Las Vegas, NM Traffic and Road Conditions

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Las Vegas Traffic Alerts

Title: NM 104 from mile marker 63 to mile marker 64.
Description: (Viadero) Bridge replacement work -- 2 detours setup with speed reduced to 35 mph. Please reduce speed and use caution in area. Event will be updated as condition changes.
Post Date: 2017-11-22 09:22:26.0
Update Date: 2018-06-22 08:29:58.374
Expiration Date: unknown
Title: US 380 at mile marker 43
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. THIS IS A PERMANENT ALERT.
Post Date: 2017-05-17 14:04:16.0
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: New Mexico 68 from mile marker 41 to mile marker 44
Description: NMDOT - Roadway improvement project on Paseo de Pueblo Sur (NM 68) - Intersection of NM 68 and NM 518 heading north on NM 68, Traffic Impacts: Chamisa Road will be CLOSED at the intersection of Paseo Del Pueblo Sur (NM68). Traffic cane use Este Es Road and Salazar Road as alternate routes. Chamisa Road is scheduled to be closed until July, 2018. -NM 68 northbound and southbound lanes will be reduced to one lane Monday through Friday from 6:30 a.m. to 6:00 p.m. Motorists can expect delays during this time.
Post Date: 2017-08-16 17:07:36.0
Update Date: 2018-06-12 16:44:19.0
Expiration Date: unknown
Title: US 62 eastbound and westbound from mile marker 89 to mile marker 102
Description: Pavement Rehabilitation work isunderway on US 62/180 West of Hobbs between mm 89 and mm 102 ( Intersection US62/180 & W Bypass to Intersection of US 62/180 and NM 529). Completion is expected July 6, 2018 - weather permitting. Motorists can expect a one lane closure with traffic directed to the right or left lane as work progresses both east and westbound. Please reduce your speed, obey all posted signage and watch for Personnel and Equipment in this area. Contractors will be Braiser Asphalt and Cutler Repaving Inc. NMDOT Contact Donna Gililland 575-626-4857.
Post Date: 2018-04-11 08:32:54.0
Update Date: 2018-06-19 09:04:47.0
Expiration Date: unknown
Title: US 64 from mile marker 20 to mile marker 25
Description: US 64 - Farmington - Navajo Division Transportation will begin a street lighting project on U.S. 491from mile marker 89.00 to 94.00 and on U.S. 64 from mile marker 20.00 to mile marker 25.00 in Shiprock. Starting April 9, 2018, there will be one lane closures and shoulder activity on U.S. 491 and U.S. 64. Motorists can expect minor delays from 7:00 a.m. to 5:00 p.m. Monday through Friday. Project is scheduled for completion mid-June
Post Date: 2018-04-11 08:24:01.0
Update Date: 2018-04-11 08:25:30.0
Expiration Date: unknown
Title: US 550 eastbound and westbound at mile marker 1.
Description: US 550 westbound Project A301232/A301233 milepost 1 to 2: Through September 15th, 2018, US 550 northbound & southbound will have various lane and shoulder restrictions between Santa Ana Rd and Jemez Canyon Dam Rd. Project website www.keepmoving550.com Contractor: FNF Construction NMDOT Project Manager: Patsy Najar
Post Date: 2018-06-06 15:20:16.0
Update Date: 2018-06-21 08:05:43.0
Expiration Date: 2018-10-03 17:38:00.0
Title: I 40 eastbound and westbound at mile marker 163 (Louisiana).
Description: I-40 westbound at Louisianan milepost 163 Project A300079: Through August 31st I-40 eastbound and westbound on & off ramp to Louisiana Blvd and Louisiana Blvd northbound and southbound will have various lane & ramp restrictions. Work is being performed for Interchange maintenance. Contractor: AUI Inc NMDOT Project Manager: Jeremy Maestas
Post Date: 2018-06-06 15:15:48.0
Update Date: 2018-06-21 08:12:55.0
Expiration Date: 2018-09-02 16:02:00.0
Title: I 25 at mile marker 220 (RIO BRAVO).
Description: I-25 at NM 500 (Rio Bravo) milepost 220.5 Interchange Project A300280: Through summer of 2019; there will be continuous lane and shoulder closures /restrictions of NM 500 (Rio Bravo) and I-25 northbound and southbound. Work is being performed to facilitate a new NM 500 (Rio Bravo) Interchange with I- 25. Project website www.I25RioBravo.com Contractor: AUI Inc NMDOT Project Manager: Emiliano Martinez
Post Date: 2017-08-02 16:56:37.0
Update Date: 2018-06-21 08:15:41.0
Expiration Date: 2019-08-23 19:39:00.0
Title: I 25 southbound at mile marker 460 (RATON PASS/PORT OF ENTRY).
