Los Lunas Traffic and Road Conditions

Los Lunas Traffic Map

No Traffic Flow? Zoom in Closer

How to use the Los Lunas Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic or no traffic*. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

* In known extreme weather events or accidents, the map provider may still show green lines, even if lanes or the entire road is closed.

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Los Lunas Traffic Alerts

Title: Roadwork, Roadwork
Description: Roadwork~~~Roadway reconstruction will begin on Thursday, February 29, 2024, on US 285 at both intersections of Hobson Road (south of Roswell). The hours of operation are from 7:00 a.m. to 5:30 p.m., Monday through Friday. Estimated completion is approximately 60 days, weather permitting. Drivers can expect the east intersection of US 285 and Hobson Road to be closed with detours set up for access throughout the duration of the project and working hours. Work will be conducted in phases and begin at the east entrance of Hobson Rd. and continue at the west entrance. NMDOT- PM Donna Gililland (575) 626-4857; NMDOT Supervisor Colleen Price (575) 315-6581; Contractor-Constructors Inc.-Superintendent Fernando Hernandez (575) 420-3675; PM Mark Brooks (575) 706-4594; Traffic Control Supervisor James Atkinson (575) 937-4667.
Post Date: 2024-02-28 14:50:17.0
Update Date: 2024-03-14 13:36:55.0
Expiration Date: unknown
Title: Roadwork, NM 2 from mile marker 23, Dexter to mile marker 30, 1 mile north of Chisum.
Description: Roadwork~~~Road Rehabilitation on NM 2 from MP 23.5 (Dexter) to MP 30.6. Work will begin on 3/4/24. In the work zone traffic is reduced to one lane with pilot car operations. Please expect some delays. When traveling through the work zone please obey all posted signage and be aware of personnel as well as equipment. Project expected completion date is Spring of 2024, weather permitting. NMDOT contact- Steve Soliz 575-626-7495; Brasier Asphalt- Gilbert (336) 417-2752.
Post Date: 2024-02-28 13:28:07.0
Update Date: 2024-03-14 13:36:49.0
Expiration Date: unknown
Title: Alert, NM 159 from mile marker 4, 4 miles east of US 180 to mile marker 25, Willow Creek Campground.
Description: NM 159 from milepost 4 to milepost 25 (Willow Creek Campground). STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 46 feet in length are PROHIBITED on this section of NM 159. Trucks longer than 30 feet are highly encouraged to utilize a pilot vehicle. Consider using an alternate route - US 180 to NM 12 to NM 435 (NF-141). THIS IS A PERMANENT ALERT.~~~
Post Date: 2022-11-23 07:06:02.0
Update Date: 2024-03-18 07:49:09.0
Expiration Date: unknown
Title: Roadwork, NM 176 from mile marker 26, 8 miles west of Eunice to mile marker 34, Eunice.
Description: Roadwork~~~Roadwork mill and fill operations have begun on NM 176 from mm 26 (west of Eunice) to mm 34 (Eunice). NM 176 will be reduced to one lane for both eastbound and westbound traffic. Drivers can expect pilot car and flagging operations throughout the duration of the project and working hours. Drivers are encouraged to plan accordingly and expect short delays. Use caution for all workers and equipment in the area. The hours of operation are from 7:00 a.m. to 5:30 p.m., Monday through Sunday. The project has been placed in suspension until weather allows for continued paving. Contractor: Cutler Repaving Inc. Superintendent- Marcus Jacobs (785) 766-2408; NMDOT Project Manager- John Lara (575) 626-9872; NMDOT AMS- Greg Evans (575) 626-3850.
Post Date: 2023-11-15 12:00:52.0
Update Date: 2024-01-18 14:42:20.0
Expiration Date: unknown
Title: Alert, US 82 at mile marker 133, 1 mile east of Loco Hills.
Description: Alert~~~NMDOT crews will begin shoulder work off the eastbound lane of US 82 at mm 133 (east of Loco Hills). Please use caution, reduce speed, and watch for all personnel and equipment in the area. NMDOT contact is Danny Davis (575) 626-7867.
Post Date: 2024-03-13 15:15:06.0
Update Date: 2024-03-18 10:09:20.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 344, 2 miles east of Taiban to mile marker 345, 1 mile west of Tolar. Roadway closed.
Description: Roadwork~~~Bridge deck replacement is taking place on US60/84 from MP 344.479 to MP 344.713. In the workzone the speed limit is reduced to 45MPH expect delays. There is a 10ft width restriction no wide loads or oversized loads aloud must seek alternate route. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. Work is expected to be completed in the Summer of 2024, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-12 06:53:39.0
Update Date: 2024-03-15 11:33:54.0
Expiration Date: unknown
Title: Seasonal Closure, NM 159 from mile marker 12, 3 miles east of Mogollon to mile marker 22, 3 miles west of Willow Creek Campground.
Description: Seasonal Closure~~~The New Mexico Department of Transportation has closed the gates on NM 159 “Bursum Rd” for the upcoming winter months starting today Wednesday, January 3, 2024. The lower gate is located at milepost 12.3, just past Mogollon, and the upper gate located at milepost 22.6, Willow Creek Campground. This closure is in place due to winter weather conditions making the roadway impassable. The traveling public is asked to use US 180 to NM 12 (Reserve) to NM 435 (Reserve Beaverhead Road) for access into Willow Creek, Snow Lake, and the Gila National Forrest. The NMDOT will monitor gates, expected reopening is scheduled for late April to mid-May.
Post Date: 2024-01-03 09:30:20.0
Update Date: 2024-03-18 07:49:16.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 149, Las Cruces to mile marker 150, Las Cruces.
