile marker 1 (UNIV PARK/NMSU)
Description: The New Mexico Department of Transportation (NMDOT) along with FNF Construction (Contractor) continues work along I-25 between Lohman Avenue (Exit 3) and University Avenue (Exit 1). No work is scheduled for next week, pending subcontractor items.
Post Date: 2016-02-08 07:33:53.0
Update Date: 2016-09-22 07:26:00.626
Expiration Date: unknown
Title: US 70 eastbound and westbound at mile marker 185
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a permanent alert.
Post Date: 2016-06-06 10:05:20.0
Update Date: 2016-09-23 08:53:17.84
Expiration Date: unknown
Title: US 54 from mile marker 113 to mile marker 114
Description: Due to pavement conditions on US 54 at mm 113 to mm 114.4 (South of Carrizozo) SPEED LIMIT is reduced to 45 MPH until further notice.
Post Date: 2016-08-26 10:07:33.0
Update Date: 2016-09-23 08:53:17.84
Expiration Date: unknown
Title: New Mexico 183 from mile marker 0 to mile marker 1
Description: The New Mexico Department of Transportation (NMDOT) will be performing minor pavement preservation operations (Chip Sealing) on NM 183 from mile post 0 to mile post 1.2 in both lanes. Construction will begin Monday, August 22, 2016 and is expected to be completed by the end of September. Traffic will encounter a single lane drop with a flag man and pilot car operation from 7 am to 4 pm, Monday thru Friday. Motorists are advised to use caution and reduce speed while nearing and passing through the work zone being cautious of trucks turning and workers in the area. No center stripe and loose gravel.
Post Date: 2016-08-19 08:10:25.0
Update Date: 2016-09-22 07:26:00.626
Expiration Date: unknown
Title: Interstate 40 eastbound and westbound from mile marker 93 to mile marker 95
Description: East and Westbound I-40 is reduced to one lane from mile marker 93-95 (from east of Skyway to west of McCartys) due to roadwork. Speed reduced to 55mph. All work will be performed from 6:30am- 7pm daily. Expect minor delays. This event will be updated as conditions change.
Post Date: 2016-03-18 08:19:14.0
Update Date: 2016-06-06 13:03:33.0
Expiration Date: unknown
Title: Interstate 40 eastbound and westbound from mile marker 46 to mile marker 48 Continental Divide
Description: East and Westbound I-40 reduced to one lane from mile marker 46-48 (Continental Divide) with a 12 ft. width restriction in force, due to roadwork. Speed reduced to 55 mph through the work zone. All work will be performed from 6:30am-7pm daily. Expect minor delays. This event will be updated as conditions change.
Post Date: 2016-03-18 08:16:59.0
Update Date: 2016-06-02 09:22:02.0
Expiration Date: unknown
Title: Interstate 10 from mile marker 20 (LORDSBURG WEST) to mile marker 25
Description: The New Mexico Department of Transportation (NMDOT) along with Mountain States Constructors, Inc. (Contractor) will be performing roadway rehabilitation operations to Interstate 10 (I-10) in Hidalgo Co. Construction will begin Monday, August 15, 2016 and is expected to be completed by fall 2016. Interstate traffic will encounter a single lane drop at times with eastbound and westbound exits closed off to all traffic as needed. Motorists are asked to reduce speed, obey posted signs, and use extreme caution, and be cautious of personnel in the area. The closure will be in affect from 4:00 am to 7:00 pm.
Post Date: 2016-08-12 14:49:03.0
Update Date: 2016-09-22 07:26:00.626
Expiration Date: unknown
Title: US 550 from mile marker 105 to mile marker 115
Description: US 550 - Star Paving Construction will be Fog sealing the shoulders and will continue northbound and southbound north of MM 87 and progress toward MM 115.3. Fog sealing of the shoulders in District 5 to MM 115.3 is ongoing and should complete on August 23
Post Date: 2016-08-12 10:12:33.0
Update Date: 2016-09-19 16:04:39.235
Expiration Date: unknown
Title: Interstate 40 eastbound and westbound from mile marker 238 to mile marker 239 (McKENZIE)