Description: Alert I-25 northbound at mile marker 450 Alert French Port of Entry utility repairs -. Please reduce speed and use caution in area
Post Date: 2018-05-22 07:38:21.0
Update Date: 2018-06-22 08:29:58.374
Expiration Date: unknown
Title: New Mexico 524 at mile marker 7
Description: The Intersection of Standpipe Road and NM 524 (Lea Street) in Carlsbad is CLOSED for construction at the intersection. There will be limited access to the road in this location. Business access will be maintained at all times. A Detour is in place and Motorists are asked to reduce speed and follow all posted construction and detour signs. Please watch for construction personnel and equipment at this location. Completion is expected in the Fall 2018. Contact: J & H Services Inc. 505-896-9428
Post Date: 2018-02-20 10:36:26.0
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: New Mexico 30 at mile marker 6
Description: NMDOT Roadway Reconstruction from milepost 7.150 to milepost 7.610 in the Pueblo of Santa Clara. TRAFFIC IMPACTS: NM 30 in the Pueblo of Santa Clara. NM 30 will have one lane of travel in each direction at all times. The speed limit is reduced to 25 mph in the work zone. All side streets to the west side of the Santa Clara Pueblo, with the exception of Dawn Road will be OPENED to Santa Clara Pueblo local traffic. Motorists are advised to watch for heavy truck traffic turning in and out of the work zone. Motorist can use US 84/285 to NM 502 as an alternate route to commute to and from Los Alamos
Post Date: 2017-04-11 14:33:23.0
Update Date: 2018-06-12 16:23:03.0
Expiration Date: unknown
Title: US 285 at mile marker 277 Ribera
Description: U.S. 285 between Lamy and Clines Corners.- Bridge Rehabilitation Work Starting June 5 The U.S. 285 northbound and southbound lanes will be reduced to one lane. A temporary signal will guide motorists through the work zone throughout the duration of the project. Project is scheduled to be completed end of July 2018; weather permitting The contractor is working Monday through Friday from 7:00 a.m. to 5:00 p.m.
Post Date: 2018-06-05 14:26:40.0
Update Date: 2018-06-05 14:26:40.0
Expiration Date: unknown
Title: US 285 northbound and southbound at mile marker 1
Description: TXDOT - Work on U.S. Highway 285 ( Texas) has hit a critical junction that will severely affect traffic patterns between Pecos TX and Orla TX in Reeves County Texas starting Monday, April 9, 2018. A bridge-class culvert will be replaced at 4-Mile Draw. The work will leave only one lane available for traffic to cross the culvert. Temporary traffic signals will be in operation around the clock at the culvert. Running a red light in this situation could be absolutely catastrophic. The lane will be limited to 11-foot wide loads. The physical structure will be very narrow and will not be wide enough to allow two vehicles to pass or to allow wide loads to cross. The speed limit in the work zone is 45 miles per hour. The culvert work is expected to leave only one lane of travel available for the next two months. Delays can be expected. Alternate routes are strongly encouraged if possible. Motorists are reminded that state law requires them to obey pilot cars and warning signs as well as any flaggers encountered in the work zone. This is part of a project to improve about 10.8 miles of Highway 285 between County Road 232 and Orla (RM 652) north of Pecos. Constructors Inc. of Carlsbad, N.M., won the project with a low bid of $12,525,496. A second project is under way just to the south of this project. Two additional projects for U.S. Highway 285 are scheduled for bid openings in April and May. For more information, contact Gene Powell at gene.powell@txdot.gov or (432) 498-4746.
Post Date: 2018-04-03 15:49:49.0
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: I 40 from mile marker 262 to mile marker 269.
Description: Lane Closure - San Ignacio -- passing lane is closed for paving operations. Operations 7:00 a.m. to 7:00 p.m. 12' width restriction. Event will be updated as conditions change.
Post Date: 2018-05-01 07:22:14.0
Update Date: 2018-05-07 12:06:14.0
Expiration Date: unknown
Title: New Mexico 96 at mile marker 45
Description: NM 96 - NMDOT bridge rehabilitation work (Canones Creek) in Abiquiu. NM 96 eastbound and westbound lanes will be reduced to one lane. Temporary signals will guide traffic through the work zone Monday through Friday. The temporary signals will be removed and all lanes will be opened to traffic on the weekends. This project is scheduled to be completed winter of 2018. Drivers are urged to watch for workers in the area, observe traffic control signs and reduce speed to the posted speed limit.