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) is continuing a project to make roadway improvements to US 70 North Main Street between Spitz/N. Solano Drive and the intersection of N. Triviz Drive/Elks Drive. Crews have demolished the old bridge and began widening the eastbound lanes of the roadway. The following traffic impacts remain in place, the Alameda Arroyo trail crossing is CLOSED. The intersection of US 70 North Main Street and Elks Drive/N. Triviz Drive has a temporary traffic signal in place. Crews are working on the east side of U.S. 70 North Main Street, with only one lane of traffic open eastbound and two lanes open westbound. ACCESS is provided to ALL businesses during this work. Regular work hours are Monday-Friday 7 a.m.-5 p.m., although the contractor may work longer hours or on weekends if needed. The speed limit will be 35 miles per hour throughout the construction zone. Motorists are encouraged to be patient, expect delays and look out for construction crews and equipment. Next Public Meeting scheduled for Thursday, March 21 at Jornada Elementary School from 5:30 to 7:30 p.m.
Post Date: 2024-01-30 08:57:27.0
Update Date: 2024-03-18 08:20:15.0
Expiration Date: unknown
Title: Roadwork, US 54 southbound from mile marker 65, 1 miles south of Alamogordo to mile marker 66 Alamogordo.
Description: Roadwork~~~Motorist please be advised the southbound driving lane will closed due to roadwork. Speed will be reduces to 45 MPH. Please reduce speed and proceed with caution. Watch for NMDOT crews and vehicles on roadway.
Post Date: 2024-02-27 07:25:59.0
Update Date: 2024-02-27 07:25:59.0
Expiration Date: unknown
Title: Alert, US 64 from mile marker 273, 13 miles west of Eagle Nest to mile marker 276, 10 miles west of Eagle Nest.
Description: Alert~~~U.S. 64, between mileposts 273 and 276, motorists are advised to use caution and be alert for commercial traffic performing wide turns due to narrow curves.
Post Date: 2024-01-23 07:09:35.0
Update Date: 2024-01-30 11:59:00.0
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 151, 19 miles south of Corona to mile marker 163, 7 miles south of Corona.
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2023-08-01 12:29:28.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~There will be intermittent lane closures and traffic switches during this time as construction progresses. This project is scheduled for completion in the fall of 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2024-03-04 14:19:27.0
Expiration Date: unknown
Title: Alert, I 10 at mile marker 61, 20 miles west of Deming.
Description: Alert~~~The Gage Rest Area is closed until further notice.
Post Date: 2024-01-09 12:15:48.0
Update Date: 2024-03-06 12:49:51.0
Expiration Date: unknown
Title: Alert, US 82 at mile marker 16 Cloudcroft.
Description: Alert~~~US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles. STEEP GRADES, NUMEROUS TIGHT TURNS, AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route. US 62/180 or US 70. THIS IS A PERMANENT ALERT.
Post Date: 2023-12-05 13:16:41.0
Update Date: 2024-03-18 10:09:30.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 17, 1 mile north of Malaga. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Title: Construction Closure, NM 109 northbound and southbound at mile marker 5, 1 mile north of Jarales.
Description: NM 109 milepost 5.3-6.1 (3/20) The New Mexico Department of Transportation will have a continues road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: NetoRey Terrazas
Post Date: 2023-07-27 12:01:32.0
Update Date: 2024-03-07 07:33:22.0
Expiration Date: 2024-03-20 23:59:00.0
Title: Roadwork, NM 41 from mile marker 56, Galisteo to mile marker 62, Lamy.
Description: Roadwork~~~NM 41 Phase III Improvements – Milepost 56.6 to US 84/285 ***A new traffic pattern has been put in place for the duration of the project. One lane will be open in each direction and the speed limit will be reduced to 35 mph in the construction zone for the duration of the project. ***
Post Date: 2022-07-21 14:43:17.0
Update Date: 2022-11-08 07:58:18.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 124, 1 mile north of Carrizozo.
Description: Roadwork~~~FULL SUSPENSION-Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Temporary Traffic Signals have been installed at the intersection of US 54 & US 380, all directions are down to one lane through the intersection, Motorist should obey Traffic Signals at all times. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667
Post Date: 2022-09-15 14:35:30.0
Update Date: 2023-08-01 12:25:03.0
Expiration Date: unknown
Title: Lane Closure, I 40 westbound at mile marker 26, Gallup East Interchange.
Description: Lane Closure~~~Eastbound right lane closed on I-40, mile marker 26 (Gallup) due to road maintenance. Please drive with caution, reduce speed, and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-03-14 12:03:58.0
Update Date: 2024-03-14 12:03:58.0
Expiration Date: unknown
Title: Difficult Driving, NM 117 from mile marker 0, at NM 36 to mile marker 12, 12 miles north of NM 36.
Description: Difficult Driving Conditions - Roads are snow packed and icy in spots.~~~Difficult driving conditions on NM 117, mile marker 0-12 (from NM 36 to 12 miles north of NM 36). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-14 08:54:11.0
Update Date: 2024-03-14 08:54:11.0
Expiration Date: unknown
Title: Fair Driving, NM 36 from mile marker 47, 7 miles north of Fence Lake to mile marker 72, at NM 53.
Description: Fair Driving Conditions - Roads are wet, snow packed and icy in spots. Flurries may be reducing visibility.~~~Fair driving conditions on NM 36, mile marker 47-72 (7 miles north of Fence lake to 7 miles to NM 53). Road is wet/snow packed and icy in spots. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-14 08:48:43.0
Update Date: 2024-03-14 08:48:43.0
Expiration Date: unknown
Title: Difficult Driving, NM 36 from mile marker 39, 1 mile south of Fence Lake to mile marker 47, 7 miles north of Fence Lake.
