Taos Traffic and Road Conditions

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Taos Traffic Alerts

Title: US 54 northbound and southbound from mile marker 107 to mile marker 119
Description: US 54 South of Carrizozo from mm 119 to 107 Speed Limit is reduced to 45 MPH at MM 115-114 due to pavement issues. Motorists should reduce their speed and obey all posted signs.
Post Date: Wed Mar 11 08:34:39 MDT 2015
Update Date: 2015-04-21 14:30:15.182
Expiration Date: unknown
Title: New Mexico 213 from mile marker 0 to mile marker 6, left lane closed.
Description: Flagging operations with traffic reduced to a single lane with pilot car assisting with moving traffic through the work zone. The NMDOT and contractor will be placing an overlay on the existing pavement which will be done from 7 am until 7 pm Monday through Friday. The project is scheduled to be completed by Friday of April 10. Updates will be posted as conditions change.
Post Date: Tue Mar 31 16:45:04 MDT 2015
Update Date: 2015-04-24 15:10:13.601
Expiration Date: unknown
Title: US 54 northbound and southbound from mile marker 130 to mile marker 146
Description: Roadway construction is underway on US 54.The contractor will be working Monday thru Friday from 6:30am to 5:00pm. An 11' WIDTH RESTRICTION is in effect for both north and south bound lanes from mm 130 to mm 146. Motorists can expect one-lane closures in this area and are asked to observe construction signing and watch for personnel working in the area. Expected completion is Summer 2015. Emergency Contacts: NMDOT Project Manager Mark Manning 575-648-4270 and FNF Project Manager Richard Montoya 480-318-5755
Post Date: 2014-12-30 11:34:06.65
Update Date: 2015-04-21 10:30:42.497
Expiration Date: unknown
Title: Interstate 25 northbound and southbound from mile marker 293 to mile marker 294 (CANONCITO)
Description: Santa Fe The New Mexico Department of Transportation (NMDOT) bridge replacement work on I-25 north of Santa Fe at Canoncito between mile markers 293 and 294. The scope of the project includes bridge rehabilitation, roadway and ramp reconstruction, and pavement rehabilitation for 1.42 miles within Santa Fe County. Tom Griego is the NMDOT Project Engineer. AUI is the contractor for this project. Traffic Impacts: Tthe cross road under I-25 (Sleeping Dog Road) and the I- 25 southbound ramp is CLOSED. This closure remains in effect until June 2015. Local traffic and residents on the south side of I-25 will be detoured to the Valencia Exit 297 to access I-25 South. Local traffic and residents on the north side of I-25 (Old Las Vegas Highway) will be detoured to the Lamy Exit 290 to access I-25 northbound and southbound. -All lanes are OPENED on the I-25 northbound and southbound lanes anes. Project anticipated to be completed July 2015; weather permitting. NMDOT urges motorists to proceed through the work zone with caution, watch for construction personnel.
Post Date: Tue Apr 08 16:36:30 MDT 2014
Update Date: 2015-04-24 15:11:36.542
Expiration Date: unknown
Title: New Mexico 174 from mile marker 2 to mile marker 4
Description: Roadway is impassible on NM 174 within the Glenwood area due to large debris that has covered various areas along the route from past rain and snow fall. The NMDOT is currently working on removing the run off, and will make any necessary roadway repairs once the area is clear. Updates will be posted as conditions change.
Post Date: Tue Feb 03 12:14:55 MST 2015
Update Date: 2015-04-24 15:10:13.601
Expiration Date: Sun May 31 12:00:00 MDT 2015
Title: Conditions exist throughout area.
Description: Snow continues to fall and roads are slushy with about an 1" of snow cover. Event will change as condition change.
Post Date: Sun Apr 26 23:51:53 MDT 2015
Update Date: 2015-04-27 04:52:40.0
Expiration Date: Tue Apr 28 04:52:42 MDT 2015
Title: New Mexico 247 eastbound and westbound from mile marker 0 Corona to mile marker 7
Description: Fence replacement. The Contractor will be working Monday through Friday from 7:00 am to 5:00 pm. Motorists should watch for equipment and personnel in the workzone and adhere to all construction signage. Estimated completion is Spring of 2015. Contacts: Mark Manning, NMDOT Project Manager: 575-648-4270
Post Date: 2014-11-23 11:15:57.913
Update Date: 2015-04-21 10:30:42.497
Expiration Date: unknown
Title: New Mexico 549 from mile marker 23 to mile marker 25
Description: A portion of NM 549 east of Deming is CLOSED due to roadway construction. The contractor is currently doing reconstruction on the bridge along this route. The NMDOT has posted detours and traffic control alerting motorists of this workzone. Please proceed with caution.
Post Date: Mon Aug 25 11:35:04 MDT 2014
Update Date: 2015-04-24 15:10:13.601
Expiration Date: Mon Jun 01 01:00:00 MDT 2015
Title: New Mexico 126 eastbound and westbound from mile marker 10 to mile marker 25
Description: DIFFICULT DRIVING CONDITIONS on NM 126 from mile marker 10-25 (from east of Cuba to the Fish Hatchery) Dirt road is very muddy in spots. 4-wheel drive recommended Visibility is good. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: Fri Feb 27 00:45:40 MST 2015
Update Date: 2015-04-24 15:47:28.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Taos NM Traffic Nearby

More Local Information

Bookmark and Share

Taos weather and traffic updates by locals

Write your own Taos, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read the Terms of Service and the Taos, NM report and/or forecast you are posting is in compliance with such terms. Be respectful. An inappropriate Taos, NM report and/or forecast will be removed by a moderator.