Belew Creek Traffic and Road Conditions
×
Warning! Do not attempt to use any of these features while driving a vehicle.
Belew Creek Traffic Map

No Traffic Flow? Choose Live Map then Zoom in Closer
Belew Creek traffic flow and incidents map - how to use it to check live traffic, road conditions, and weather impacts:
A static map with traffic flow is shown first and to start using the interactive map you press the blue Load button above to go live.
Traffic Incidents: Each icon represents a traffic event or incident such as road construction, closure (red circle with a white dash), or accident. In some regions there may also be live traffic camaras to view.
In known extreme weather events or accidents, the map may still show green lines, even if lanes or the entire road are closed.
×
Traffic Alert

Tips
- Click or touch the map to move in different directions.
- If you do not see any markers on the map, try zooming in one or two levels using "+" on the top left side. However, they are not always available.
- Click an incident icon on the map to get more information.
FAQs
Q) How often is the map updated?
A) The traffic flow is updated at loadtime and upon movement outside the initial map view, or upon refresh of the page. Any incident markers are checked for updates approximately every 5-10 minutes, but you need to reload the page to load any new updates; the data provided may still be the same status/view as before. Information shown is as only reliable as how it is reported to us.
Q) The roads are backed up or closed, but the map does not show the reason why, what's the deal?A) Municipal traffic monitors or GPS trackers may not be available, could be offline, or reports and alerts are not syndicated to media outside of the area to use on the map. This is especially true for rural areas. You are encouraged to leave a road conditions report to help others.
Q) I see traffic alerts in the box below for the state, but they aren't related to the area I'm in? A) We attempt to display alerts as specific to the area as possible, however in some cases the data we receive will only allow us to provide it by county or even statewide.
Q) Are you an official source of traffic information? A) We are not an official source of traffic or real-time data. We have contracts and licenses to display certain up-to-date information that comes direct from some DOTs in various states, and the traffic flow on the maps is provided by Google, Mapbox or TomTom. However, the data shown here should only be used for light informational and reference purposes and not to make critical decisions. Your safest option on the web is to use your state-run traffic website, or to call the DOT traffic line for your state, local authorities, or the state's 511 number if available.
Belew Creek Traffic Alerts
70 | Lanes Closed on US-70 (US 70) Near James City / Both Directions Starting at 7 p.m. tonight, Friday, April 10, one lane of U.S. 70 Eastbound and Westbound will be closed at Thurman Road for road construction until 6 a.m. Monday, April 13. Please pay close attention to posted signs for directions and be cautious as you drive through this active construction zone. This work is weather dependent. DETOUR: Starting at 7 p.m. tonight, Friday, April 10, one lane of U.S. 70 Eastbound and Westbound will be closed at Thurman Road for road construction until 6 a.m. Monday, April 13. Please pay close attention to posted signs for directions and be cautious as you drive through this active construction zone. This work is weather dependent. Start: April 11, 2026, 11:00 am / End:April 12, 2026, 11:00 pm / Updated: April 10, 2026, 2:47 pm |
64 | Moving Closure on US-64 (Wilkesboro Blvd/Taylorsville Rd) Near Lenoir / Mile Marker 8.5 to 19.6 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 6:24 pm |