Description: Difficult Driving Conditions - Roads are snow packed and icy.~~~Difficult driving conditions on NM 36, mile marker 39-47 (1 mile south of Fence lake to 7 miles north of Fence Lake). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-14 08:44:47.0
Update Date: 2024-03-14 08:44:47.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2023-08-01 12:08:40.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 0, Texas State Line to mile marker 8, 8 miles south of Malaga.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2020-08-13 14:51:47.0
Update Date: 2023-08-01 11:59:19.0
Expiration Date: unknown
Title: Alert, NM 104 eastbound and westbound from mile marker 70, 1 mile east of Mesa Rica to mile marker 90, 15 miles east of Conchas. Roadway closed.
Description: Alert~~~Bridge NO. 5995 at mile marker 71.5, Bridge No. 5254 at mile marker 81.8 and Bridge No. 5257 at mile marker 87.2 all have weight restrictions of 25 tons. Please seek alternate route.
Post Date: 2024-01-11 10:09:46.0
Update Date: 2024-01-11 10:09:46.0
Expiration Date: unknown
Title: Fair Driving, NM 134 from mile marker 9 , 9 miles south of Sheep Springs to mile marker 17 , 1 mile north of Crystal.
Description: Fair Driving Conditions~~~Fair driving conditions on NM 134, mile marker 9-17 (from south of Sheep Springs to Crystal). Road is wet and may freeze with overnight temperatures. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-03-07 13:17:38.0
Update Date: 2024-03-14 13:50:06.0
Expiration Date: unknown
Title: Construction Closure, NM 314 northbound and southbound at mile marker 9 Los Lentes.
Description: NM 314 MP 9-10 (thru 3/11) There will be a continuous one-way two-way flagging operation. Work is being performed for utility work. Motorists should anticipate delays. Contractor: Sanchez Demo
Post Date: 2024-03-07 07:39:03.0
Update Date: 2024-03-07 07:39:03.0
Expiration Date: 2024-09-11 23:59:00.0
Title: Alert, US 380 at mile marker 43, 13 miles east of Bingham.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 or 575-678-2222 for daily information on possible closure dates and times for firings. THIS IS A PERMANENT ALERT.
Post Date: 2021-07-01 08:53:50.0
Update Date: 2024-03-18 10:09:11.0
Expiration Date: unknown
Title: Fair Driving, NM 169 from mile marker 0, Magdalena to mile marker 35, 6 miles north of Alamo.
Description: Fair Driving Conditions - Roads are icy in spots.~~~ ROAD ADVISORY Fair Driving Conditions in Magdalena The Magdalena Patrol has reported roadways as wet and may be icy in some spots. Please drive with caution, reduce speed, and obey all posted traffic signs. The NMDOT will continue to monitor and plowing as needed. This event will be updated as conditions change.
Post Date: 2024-03-17 20:01:12.0
Update Date: 2024-03-17 23:01:29.0
Expiration Date: unknown
Title: Fair Driving, US 60 from mile marker 136, 2 miles west of Escondida to mile marker 93, 4 miles west of Alamo.
Description: Fair Driving Conditions - Roads are icy in spots.~~~ROAD ADVISORY Fair Driving Conditions in Magdalena The Magdalena Patrol has reported roadways as wet and may be icy in some spots. Please drive with caution, reduce speed, and obey all posted traffic signs. The NMDOT will continue to monitor and plowing as needed. This event will be updated as conditions change.
Post Date: 2024-03-17 19:59:36.0
Update Date: 2024-03-17 23:00:32.0
Expiration Date: unknown
Title: Difficult Driving, NM 117 northbound and southbound from mile marker 0, at NM 36 to mile marker 37, 2 miles south of La Ventana Natural Arch.
Description: Difficult Driving Conditions~~~Difficult driving conditions on NM 117, mile marker 0-39 (from Jct. NM 117/ NM 36 to La Ventana Arch). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-16 10:29:07.0
Update Date: 2024-03-16 10:29:07.0
Expiration Date: unknown
Title: Difficult Driving, NM 36 northbound and southbound from mile marker 19, 1 mile south of Techado to mile marker 61, 11 miles south of NM 53.
Description: Difficult Driving Conditions~~~Difficult driving conditions on NM 36, mile marker 19-60 (from the Cibola/Catron County Line to the Cibola/McKinley County Line). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-16 10:27:35.0
Update Date: 2024-03-16 10:27:35.0
Expiration Date: unknown
Title: Fair Driving, NM 279 from mile marker 0, at NM 124 to mile marker 13, 13 miles north of NM 124.
Description: Fair Driving Conditions~~~Fair driving conditions on NM 279, mile marker 0-13 (from NM 124 at Laguna to Seboyeta). Road is slushy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-16 04:15:17.0
Update Date: 2024-03-16 08:51:16.0
Expiration Date: unknown
Title: Fair Driving, NM 124 from mile marker 16, 1 mile east of Budville to mile marker 25, Laguna.
Description: Fair Driving Conditions~~~Fair driving conditions on NM 124, mile marker 16-25 (from Budville to Exit 114 at Laguna). Road is slushy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-16 04:13:25.0
Update Date: 2024-03-16 08:53:16.0
Expiration Date: unknown
Title: Fair Driving, NM 6 from mile marker 0 to mile marker 11, 6 miles east of Highland Meadows.
Description: Fair Driving Conditions~~~Fair driving conditions on NM 6, mile marker 0-12 (from Exit 126 at I-40 to the Cibola/Valencia County Line). Road is slushy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-16 04:11:46.0
Update Date: 2024-03-16 08:55:54.0
Expiration Date: unknown
Title: Fair Driving, I 40 from mile marker 104, Cubero/Budville/Seama Interchange to mile marker 131, (TO'HAJIILEE).
Description: Fair Driving Conditions~~~Fair driving conditions on I-40, mile marker 104-131 (from Cubero to To’hajiilee). Road is slushy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-16 04:09:03.0
Update Date: 2024-03-16 08:54:21.0
Expiration Date: unknown
Title: Alert, NM 120 from mile marker 0, Black Lake to mile marker 9, 8 miles west of Ocate.