Post Date: 2018-04-26 09:17:45.0
Update Date: 2018-06-14 19:12:03.0
Expiration Date: unknown
Title: New Mexico 456 from mile marker 20 to mile marker 38
Description: Unpaved road -- may be impassable during inclement weather proceeed at your own risk.
Post Date: 2015-06-25 16:19:56.0
Update Date: 2018-06-22 08:29:58.374
Expiration Date: unknown
Title: New Mexico 273 from mile marker 1 to mile marker 3 Sunland Park
Description: Constructors, Inc. (Contractor) will begin with roadway reconstruction, rehabilitation, signalization & lighting along NM 273 "McNutt Rd". Beginning on Tuesday, May 29th, traffic may encounter temporary lane closures throughout the project while preliminary work begins. The contractors hours of operation will be from 6:30 am to 5:30 pm, Monday through Friday. Construction is expected to be completed by fall 2019.
Post Date: 2018-05-24 07:56:38.0
Update Date: 2018-06-22 08:40:57.895
Expiration Date: unknown
Title: NM 14 at mile marker 1 San Antonio.
Description: NM 14 Project A301443: Through June 29th from 6:30 AM to 6:30 PM NM 14 northbound and southbound will have various lane, shoulder, and multi-use trail restrictions for infrastructure repair. Contractor: Mountain States Construction NMDOT Project Manager: Patsy Najar
Post Date: 2018-02-22 10:56:55.0
Update Date: 2018-06-21 08:11:57.0
Expiration Date: 2018-07-14 00:25:00.0
Title: US 180 from mile marker 25 to mile marker 32
Description: Only single lane traffic is allowed on US 180 from mile marker 25-32 (south of NM 12) due to a wildfire. Flag personnel and a pilot vehicle will guide traffic through the wildfire zone. Heavy smoke in the area. Expect delays. Please drive with caution reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: Thu Jun 21 20:50:06 MDT 2018
Update Date: 2018-06-22 13:28:04.0
Expiration Date: unknown
Title: US 70 from mile marker 324 to mile marker 325.
Description: Construction Closure Bridge Rehabilitation work is underway on US 70 West of Roswell between mile marker 324.5 and mile marker 325.386. Both Eastbound lanes will be closed to traffic at this time. Eastbound traffic will be detoured to the inside Westbound lane at this location. Westbound traffic will be reduced to the right hand outside lane. Speed Limit is reduced to 45 MPH within the work zone. An 11 FOOT WIDTH RESTRICTION is in place for the detour. Wide and Oversized loads should seek an alternate route. Motorists should obey all posted speed limits and construction signage and watch for Personnel and Equipment in this area. Completion is expected in the Winter of 2019. Contractor: Hasse Contracting Inc. Travis Hasse, Project Manager 505-263-2558; Alejandro Tarango, Superintendent 505-331-3967; Traffic Control Supervisor Robert Thomas, 575-626-3552; NMDOT Acting Project Manager Donna Gililland, 575-626-4857.
Post Date: Thu Jun 21 10:37:33 MDT 2018
Update Date: 2018-06-21 10:37:37.0
Expiration Date: unknown
Title: NM 423 eastbound at mile marker 10.
Description: NM 423 (Paseo Del Norte) eastbound & westbound at Ventura Drive milepost 10.4: Through July 11th, 2018 NM 423 (Paseo Del Norte) eastbound will have a continuous right lane & shoulder restriction. Work is being performed for commercial development. Contractor: TLC Plumbing & Utility
Post Date: 2018-06-21 08:19:27.0
Update Date: 2018-06-21 08:19:27.0
Expiration Date: 2018-07-13 08:18:00.0
Title: NM 22 eastbound and westbound at mile marker 1.
Description: NM 22 Milepost 0 to 1.5: Through July 27th from 8:00 AM to 5:00 PM NM 22 eastbound and westbound will have various lane and shoulder restrictions for infrastructure exploration. Contractor: Terracon
Post Date: 2018-06-21 08:18:02.0
Update Date: 2018-06-21 08:18:02.0
Expiration Date: 2018-07-30 08:16:00.0
Title: New Mexico 187 from mile marker 9 Garfield to mile marker 18
Description: The New Mexico Department of Transportation (NMDOT) will be performing "Chip Sealing" with Brooming and Fog Sealing operations in Dona Ana Co. Speed limit will be reduced, no center stripe and loose gravel on roadway. Traffic will encounter lane drops with pilot car and flagging operations. Hours of operation will be from 8:00 am till 5:30 pm, Monday through Friday.