52 | Ramp Closed on US-52 (US52) In Winston-Salem / Heading South NCDOT Bridge Maintenance will be closing the ramp from US-52 southbound to I-40 eastbound in order to perform temporary repairs to US 52 bridge (Br. 034-0078) concrete substructure. Ramp closure will be in place from 7:00 pm Sunday until 6:00 am Monday. A signed detour will be in place, with motorists following US 52 southbound to Exit 105 Clemmonsville Rd., back to US 52 northbound, and then to Exit 107A to I-40 eastbound. DETOUR: US 52 southbound to Exit 105 Clemmonsville Rd. to US 52 northbound to I-40 eastbound. Start: April 12, 2026, 11:00 pm / End:April 13, 2026, 10:00 am / Updated: April 10, 2026, 6:45 pm |
321 ALT | Moving Closure on US-321 ALT Near Lenoir / Mile Marker 8.1 to 11.8 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 6:24 pm |
221 | Moving Closure on US-221 Near Jefferson / Mile Marker 15.7 to 17.1 Both Directions Repair snpwplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 7:57 pm |
19 | Lane Closed on US-19 (S North Carolina 226) In Spruce Pine / Heading West The right lane will be closed near NC 226, Trans America Trail, for bridge maintenance. Start: April 13, 2026, 1:00 pm / End:April 13, 2026, 8:00 pm / Updated: April 9, 2026, 10:39 pm |
19 | Lane Closed on US-19 (S North Carolina 226) In Spruce Pine / Heading East The right lane will be closed near NC 226, Trans America Trail, for bridge maintenance. Start: April 13, 2026, 1:00 pm / End:April 13, 2026, 8:00 pm / Updated: April 9, 2026, 10:37 pm |
17 | Lanes Closed on US-17 Near Washington / Both Directions Bridge preservation work is being performed on US 17. The work will begin by closing the outside lanes for several days to switch pavement markings to temporary pattern. Once installed, the inside lanes in both directions will be closed with traffic on the outside lanes. After inside lane work is completed, the traffic pattern will switch and the outside lanes will be closed with traffic on the interior lanes. DETOUR: No detour route is being utilized. The bridges will remain open during normal hours with the use of a continuous lane closure to perform the work. Start: April 20, 2026, 11:00 am / End:June 1, 2028, 10:00 pm / Updated: April 10, 2026, 7:46 pm |
158 | Local Traffic Only on US-158 (US 158) In Stokesdale / Both Directions New traffic signal to help local traffic. DETOUR: No detour necessary. Start: April 13, 2026, 12:30 pm / End:April 13, 2026, 1:00 pm / Updated: April 9, 2026, 2:32 pm |
4121 | Congestion on SR-4121 (West Gate City Boulevard) In Greensboro / Both Directions The Greensboro Coliseum is hosting a concert on Tuesday, April 14th, 2026. This event is expected to draw a large number of patrons to the area and surrounding roadways. Expect higher traffic volumes on I-40 East and West, I-85 North and South, I-73 North and South, US 29 North and South, West Gate City Boulevard in both directions, and other surrounding roadways. The Greensboro Coliseum Complex, GPD, GDOT and NCDOT advise all patrons to plan to arrive at least one hour early, and carpooling is strongly encouraged. Start: April 14, 2026, 9:30 pm / End:April 15, 2026, 12:00 am / Updated: April 10, 2026, 7:11 pm |
2343 | Lanes Closed on SR-2343 (S Mangum St) Near Durham / Heading South The two right lanes are closed at NC 147. Start: February 25, 2026, 4:07 pm / End:April 30, 2026, 10:00 pm / Updated: April 10, 2026, 9:48 pm |
2282 | Road Closed with Detour on SR-2282 (Affinity Rd.) East of Marietta / Both Directions Replace Crossline #7 DETOUR: Detour Affinity Rd. (SR-2282) to Page Circle (SR-2283) to Nance (SR-2284) back to Affinity Rd. (SR-2282). Start: April 13, 2026, 12:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 10, 2026, 11:35 am |
2224 | Lanes Closed on SR-2224 (Mitchell Mill Rd) Near Rolesville / Heading West The two right lanes are closed at US 401/Louisburg Rd. Start: March 20, 2026, 12:00 pm / End:April 13, 2026, 9:00 pm / Updated: April 11, 2026, 1:19 am |