Description: Alert - Roads are icy in spots. Visibility is good with clear skies.~~~Roadway has limited width clearance. Tree cover will produce prolonged icy and snow packed road conditions, four-wheel drive vehicles are recommended.
Post Date: 2024-01-29 13:08:00.0
Update Date: 2024-01-29 14:41:20.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 150, (SOCORRO NORTH) to mile marker 161, Chamizal.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) has completed the roadway rehabilitation project on Interstate 25 from milepost 150 (Socorro North) to milepost 161 (Chamizal). No traffic impacts at this time. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2023-08-28 08:52:29.0
Update Date: 2024-03-15 13:36:27.0
Expiration Date: unknown
Title: Alert, US 70 at mile marker 184, 22 miles west of Holloman AFB.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: 2022-06-27 10:28:09.0
Update Date: 2024-03-18 10:09:26.0
Expiration Date: unknown
Title: Closure, NM 539 northbound and southbound at mile marker 5 Navajo Dam.
Description: Closure~~~The New Mexico Department of Transportation, in conjunction with the Federal Bureau of Reclamation wish to alert the travelling public to an upcoming roadway closure near the Navajo Dam. The closure is scheduled to begin on February 26, 2024, and is estimated to be completed by May 17, 2024. Red Orange LLC has been retained by the Bureau of Reclamation to drill a series of monitoring wells near the dam. Due to the large size of the machinery involved motorists would be unable to pass safely in the work zone. An approximately ½ mile section of N.M. 539 will be closed for the duration of the project, motorists will detour onto N.M. 511. Active message boards will be in place to guide motorists around the road closure.
Post Date: 2024-02-26 06:54:25.0
Update Date: 2024-02-26 06:54:25.0
Expiration Date: 2024-05-17 17:01:00.0
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad. Center lane closed.
Description: Roadwork~~~FULL SUSPENSION-Road construction is underway between MM 38.5 and 42.0 on US 285. The Speed Limit is reduced to 45 MPH. Motorists should obey all construction signing and watch for construction personnel and equipment. Brian Torres, NMDOT Project Manager (575) 626-4278; Rick Castillo, NMDOT Construction Traffic Control Supervisor (512) 630-3554; Erin Millwood, Bixby Electric, Project Manager (505) 263.3421; Trae Baldwin, Bixby Electric Traffic Control Supervisor (505) 379-8058.
Post Date: 2022-08-22 15:46:56.0
Update Date: 2023-08-01 12:19:16.0
Expiration Date: unknown
Title: Seasonal Closure, NM 72 eastbound and westbound from mile marker 0, Raton to mile marker 36, Folsom. Roadway closed.
Description: Seasonal Closure - Roads are snow packed and icy.~~~Seasonal Road Closure. Roadway will become impassable due to ice, snow, and snow drifts. No roadway maintenance throughout seasonal closure.
Post Date: 2023-11-20 14:43:06.0
Update Date: 2023-12-07 11:07:57.0
Expiration Date: unknown
Title: Crash, I 25 northbound at mile marker 225, (LOMAS / MLK). Right lane closed.
Description: Crash~~~Crash I-25 northbound at Lomas has the right lane closed at this time. proceed with caution and expect delays.
Post Date: 2024-03-18 17:08:14.0
Update Date: 2024-03-18 17:08:14.0
Expiration Date: unknown
Title: Alert, I 40 eastbound and westbound at mile marker 132, To’hajiilee Interchange.
Description: ALERT---I-40 will be reduced to 1 lane eastbound and westbound. Work is being performed for interstate Maintenace. Contractor: Braiser NMDOT Project Manager: Barry Lytle
Post Date: 2024-03-18 14:45:36.0
Update Date: 2024-03-18 14:45:36.0
Expiration Date: 2024-04-09 17:00:00.0
Title: Fair Driving, NM 130 from mile marker 0, Cloudcroft to mile marker 21, 1 mile west of Mayhill.
Description: Fair Driving Conditions - Roads are wet with some icy spots. Black ice may exist when temperatures drop.~~~NMDOT crews have salted, plowed, and will continue to monitor the roads. Please use caution, reduce speed, and watch for all personnel and equipment in the area.
Post Date: 2024-03-18 12:20:17.0
Update Date: 2024-03-18 16:13:48.0
Expiration Date: unknown
Title: Fair Driving, US 82 from mile marker 17, 1 mile east of Cloudcroft to mile marker 35 Mayhill.
Description: Fair Driving Conditions - Roads are wet with some icy spots. Black ice may exist when temperatures drop.~~~NMDOT crews have salted, plowed, and will continue to monitor the roads. Please use caution, reduce speed, and watch for all personnel and equipment in the area.
Post Date: 2024-03-18 12:19:21.0
Update Date: 2024-03-18 16:14:36.0
Expiration Date: unknown
Title: Closure, US 54 from mile marker 82, 3 miles north of Tularosa to mile marker 83, 4 miles north of Tularosa.
Description: Closure~~~Motorists please be advised US 54 from mm 82 (north of Tularosa) to mm 83 will be closed in all directions while removal of semi and contents take place from previous semi rollover. Please seek an alternate route at this time. Please use caution, reduce speed, and watch for all emergency personnel and equipment in the area.
Post Date: 2024-03-18 11:32:34.0
Update Date: 2024-03-18 15:58:48.0
Expiration Date: unknown
Title: Alert, US 84 northbound and southbound from mile marker 165, Santa Fe to mile marker 181, Pueblo of Pojoaque.
Description: Alert~~~The New Mexico Department of Transportation will be conducting overnight sweeping operations on U.S. 84/285 beginning the evening of Monday, March 18th, 2024 at 7 p.m., and lasting until Friday, March 22nd, 2024 at 4 a.m. Work will be done between 7 p.m. and 4 a.m. There will be a moving lane closure each evening while crews are working. The New Mexico Department of Transportation is committed to the safety of the traveling public and appreciates your cooperation during this work. For the latest road information visit: The New Mexico Department of Transportation at www.nmroads.com or call 511.