Post Date: 2018-05-17 14:44:18.0
Update Date: 2018-06-22 08:40:47.32
Expiration Date: unknown
Title: Signal Light and Drainage work
Description: Morrow Enterprises, Inc. (Contractor) will begin signal light and drainage work along the northbound shoulder of N. Main St. at Camino Del Rex. Traffic may encounter a lane drop and shoulder work in the area. Hours of operation will be from 8:30 am to 5:00 pm.
Post Date: 2018-05-17 14:40:10.0
Update Date: 2018-06-22 08:40:47.32
Expiration Date: unknown
Title: I 40 at mile marker 155 (COORS).
Description: I-40 eastbound Project A300078R: Through July 10th, 2018; Sunday through Friday from 9 AM to 5:30 AM the following day I-40 eastbound will have various lane and shoulder restrictions in place for concrete repair between NM 45 (Coors Blvd) interchange (milepost 155.6) and The BIG-I (milepost 159.5). Contractor: Structures Inc. NMDOT Project Manager: Jeremy Maestas
Post Date: 2018-06-14 07:54:13.0
Update Date: 2018-06-21 08:14:14.0
Expiration Date: 2018-07-13 16:04:00.0
Title: US 54 from mile marker 69 to mile marker 79 Tularosa
Description: Construction is underway between MP 69.56 and 78.16 between Alamogordo and Tularosa on US 54/70. Construction will consist of roadway reconstruction, concrete box culvert reconstruction and channel erosion mitigation. Work will be done various locations with in the project limits. Traffic is down to one lane in multiple areas. Detours are in place with traffic being switched to the North Bound lanes around the area of Dog Ranch Road MP 75 and Alamorosa MP 76 11 FOOT WIDTH RESTRICTIONS are in place for the traffic detour. The Speed Limit is reduced to 45 MPH with DOUBLE FINE ZONE applying to the Construction Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. A 12 FOOT WIDTH RESTRICTION is in place for the entire project and all Wide and Oversized Loads should seek an alternate route. Project is scheduled to be finished in the Fall of 2019. Brian J Torres NMDOT Project Manager 575-585-2090/575-626-4278 Brian Wanner Mountain States Constructors 505-506-4386
Post Date: 2018-04-12 08:22:13.0
Update Date: 2018-06-22 12:28:00.834
Expiration Date: unknown
Title: New Mexico 41 from mile marker 46 to mile marker 55
Description: Roadwork - NM 41 Clark Hill to Galisteo - Starting Monday March 26 - NM 41 will be reduced to one lane with a pilot car operation guiding traffic through the work zone. The pilot car will be in full operation 24 hours a day / seven days a week. Motorists can expect delays during this time. This project is scheduled to be completed November of 2018; weather permitting.
Post Date: 2017-11-09 08:44:22.0
Update Date: 2018-03-26 15:29:04.0
Expiration Date: unknown
Title: Interstate 10 from mile marker 2 (Vinton) to mile marker 22 (LORDSBURG)
Description: MWI, Inc. (Contractor) will begin installation of the Intelligent Transportation System (ITS). Traffic can expect intermittent lane closures and shoulder work in the area. Hours of operation will be from 7:00 am to 5:30 pm, Monday through Thursday. Construction is expected to be completed by fall 2018.
Post Date: 2018-06-07 12:57:07.0
Update Date: 2018-06-22 08:40:47.32
Expiration Date: unknown
Title: New Mexico 436 from mile marker 0 Garfield to mile marker 3
Description: The New Mexico Department of Transportation (NMDOT) will be performing "Chip Sealing" with Brooming and Fog Sealing operations in Sierra Co. Speed limit will be reduced, no center stripe and loose gravel on roadway. Traffic will encounter lane drops with pilot car and flagging operations.
Post Date: 2018-06-07 12:55:08.0
Update Date: 2018-06-22 08:40:47.32
Expiration Date: unknown
Title: Construction Closure
Description: NM 45 (Coors Blvd) northbound & southbound at Blake Intersection A300015: Through September 30th, 2018 from 7 AM to 5 PM the following day NM 45 (Coors Blvd) northbound & southbound at Blake Intersection will have various continual lane and shoulder restrictions for utility and infrastructure improvements. Contractor: AUI Inc w/ Bernalillo County
Post Date: 2018-05-03 14:15:31.0
Update Date: 2018-06-21 08:14:47.0
Expiration Date: 2018-10-05 08:36:00.0
Title: US 82 at mile marker 16 Cloudcroft
Description: US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles! STEEP GRADES, NUMEROUS TIGHT TURNS AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route - US 62/180 or US 70. THIS IS A PERMANENT ALERT. (lc).