Description: Clines CornersThe New Mexico Department of Transportation (NMDOT) continues bridge replacement work on I-40 from mile marker 238.00 mile marker 239.24 at the Guadalupe and Torrance County line east of Clines Corners. This project is scheduled to be completed in Fall of 2016. TRAFFIC IMPACTS: The I-40 eastbound and westbound lanes will be reduced to one lane in each direction. There will be concrete barrier wall separating the eastbound and westbound lanes. There is a 12 lane width restriction.
Post Date: 2016-03-11 16:04:37.0
Update Date: 2016-09-19 16:04:39.235
Expiration Date: unknown
Title: New Mexico 14 from mile marker 51 to mile marker 52
Description: City of Santa Fe Reconstruction Project: Phase IIC of the Cerrillos Road (NM 14) Roadway Reconstruction from Camino Carlos Rey to Llano Street. Project scheduled for substantial completion in October of 2016. TRAFFIC IMPACTS:Cerrillos Road will be reduced to one-lane traffic in each direction through the intersection of St. Michaels/Osage. Left turn movements will be allowed during the lane reduction. This reduction is required to complete storm drain and waterline construction All traffic has been detoured onto the newly constructed lanes. The contractor is working on the south side of the road with removals and new waterline. The traffic will be in this configuration for the duration of the project. For additional project information please see the following links: Please continue to use caution going through the construction zone and adhere to the posted signage and speed limit of 25MPH. For additional questions on the project contact City of Santa Fe Project Engineer, David Quintana by email ddquintana@ci.santa-fe.nm.us or by phone 505-995-7762
Post Date: 2016-03-11 15:46:49.0
Update Date: 2016-09-19 16:04:39.235
Expiration Date: 2016-11-02 01:00:00.0
Title: New Mexico 434 from mile marker 26 Black Lake to mile marker 36
Description: (Black Lake to Angel Fire) A one lane closure with flagging and pilot car operations will be set up and closures will be taken down daily. Operations will be from 7:00 a.m. to 7:00 p.m. Speed is reduced to 35 mph. Please use caution in area.
Post Date: 2016-09-09 12:21:21.0
Update Date: 2016-09-09 12:21:21.0
Expiration Date: unknown
Title: Interstate 40 northbound at mile marker 274 Santa Rosa
Description: Santa Rosa, NM: west bound median driving lane. A one lane closure is set up and will remain in place 24 hours per day through September 30. Speed is reduced to 55 mph. As you travel through the work zone, reduce your speed, adjust your lane position away from workers, and prepare for the unexpected. Please note the schedule may change due to inclement weather or other unexpected conditions.
Post Date: 2016-09-09 12:09:07.0
Update Date: 2016-09-16 08:43:08.0
Expiration Date: 2016-10-01 00:00:00.0
Title: New Mexico 159 from mile marker 8 to mile marker 10
Description: The NMDOT along with La Calerita Construction, LLC, (Contractor) will perform Roadway & Drainage Improvements on NM 159 beginning Monday, August 8th with expected completion fall of 2017. Traffic will encounter a single lane drop at times. Motorists are asked to reduce speed, obey posted signs, and use extreme caution, and be cautious of personnel in the area. The lane closures will be in affect from Monday thru Friday 7:00 am to 5:30 pm. Business will remain open during the season.
Post Date: 2016-08-05 13:29:00.0
Update Date: 2016-09-22 07:26:00.626
Expiration Date: unknown
Title: Interstate 25 eastbound and westbound from mile marker 322 to mile marker 324
Description: (Sunshine area) A one lane closure will be set up for the east and west bound passing lanes. Speed reduced to 55 mph. Please use caution in area.
Post Date: Fri Sep 02 13:52:13 MDT 2016
Update Date: 2016-09-16 10:53:44.0
Expiration Date: Sat Oct 29 01:00:00 MDT 2016
For official NM traffic info visit: New Mexico DOT Traffic Site

Clovis NM Traffic Nearby

More Local Information

Bookmark and Share

Clovis weather and traffic updates by locals

Write your own Clovis, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read the Terms of Service and the Clovis, NM report and/or forecast you are posting is in compliance with such terms. Be respectful. An inappropriate Clovis, NM report and/or forecast will be removed by a moderator.