Post Date: 2024-03-18 11:30:07.0
Update Date: 2024-03-18 11:30:07.0
Expiration Date: 2024-03-22 04:01:00.0
Title: Alert, US 380 from mile marker 43, 13 miles east of Bingham to mile marker 49, 16 miles west of Carrizozo.
Description: Alert~~~White Sands Missile Range is scheduling a roadblock on Tuesday, March 19, 2024. US 380 is scheduled to be blocked at 6:10 a.m. and should be lifted by 8:10 a.m. Block will be located at Gold Block (mm-3) and Silver Block (mm-49). All roadblocks are subject to change without notice, please call 575-678-1178 for updates or go to Facebook: www.facebook.com/WSMRPublicAffairs, Twitter: https://twitter.com/wsmrpao. This Alert will expire March 19th, 2024, at 8:10 A.M.
Post Date: 2024-03-18 10:08:17.0
Update Date: 2024-03-18 10:08:17.0
Expiration Date: 2024-03-19 08:10:00.0
Title: Fair Driving, NM 337 from mile marker 9 to mile marker 29 Tijeras.
Description: Fair Driving Conditions - Roads are wet with some icy spots. Black ice may exist when temperatures drop.~~~Please reduce speed and use caution.
Post Date: 2024-03-18 06:42:53.0
Update Date: 2024-03-18 06:42:53.0
Expiration Date: unknown
Title: Fair Driving, NM 217 from mile marker 0 Yrisarri to mile marker 10.
Description: Fair Driving Conditions - Roads are wet with some icy spots. Black ice may exist when temperatures drop.~~~Please reduce speed and use caution.
Post Date: 2024-03-18 06:41:36.0
Update Date: 2024-03-18 06:41:36.0
Expiration Date: unknown
Title: Construction Closure, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Construction Closure~~~Construction continues on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. . Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. *** One lane will be closed for the duration of the project, and flaggers and a pilot car will be on hand to guide motorists through the construction zone 24 hours a day, 7 days a week until the end of the project. *** Please obey all traffic control personnel and proceed with caution through the roadwork zone. *** PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!***
Post Date: 2022-04-18 07:33:36.0
Update Date: 2023-06-29 11:39:06.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 387, 1 mile west of Clovis to mile marker 389, eastside of Clovis. Roadway closed.
Description: Roadwork~~~Road Reconstruction project on US60/84 from MP 387.800 to MP 389.120. Eastbound lanes of US 60 will be closed and reconstructed between the intersections of Main and Ash St. Prince Street will also be completely closed between the intersection of US 60 and E. McDonald. Traffic will be reduced to one lane in each direction on the existing Westbound Lanes. Traffic will follow posted detour signage and there is a 12ft width restriction, oversized or wide loads must use the designated truck bypass off of Hall St. Please follow all posted signage be aware of personnel and equipment in the workzone. Project expected completion date is Summer of 2025 depending on weather and delays. Contractor - AUI, Inc.- Carl Johnson 505-401-5251 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-17 15:32:10.0
Update Date: 2024-03-15 11:34:10.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 75, Williamsburg (T OR C SOUTH).
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) will be continuing construction to replace the bridge at I-25 milepost 75, Broadway Street and NM 187 in Williamsburg. Traffic has been shifted into the northbound lanes with the on/off ramps open, access to the southbound on/off ramps are still closed. Currently crews are working on installation of southbound on/off ramps, bridge installation and drainage structures. Regular work hours will be 7 a.m.-5:30 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed. Access will be maintained to all businesses and residences during construction.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2024-03-04 06:56:02.0
Expiration Date: unknown
Title: Roadwork, US 84 northbound and southbound at mile marker 208, Tierra Azul.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) and Hasse Contracting Company Inc. will begin a bridge repair project at mile marker 208 on U.S. 84 in Abiquiu. This project will consist of structural repairs and modifications, concrete drainage installation, concrete wall barrier installation, and new guardrail installations. *** Starting August 14th, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. Working hours will be from 7a.m. to 5p.m., Monday through Friday. All lanes will be reopened by the end of the workday and all traffic control devices will be removed from the roadway. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. ***
Post Date: 2023-08-14 10:03:01.0
Update Date: 2023-08-14 10:03:01.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2022-11-08 07:57:24.0
Expiration Date: unknown
Title: Construction Closure, I 25 from mile marker 264, (COCHITI/NM 16) to mile marker 267, WALDO.
Description: Construction Closure~~~The first phase of the La Bajada Slope Mitigation project begins on July 11, 2022. This will entail the closure of the northbound right line and the construction of crossover lanes between the northbound and southbound roadways. 2 lanes will be open during peak hours for the duration of the project. At all other times, lane closures are possible, and motorists should plan their trips accordingly.
Post Date: 2022-07-11 12:14:48.0
Update Date: 2022-11-08 07:58:43.0
Expiration Date: unknown
Title: Alert, Alert
Description: Alert~~~North Atkinson from College Blvd. to Cherry St. will be closed from January 8th to July 4th due to reconstruction of roadway. Motorists are to follow detour signs for alternate route. If you have any questions concerning the reconstruction of North Atkinson, please contact Thomas McAlister at 575-416-1841.
Post Date: 2024-01-08 06:56:27.0
Update Date: 2024-03-18 10:09:49.0
Expiration Date: 2024-07-04 08:00:00.0
Title: Roadwork, NM 26 at mile marker 26, 2 miles west of Nutt.
Description: Roadwork~~~Meridian Contracting, Inc. (Contractor) is currently finalizing the bridge rehabilitation project on NM 26 “Hatch Hwy” at milepost 26.8 near Nutt. Speed limits may be reduced, please obey traffic control devices. Roadway will be restricted to 11-foot for oversized loads. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2023-06-05 09:18:53.0
Update Date: 2024-02-26 07:04:05.0
Expiration Date: unknown
Title: Alert, US 64 from mile marker 6, 6 miles east of Arizona State Line to mile marker 9, 9 miles east of Arizona State Line.