Post Date: 2015-10-25 15:29:32.0
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: Conditions exist throughout Hidalgo county.
Description: WEATHER ADVISORY: High wind warning in Hidalgo County, visibility is low due to blowing dust. High profile vehicles please use caution. The NMDOT will continue monitoring Hidalgo roadway. This event will be updated as conditions change.
Post Date: 2018-06-23 14:53:14.0
Update Date: 2018-06-23 14:53:14.0
Expiration Date: unknown
Title: US 64 at mile marker 399
Description: (Clayton) Eastbound shoulder is closed long term. Speed reduced in area -- please use caution in area. Event will be updated as condition changes.
Post Date: 2017-10-30 12:03:38.0
Update Date: 2018-06-22 08:29:58.374
Expiration Date: unknown
Title: New Mexico 136 from mile marker 1 to mile marker 9
Description: FNF Construction, INC. (Contractor) continues with roadway reconstruction, roadway rehabilitation, bridge rehabilitation, signalization & lighting along NM 136 the Pete V Domenici Intl. Hwy. Traffic will encounter lane closures as well as detours with an 11 width restriction in effect throughout the project. Northbound and southbound traffic will be on the northbound lanes with single lanes in both directions divided by temporary concrete wall barrier. They will remain in this configuration until the next phase change in July. Contractors hours of operation will be from 7:00 am to 5:00 pm Monday to Friday; lane closures and traffic control shall remain in place 24 hours a day 7 days a week.
Post Date: 2017-10-30 08:54:19.0
Update Date: 2018-06-22 08:40:57.895
Expiration Date: unknown
Title: New Mexico 193 from mile marker 21 to mile marker 41
Description: Unpaved road -- may be impassable during inclement weather proceeed at your own risk.
Post Date: 2017-11-27 11:29:34.0
Update Date: 2018-06-22 08:29:58.374
Expiration Date: unknown
Title: New Mexico 176 from mile marker 37 to mile marker 40
Description: Roadwork Pavement Rehabilitation on NM 176 between mm 37.5 and mm 41 (east of Eunice and TX state line) will resume on Monday, June 25, 2018. Motorists can expect a one lane closure for paving operations where traffic will be reduced to one lane with traffic control flaggers and/or pilot car operations. This work is expected to be complete by June 30, 2018 weather permitting. Contractor: Brasier Asphalt Inc. NMDOT Project Manager: Michael Vigil 505-231-0868.
Post Date: 2018-03-26 11:39:50.0
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: New Mexico 15 from mile marker 0 to mile marker 2
Description: TLC Construction (Contractor) will be reconstructing the roadway, installing curb and gutter, sidewalk and bike lanes. NM 15 from HWY 180 to the 32nd street interchange will have one-way traffic only. Ranch Club Road is closed to through traffic at Ranch ClubPA Road intersection while the contractor is reconstructing the intersection. Detours will be in place and traffic is asked to reduce speed and use caution, seek an alternate route if possible. Contractors hours of operation will be from 7:00 am to 5:00 pm Monday to Friday; closures and traffic control shall remain in place 24 hours a day 7 days a week. Construction is scheduled to be completed by spring of 2019.
Post Date: 2018-03-26 07:37:34.0
Update Date: 2018-06-22 08:40:47.32
Expiration Date: unknown
Title: Interstate 10 eastbound and westbound from mile marker 84 to mile marker 100
Description: FNF Construction, INC. (Contractor) will continue with final striping and rumble strip application along Interstate 10. Multiple lane closures will be in effect on both the westbound and eastbound lanes. Motorists are asked to reduce speed, obey posted signs, use extreme caution, and be cautious of personnel in the area. Hours of operation will be from 6:00 am to 7:00 pm, seven days a week. Construction is expected to be completed by July 2018.
Post Date: 2018-02-26 07:45:27.0
Update Date: 2018-06-22 08:40:47.32
Expiration Date: unknown
Title: US 285 northbound from mile marker 55 Lakewood to mile marker 64 Atoka
Description: Roadwork Pavement Rehabilitation is ongoing on US 285 southbound lanes between mm 63.25 and mm 55 (between Artesia and Carlsbad). Motorists can expect a one lane closure for paving operations where traffic will be diverted into one southbound lane. Work is expected to be completed 6/22/18 - weather permitting. Please obey all posted signage, reduce your speed and watch for Personnel and Equipment in this area. Contractor: Cutler Repaving ; NMDOT Project Manager: Michael Vigil 505-231-0868.