Description: Alert~~~Beginning Monday March 11th, one lane will be closed from 6a.m. until 6p.m. each day, Monday through Friday. The remaining lane will have a width restrict in place of 9' during working hours. Work is expected to be completed by November 20th, 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-03-04 14:17:10.0
Update Date: 2024-03-16 01:20:37.0
Expiration Date: unknown
Title: Roadwork, US 380 at mile marker 65, Carrizozo.
Description: Roadwork~~~Project is in Full Suspension-Dynamic Message signs are being installed throughout Lincoln and Otero Counties. US 380, MP 65 to MP 66, US 70 at MP 259 in Lincoln County and US 70 at MP 231 in Otero County. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Aaron Clark, NMDOT Project Manager (575)840-3566; Contractor; Erin Millwood, Bixby Electric, Construction Project Manager (505)263-3421 ; Russell Critchell, Bixby Electric, Construction Traffic Control Supervisor (505)238-3595
Post Date: 2023-05-01 09:30:41.0
Update Date: 2023-08-01 12:27:39.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad.
Description: Roadwork~~~Roadwork for intersection lighting will begin on August 2nd, 2022 on US 285 from mm 38.5 to mm 42 (North of Carlsbad). There will be lane restrictions (780’ taper with drums) during the day from 6:00 AM to 6:00 PM with traffic control being taken off the road at the end of the work day. This is a 60 day project with estimated completion being September 2022. Contractor: Bixby Electric; Project Manager: Erin Millwood (505)263-3421 Superintendent: Russell Critchell (505)238-3595; TCS Trae Baldwin (505) 379-8058. NMDOT PM Brian Torres (575) 626-4278.
Post Date: 2022-07-29 12:13:40.0
Update Date: 2022-09-01 15:22:31.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Roadwork, US 84 from mile marker 6, 6 miles north of Fort Sumner to mile marker 12, 12 miles north of Fort Sumner.
Description: Roadwork~~~Road Rehabilitation on US84 from MP 6.740 to MP 12.736. Work began in June 2023. In the workzone traffic is reduced to one lane with a pilot car so expect delays. When traveling through the work zone please obey all posted signage and be aware of personnel as well as equipment. Project expected completion date is Spring of 2024. NMDOT PM- Debbie Ysasi 575-291-5208 K Barnett Superintendent- Art Metcalf (336)417-2752.
Post Date: 2023-05-26 15:47:28.0
Update Date: 2024-03-15 11:33:45.0
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound from mile marker 6, 6 miles north of I-40 to mile marker 7, 7 miles north of I-40.
Description: Roadwork~~~Roadwork on NM 566, mile marker 6-7 (north of Church Rock) due to a bridge replacement project. All traffic has been shifted onto the detour pavement. Speed reduced to 35mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-12-22 09:19:16.0
Update Date: 2023-12-22 09:19:16.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 123, Carrizozo. , right shoulder, and left shoulder
Description: Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667~~~
Post Date: 2022-02-18 11:01:42.0
Update Date: 2022-07-22 09:47:34.0
Expiration Date: unknown
Title: Alert, NM 14 from mile marker 28, 1 mile south of Madrid to mile marker 29, Madrid.
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2024-02-10 19:05:15.0
Expiration Date: unknown
Title: Lane Closure, I 25 from mile marker 159, McNierney to mile marker 175, Bernardo (US 60/MOUNTAINAIR).
Description: Lane Closure~~~J-H Supply, Co. (Contractor) will be continuing a guardrail and end treatment project along I-25 in Socorro County from milepost 159 to 175. Motorists can expect lane closures in the northbound lane from 170-174 and the southbound lane from milepost 175-171. Overnight lane closures should be expected. The hours of operation are from 7 a.m. to 5 p.m., Monday through Friday. Construction is expected to be completed by Spring 2024.
Post Date: 2023-02-17 14:06:00.0
Update Date: 2024-03-13 09:58:31.0
Expiration Date: unknown
Title: Construction Closure,
Description: NM 45 SB MP 13.2 at Bluewater (2/19 thru 4/24) There will be right lane and shoulder restrictions. Work is being performed for commercial development. Motorists should anticipate delays. Contractor: HB Construction
Post Date: 2024-02-16 07:02:16.0
Update Date: 2024-03-07 07:33:59.0
Expiration Date: 2024-04-24 23:59:00.0
Title: Difficult Driving, NM 601 from mile marker 0, at US 60 to mile marker 27, Catron/ Cibola County line.
Description: Difficult Driving Conditions - Roads are slushy, snow packed and icy in spots. Heavy Snow may cause poor visibility.~~~Difficult driving conditions on NM 601, mile marker 0-27 (dirt road from US 60 to the Cibola/Catron County Line). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-15 22:44:55.0
Update Date: 2024-03-15 22:44:55.0
Expiration Date: unknown
Title: Difficult Driving, NM 103 from mile marker 0, at NM 32 to mile marker 3, 3 miles east of NM 32.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Fog may cause low visibility.~~~Difficult driving conditions on NM 32, mile marker 13-41 (from Jewitt Gap to US 60 at Quemado). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-15 22:44:16.0
Update Date: 2024-03-15 22:44:16.0
Expiration Date: unknown
Title: Difficult Driving, NM 32 from mile marker 13, 13 miles north of Apache Creek to mile marker 41, Quemado.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Heavy Snow may cause poor visibility.~~~Difficult driving conditions on NM 32, mile marker 13-41 (from Jewitt Gap to US 60 at Quemado). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-15 22:43:49.0
Update Date: 2024-03-15 22:43:49.0
Expiration Date: unknown
Title: Difficult Driving, US 60 from mile marker 1, 1 mile east of AZ State Line to mile marker 56 Pie Town.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Heavy Snow may cause poor visibility.~~~Difficult driving conditions on US 60, mile marker 0-56 (from the Arizona/NM state line to Pie Town). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-15 22:43:13.0
Update Date: 2024-03-15 22:43:13.0
Expiration Date: unknown
Title: Difficult Driving, NM 536 from mile marker 1 Sandia Park to mile marker 13 Sandia Crest.
Description: Difficult Driving Conditions - Roads are wet, snow packed and icy in spots.~~~Please use caution in area, reduce speed.
Post Date: 2024-03-15 10:46:46.0
Update Date: 2024-03-18 06:40:37.0
Expiration Date: unknown
Title: Difficult Driving, NM 126 from mile marker 25, 13 miles west of NM 4 to mile marker 38, at NM 4.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Heavy Snow may cause poor visibility.~~~Difficult driving conditions on NM 126, mile marker 25-38 (from the Fish Hatchery to La Cueva Campground). Road is snow packed and icy. Visibility is poor. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-15 08:03:41.0
Update Date: 2024-03-15 08:03:41.0
Expiration Date: unknown
Title: Difficult Driving, NM 4 from mile marker 35, 2 miles east of Sierra De los Pinos to mile marker 46, 13 miles east of Sierra De los Pinos.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Blowing snow may cause limited visibility.~~~Difficult driving conditions on NM 4, mile marker 35-46 (From east Los Alamos County Line). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-03-15 07:47:48.0
Update Date: 2024-03-15 22:47:28.0
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound at mile marker 0, Church Rock (I-40).
Description: Roadwork~~~Bridge Replacement work on NM 566, mile marker 0 - 0.866 (Church Rock). All traffic has been shifted to the detour pavement. Watch for equipment. This event will be updated as conditions change.
Post Date: 2023-10-13 15:46:41.0
Update Date: 2023-10-13 15:46:41.0
Expiration Date: unknown
Title: Roadwork, I 10 at mile marker 164, Anthony.
Description: Roadwork~~~I-10 Widening West Project Monday, March 18, through Thursday, March 21 9pm to 5am • Eastbound I-10 will be closed to all traffic at Vinton Road. DETOUR: Take Exit 2 (Spur 37/Vinton Road/Westway Drive), turn right on Spur 37, turn left on SH 20 (Doniphan Drive), turn left on Talbot Avenue, turn left on Spur 16, turn right on South Desert Boulevard. Crews will be repairing asphalt. Saturday, March 23 at 9 p.m., through Monday, March 25 at 6 a.m., and Saturday, April 6 at 9 p.m. through Monday, April 8 at 6 a.m. • I-10 West will be closed to all traffic between David Road and Vinton Road. • North Desert Boulevard will be reduced to one lane at Los Mochis Drive. DETOUR: Continue on North Desert Boulevard, re-enter I-10 past Vinton Road. Crews will be placing bridge decks. The following closures and detours will continue until further notice: • The westbound main lanes of I-10 are detoured onto North Desert Boulevard at Los Mochis Drive. • North Desert Boulevard is closed to all traffic at Enchanted Hills Drive. • The eastbound main lanes of I-10 are detoured onto South Desert Boulevard at Los Mochis Drive. • South Desert Boulevard is closed to all traffic south of Spur 37 (Vinton Road). • The direct connector ramp from westbound Loop 375 (Transmountain Road) to eastbound I-10 is closed to all traffic. • Eastbound I-10 is reduced to one lane from north of Transmountain Road to Redd Road. • Westbound I-10 is reduced to one lane from Redd Road to north of Transmountain Road. • Alternating nighttime lane closures are possible on eastbound and westbound I-10 between Redd Road and Anthony, Texas. • Alternating daytime lane closures are possible on North Desert Boulevard and South Desert Boulevard between Redd Road and Anthony, Texas. I-10 Mill and Inlay Project Friday, March 15 through Monday, March 18 9 p.m. to 6 a.m. • I-10 eastbound between Mesa and Sunland Park full closure. DETOUR: Exit 13 toward Paisano/Sunland Park. Stay in left lane to take ramp to enter I-10 eastbound. Crews will be working on milling and inlay. All TXDOT Roadway Closures can be found at www.drivetexas.com.
Post Date: 2024-02-09 13:54:18.0
Update Date: 2024-03-18 07:29:07.0
Expiration Date: unknown
Title: Roadwork, NM 404 from mile marker 1 to mile marker 9.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor), will be continuing the roadway reconstruction and lighting project on NM 404 from milepost 0.9 (Anthony) to milepost 8.8 (Chaparral). Traffic has been shifted into the westbound lanes so construction can be completed on the eastbound lanes. Traffic may be stopped with a flagging operation for grinding of the paved surface. A wait time of up to 15 minutes can be expected. The speed limit has been reduced to 45 MPH for the safety of the traveling public. The contractor’s regular hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday, some weekends as needed.
Post Date: 2022-12-09 13:32:21.0
Update Date: 2024-03-18 07:32:35.0
Expiration Date: unknown
Title: Alert, NM 475 from mile marker 1 to mile marker 5.
Description: Alert~~~Beginning Monday, September 11, 2023, PNM will begin a project to upgrade the electrical service to residents on N.M. 475. One lane will be closed in various spots between mile marker 2.5 to 4.5 until the project is completed. *** For more information, please contact the PNM Electric Hotline @ 1-833-910-3670 ***
Post Date: 2023-09-08 12:37:39.0
Update Date: 2024-03-08 08:32:34.0
Expiration Date: unknown
Title: Alert, US 380 at mile marker 66, Carrizozo.
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.~~~
Post Date: 2017-01-06 12:52:40.0
Update Date: 2024-03-18 10:08:53.0
Expiration Date: unknown
Title: Roadwork, NM 359 at mile marker 2.