Post Date: 2018-05-21 09:57:29.0
Update Date: 2018-06-22 08:54:07.236
Expiration Date: unknown
Title: New Mexico 511 from mile marker 18 to mile marker 32
Description: NM 511 - Pavement Preservation North of Navajo Dam to the Colorado State Line. NM 511 northbound and southbound lanes will be reduced to one lane with a flagger operation and pilot car escort Monday thru Thursday from 7:00 a.m. to 6:00 p.m. Traffic can expect delays during this time. Traffic is advised to reduce speed and use caution due to loose gravel on roadway. Project scheduled to be completed July 2018
Post Date: 2018-06-18 16:35:19.0
Update Date: 2018-06-18 16:35:19.0
Expiration Date: unknown
Title: New Mexico 547 northbound and southbound at mile marker 1
Description: Roadwork to begin on NM 547, mile marker 1 (Roosevelt Ave in Grants - from 1st Street to Dollar General). Traffic will be reduced to one lane in both directions beginning Tuesday, 6/19 at 7am. Flag personnel and pilot vehicle will guide traffic through the work zone. Expect minor delays or use an alternate route. All work will be performed Tuesday, 6/19 through Friday, 6/29 with work hours beginning 7am to 6pm daily. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2018-06-18 16:07:38.0
Update Date: 2018-06-22 07:41:05.324
Expiration Date: 2018-06-29 18:00:00.0
Title: US 285 southbound from mile marker 158 to mile marker 146.
Description: Roadwork Pavement Rehabilitation will begin Monday, June 25, 2018 on US 285 southbound lanes between mm 158 and mm 146 (between Vaughn and Roswell). Motorists can expect a one lane closure for paving operations where traffic will be diverted into one southbound lane. Work is expected to be completed 8/16/18 - weather permitting. Please obey all posted signage, reduce your speed and watch for Personnel and Equipment in this area. Contractor: Cutler Repaving ; NMDOT Project Manager: Michael Vigil 505-231-0868.
Post Date: 2018-06-18 09:04:20.0
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: New Mexico 524 northbound and southbound from mile marker 0 to mile marker 3
Description: Roadwork Pavement Rehabilitation will begin on Monday, June 25, 2018 on NM 524 between mm 0 and mm 3 (Happy Valley Road) in Carlsbad. Motorists can expect a one lane closure for paving operations where traffic will be reduced to one lane with traffic control flaggers and/or pilot car operations. This work is expected to be complete by July 3, 2018 weather permitting. Contractor: Constructors Inc. NMDOT Contact: James Skonhovd 575-626-9891.
Post Date: 2018-06-18 08:57:23.0
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: New Mexico 31 eastbound and westbound from mile marker 0 to mile marker 2
Description: NMDOT crews will begin mobile sweeping on both East and Westbound lanes of NM 31 from mm 0 to mm 1.5 (Potash Mines Rd). Motorists should expect intermittent lane closures with pilot car operations message boards and temporary signage throughout the work zone. Please use caution, reduce speed and watch for all personnel and equipment in the area. NMDOT contacts are Richard Marquez (575) 840-9796 and Robert Canelo (575) 626-2095.
Post Date: Mon Jun 18 08:34:38 MDT 2018
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: New Mexico 273 at mile marker 1
Description: The Texas Department of Transportation has closed McNutt Road at the Rio Grande in Anapra/Sunland Park until further notice due to the Loop 375 construction project. Please follow detour signs to Racetrack Drive then onto Doniphan Drive.
Post Date: 2015-11-16 08:13:18.0
Update Date: 2018-06-22 08:40:57.895
Expiration Date: unknown
Title: New Mexico 152 from mile marker 5 Turnerville to mile marker 6
Description: James Hamilton Construction Co. (Contractor) will have a detour in place for road work on NM 152 for the construction of the Bebo Arch Structure. Speed limit will be reduced to 20 MPH. 10 foot width restriction in place. Motorists are asked to reduce speed, obey posted signs, use extreme caution, and be cautious of personnel in the area. Hours of operation will be from 6:30 am till 5:30 pm, Monday through Friday. Construction is scheduled to be complete by summer 2018.
Post Date: 2017-11-13 12:59:52.0
Update Date: 2018-06-22 08:40:47.32
Expiration Date: unknown
Title: Interstate 25 from mile marker 154 to mile marker 157
Description: Mountain States Constructors, Inc. (Contractor) is continuing with bridge replacement and roadway reconstruction on Interstate 25 in Socorro Co. Traffic is being diverted from northbound driving lanes to southbound driving lanes to begin the next phase of the project. A 12 width restriction will be in effect throughout the project. Hours of operation will be from 6:30 am to 6:00 pm, Monday through Friday. Construction is expected to be completed by fall 2018.
Post Date: 2017-11-06 09:57:39.0
Update Date: 2018-06-22 08:40:47.32
Expiration Date: unknown
Title: US 70 at mile marker 184
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: 2016-06-06 10:05:20.0
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: Interstate 25 at mile marker 4
Description: The New Mexico Department of Transportation will have maintainers on the shoulder of I-25 and N Telshore Blvd. (Spruce St) installing riprap and gravel. Hours of operation will be Monday through Thursday from 7:00 pm till 5:30 pm.
Post Date: 2018-06-04 10:50:19.0
Update Date: 2018-06-21 08:45:36.0
Expiration Date: unknown
Title: New Mexico 498 at mile marker 0
Description: Hasse Contracting Co., Inc. (Contractor) will continue with bridge replacement and roadway reconstruction. NM 498 will be closed from Doniphan Drive to Futurity Drive; detour is in place on Sunland Park Drive. The Contractors hours of operation will be from 7:00 am to 5:00 pm Monday to Friday. Construction is scheduled to be completed by winter 2018.
Post Date: 2017-10-20 13:04:26.0
Update Date: 2018-06-15 13:41:16.0
Expiration Date: unknown
Title: US 380 at mile marker 107 Hondo.
Description: Trucks over 65 foot are prohibited on US 380 between Hondo and Carrizozo. This is a PERMANENT ALERT.
Post Date: 2017-02-17 08:17:49.0
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: NM 434 from mile marker 17 to mile marker 19. Center lane closed.
Description: (Sierra Bonita Area) Roadwork -- 10' width restriction. One lane closure with flaggers directing traffic at various locations. Speed reduced to 15 mph. Please seek alternate route for loads wider than 10'. Event will be updated as condition changes.
Post Date: 2018-03-16 08:43:03.0
Update Date: 2018-06-22 08:29:58.374
Expiration Date: unknown
Title: New Mexico 536 from mile marker 2 to mile marker 13 Sandia Crest
Description: NM 536 @ Mile Marker 1.3 to 13.3 Sandia Crest will remain Closed until December 2018 or until Restriction is Lifted, due to the Cibola National Forest Closure Stage 3. No access allowed.
Post Date: Fri Jun 15 13:55:37 MDT 2018
Update Date: 2018-06-22 15:29:29.0
Expiration Date: Sun Dec 02 01:00:00 MST 2018
Title: US 64 westbound from mile marker 377 Capulin to mile marker 380.
Description: Roadwork -- Capulin -- passing lane is close for roadwork. Drivers should proceed through the work zone with caution, slow down and watch for construction personnel and equipment.
Post Date: 2018-06-15 13:08:38.0
Update Date: 2018-06-15 13:08:38.0
Expiration Date: unknown
Title: New Mexico 124 eastbound and westbound from mile marker 0 to mile marker 8
Description: NM 124 HAS A PERMANENT HEIGHT RESTRICTION INPLACE. All CMV's and high profile vehicles are PROHIBITED on NM 124, from mile marker 0-8 (from Skyway at Exit 89 to McCartys at Exit 96) due to a low 13" clearance of a concrete box culvert and no turn-around space. This event will be updated as conditions change.
Post Date: 2018-06-15 07:58:27.0
Update Date: 2018-06-22 07:41:05.324
Expiration Date: unknown
Title: New Mexico 546 at mile marker 0
Description: The New Mexico Department of Transportation (NMDOT) will be performing "Chip Sealing" with Brooming and Fog Sealing operations in Sierra & Dona Ana Co. Speed limit will be reduced, no center stripe and loose gravel on roadway. Traffic will encounter lane drops with pilot car and flagging operations.
Post Date: 2018-06-15 06:57:54.0
Update Date: 2018-06-15 06:57:54.0
Expiration Date: unknown
Title: NM 104 from mile marker 0 to mile marker 1.
Description: Roadwork -- Las Vegas -- A one-lane closure setup. Drivers are asked to obey all speed limit reductions and construction road signs. Please note schedule may change due to inclement weather or other unexpected conditions.