Description: Roadwork~~~AUI, Inc. (Contractor) will continue the bridge rehabilitation project on NM 359 at milepost 1.90 over the Rio Grande. The majority of the work will take place under and around the bridge, with no traffic impacts expected. Drivers are asked to please obey traffic control devices if placed and be on the lookout for workers and/or equipment entering and exiting the roadway. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-01-05 13:48:00.0
Update Date: 2024-02-27 07:02:12.0
Expiration Date: unknown
Title: Roadwork, NM 157 eastbound and westbound at mile marker 0.
Description: Roadwork~~~AUI, Inc. (Contractor) will begin working on a bridge rehabilitation project on NM 157 at milepost 0.1 over the Leasburg Canal. The majority of the work will take place under and around the bridge, with no traffic impacts expected. Drivers are asked to please obey traffic control devices if placed and be on the lookout for workers and/or equipment entering and exiting the roadway. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-01-05 13:45:04.0
Update Date: 2024-01-05 13:45:04.0
Expiration Date: unknown
Title: Roadwork, US 380 at mile marker 2, San Pedro.
Description: Roadwork~~~AUI, Inc. (Contractor) will begin working on a bridge rehabilitation project on US 380 between mileposts 1.6 and 1.8 over the Rio Grande River. The majority of the work will take place under and around the bridge, with no traffic impacts expected. Drivers are asked to please obey traffic control devices if placed and be on the lookout for workers and/or equipment entering and exiting the roadway. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-01-05 13:44:23.0
Update Date: 2024-01-31 07:09:33.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 3, (LOHMAN) to mile marker 4, 4 Las Cruces.
Description: Roadwork~~~Grass Masters LLC (Contractor) is continuing a landscaping, curb and gutter, miscellaneous construction, and paving project along I-25 from milepost 3 to milepost 3.7 near Lohman Ave in Las Cruces. Crews will be working on the wall foundations and wall footing along the I-25 northbound interchange and on/off ramp. Most construction will be on the shoulders with little impact to travelers. The contractor’s hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday.
Post Date: 2024-01-05 13:42:31.0
Update Date: 2024-02-16 13:30:03.0
Expiration Date: unknown
Title: Roadwork, NM 83 from mile marker 0, Lovington to mile marker 1, 1 mile east of Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US82 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. The intersection of NM 83/82 has been reopened for east, west, and southbound traffic. Northbound traffic is closed from the intersection to Central. Use posted detour signs to navigate through construction. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 499 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on US 82 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drive pads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2101381R2 project: Contractor: Constructors, Inc., Project Manager- Darin Coslin (575) 626-1140, Superintendent- Hector Sicre (915)316-7732. Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938, Project Safety Office- Tami Mandel (505) 697-1787- Project EEO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2024-01-18 14:38:15.0
Expiration Date: unknown
Title: Alert, NM 152 from mile marker 15, San Lorenzo to mile marker 49, 1 mile east of Hillsboro.
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2023-03-03 14:03:42.0
Update Date: 2024-02-27 07:16:38.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 17, 1 mile north of Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2023-08-01 12:00:45.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 35, (RINCON) to mile marker 43, 2 miles north of Hatch.
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin work on erosion control along I-25 between Rincon and Hatch. The contractor will be working on the northbound off ramp and Rincon (exit 35), the I-25 northbound ramp will be closed during working hours, please detour through Hatch. I-25 may be reduced to a single lane depending on the work location, drivers should be vigilant for construction signing. The contractor’s hours of operation are 7:00 am – 5:00 pm Monday through Friday.
Post Date: 2024-02-02 15:08:46.0
Update Date: 2024-03-13 14:48:23.0
Expiration Date: unknown
Title: Severe Driving, NM 126 from mile marker 17, 17 miles east of Cuba to mile marker 25, 13 miles west of NM 4.
Description: Severe Driving Conditions - Roads are snow packed and icy.~~~Severe driving conditions on NM 126, mile marker 17-25 (17 miles east of Cuba to 13 miles west of NM 4). Road is snow packed and icy. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-02-02 11:27:57.0
Update Date: 2024-02-02 11:27:57.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 34, 7 miles south of Hatch to mile marker 41, (NM 26/HATCH).
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) will be completing a roadway rehabilitation project on Interstate 25 (I-25) from milepost 34(Rincon) to milepost 41(NM 26/Hatch). Drivers can expect lane closures on both the northbound and southbound lanes of I-25 as needed. Overnight lanes closures may be in place for the replacement of the guardrail and concrete wall barrier. Please reduce your speed and obey traffic control devices. Roadway will be restricted to 12-foot for oversized loads. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday, with the possibility of some weekend work. This rehabilitation project was awarded in the amount of $5.3 million and is expected to be complete by April 2024, weather pending.
Post Date: 2024-02-02 11:16:39.0
Update Date: 2024-03-18 08:21:19.0
Expiration Date: unknown
Title: Roadwork, NM 90 northbound and southbound from mile marker 0, Glen Acres to mile marker 42, Silver City.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be Fog Sealing NM 90 from milepost 0 (US70 Intersection) to milepost 45(Silver City). Drivers are asked to please obey traffic control devices if placed and be on the lookout for workers and/or equipment entering and exiting the roadway. Pilot car operations will be in place. Regular work hours will be 8 a.m.-5 p.m. Monday-Thursday.
Post Date: 2024-03-01 06:54:45.0
Update Date: 2024-03-01 06:54:45.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Fair 44°F
30.21in
Barometer
58%
Humidity
West 3.5mph
Wind
Fair

More Local Information

Bookmark and Share

Traffic Nearby

Los Lunas weather and traffic updates by locals

Write your own Los Lunas, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Los Lunas, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Los Lunas, NM report and/or forecast will be removed by a moderator.