Post Date: 2018-06-08 10:35:41.0
Update Date: 2018-06-22 08:29:58.374
Expiration Date: unknown
Title: US 380 at mile marker 66 Carrizozo.
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.
Post Date: 2017-01-06 12:52:40.0
Update Date: 2018-06-22 08:53:59.185
Expiration Date: unknown
Title: I 25 from mile marker 450 (RATON SOUTH) to mile marker 454.
Description: Roadwork (Raton Port of Entry) driving lane is closed. Speed reduced to 45 mph. Drivers should proceed through the work zone with caution, slow down and watch for construction personnel and equipment. Event will be updated as condition changes.
Post Date: 2018-04-06 10:35:59.0
Update Date: 2018-06-22 08:29:58.374
Expiration Date: unknown
Title: New Mexico 120 from mile marker 4 to mile marker 12
Description: (Black Lake to Ocate) Unpaved road -- may be impassable during inclement weather proceeed at your own risk.
Post Date: 2018-01-05 21:28:02.0
Update Date: 2018-05-04 07:48:00.0
Expiration Date: unknown
Title: US 82 from mile marker 107 Artesia to mile marker 139
Description: Roadway Reconstruction is underway East of Artesia on US 82 between MP 107.65 to MP 139.07. Motorists can expect a one lane closure between MP 114 and MP 120 for work on drainage structures and utilities; from MP 123-MP 132 earthwork operations and Utility work on the shoulder work between MP 117 and MP 130 One lane traffic controlled by pilot car during the day, traffic light at night. Motorists should expect delays. Signal was placed Mile Post 35.5 to 36 for structure work. Please proceed with caution and watch for Equipment and Personnel and obey all posted signs. The Speed Limit through work zones will be REDUCED to 35 MPH. The Maximum Posted Speed Limit during construction will be 55 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVERSIZED vehicles should seek alternative routes. This Project is 410 working days. Expected completion date is August 2018. Contractor: Fisher Sand and Gravel Superintendent, Felipe Tenorio (505)249-5138, Traffic Control Supervisor, Terry Werito (505)249-1978. NMDOT Contact, Project Manager Randy Lueras (575)626-8938.
Post Date: Fri Jun 02 13:18:15 MDT 2017
Update Date: 2018-06-22 10:57:21.0
Expiration Date: unknown
Title: New Mexico 390 from mile marker 0 Salem to mile marker 2
Description: The New Mexico Department of Transportation (NMDOT) will be performing "Chip Sealing" with Brooming and Fog Sealing operations in Sierra Co. Speed limit will be reduced, no center stripe and loose gravel on roadway. Traffic will encounter lane drops with pilot car and flagging operations.
Post Date: 2018-06-01 14:08:23.0
Update Date: 2018-06-22 08:40:47.32
Expiration Date: unknown
Title: US 70 eastbound at mile marker 149
Description: AUI, Inc. (Contractor) is currently completing roadway reconstruction on US 70 / Solano Dr. Traffic on US 70/N Main Street will have a lane closure on the eastbound lane, Solano will have a lane closure on the southbound lane. Construction will be from 7:00 am to 4:00 pm, 5 days a week, and is scheduled to be completed by summer 2018.
Post Date: 2018-06-01 14:00:44.0
Update Date: 2018-06-07 12:55:35.0
Expiration Date: unknown
Title: US 64 from mile marker 22 to mile marker 24
Description: US 64 - Shiprock - Pavement preservation work on US 64 from the Chapter House to the State Management Building) in Shiprock. Monday, June 4 - U.S. 64 eastbound and westbound lanes will be reduced to one lane. Motorists can expect delays Monday through Friday from 7:00 a.m. to 6:00 p.m. This project is scheduled to be completed end of June 2018.. Drivers are urged to watch for workers in the area, observe traffic control signs and reduce speed to the posted speed limit.
Post Date: 2018-06-01 11:09:11.0
Update Date: 2018-06-12 16:24:46.0
Expiration Date: unknown
Title: NM 39 from mile marker 29 to mile marker 30.
Description: Roadwork -- north of Logan -- detour is in place. Please reduce speed and use caution in area. Event will be updated as conditions change.
Post Date: 2018-06-01 09:41:03.0
Update Date: 2018-06-15 13:14:36.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Traffic Nearby

More Local Information

Bookmark and Share

Las Vegas weather and traffic updates by locals

Write your own Las Vegas, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read the Terms of Service and the Las Vegas, NM report and/or forecast you are posting is in compliance with such terms. Be respectful. An inappropriate Las Vegas, NM report and/or forecast will be removed by a moderator.