2101 | Local Traffic Only on SR-2101 (Athens Rd) In Stokesdale / Both Directions New traffic signal to help local traffic. DETOUR: No detour necessary. Start: April 13, 2026, 12:30 pm / End:April 13, 2026, 1:00 pm / Updated: April 9, 2026, 2:32 pm |
2024 | Road Closed on SR-2024 (Covington Rd) South East of Lillington / Mile Marker 2.1 to 2.1 Both Directions Covington Rd (SR-2024) will be closed .25 miles North of Byrds Mill Rd (SR-2024) due to crossline replacement. Start: April 13, 2026, 12:00 pm / End:April 17, 2026, 7:00 pm / Updated: April 8, 2026, 7:24 pm |
1929 | Moving Closure on SR-1929 (Crump Rd.) Near Lenoir / Mile Marker 0 to 1.5 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 6:45 pm |
1738 | Road Closed with Detour on SR-1738 (Peoples Road) East of Bath / Both Directions Failed bridge culvert replacement DETOUR: Start on SR1738[Peoples Road] - SR1732[Burbage Road] - NC99 - NC92 - End on SR 1738[Peoples Road] Start: April 7, 2026, 5:00 pm / End:May 1, 2026, 9:00 pm / Updated: April 7, 2026, 5:00 pm |
1726 | Lane Closed on SR-1726 (Portertown Road) Near Greenville / Both Directions Minor patching work is being performed at two locations between Herman Garris and Raynez Roads. This work will utilize a lane closure with pilot vehicle. Work will be completed and the road fully reopened same day. DETOUR: No detour route. Lane closure will be utilized. Start: April 13, 2026, 12:00 pm / End:April 14, 2026, 12:00 am / Updated: April 10, 2026, 7:37 pm |
1725 | Road Closed with Detour on SR-1725 (County Home Rd) East of Winterville / Both Directions County Home Rd will be closed to replace a failing crossline ahead of resurfacing project. DETOUR: County Home Rd to Raymond Harris Rd to Stanley Rd to NC 102 to County Home Rd Start: April 13, 2026, 12:00 pm / End:April 17, 2026, 9:00 pm / Updated: April 9, 2026, 1:51 pm |
1725 | Road Closed with Detour on SR-1725 (Millhouse Rd) In Chapel Hill / Both Directions Millhouse Rd will be closed overnight for deck pour. This closure will be from Tuesday, April 14th at 11PM until Wednesday, April 15th at 5AM. A signed detour will be provided to direct traffic around the closures. DETOUR: NB traffic will take Eubanks Rd and turn left onto NC 86 to get on Millhouse Rd. SB traffic will take NC 86 and turn right onto Eubanks Rd to get on Millhouse Rd. Start: April 15, 2026, 3:00 am / End:April 15, 2026, 9:00 am / Updated: April 7, 2026, 9:13 pm |
1710 | Road Closed with Detour on SR-1710 (Glenn Rd) Near Parkton / Both Directions Cross Line Replacement # 1 On SR 1710-Glenn Rd DETOUR: Barlow Rd-SR 1712 to Davis Bridge Rd - SR 1713 back to Glenn Rd- SR 1710 Start: April 13, 2026, 11:00 am / End:April 17, 2026, 8:00 pm / Updated: April 10, 2026, 11:42 am |
1710 | Road Closed on SR-1710 (Sumner Road) North of Beulaville / Both Directions NCDOT will be closing Sumner Road due to damage to a bridge over Gum Branch near Sarecta Road. It is unclear when this road will reopen. DETOUR: There is NO posted detour. Start: April 10, 2026, 6:45 pm / End:April 13, 2026, 9:00 pm / Updated: April 10, 2026, 6:56 pm |
1555 | Road Closed with Detour on SR-1555 (Jones St) In Pembroke / Both Directions Widening Project on Jones St (SR 1555) from Thirds St to Second St DETOUR: South Jones St -SR 1555 to Deep Branch Rd -SR 1339 to Candy Park SR 1553 back to NC 711 (Third St) Start: April 13, 2026, 11:00 am / End:April 17, 2026, 8:00 pm / Updated: April 8, 2026, 3:47 pm |
1552 | Moving Closure on SR-1552 (Poplar Grove Rd. S) Near Boone / Mile Marker 0 to 1.2 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 7:20 pm |
1519 | Road Closed on SR-1519 (Arthur Collier Road) Near Western Prong / Both Directions Road Closed due to the replacement of a crossline pipe under the roadway. Start: April 13, 2026, 12:00 pm / End:April 17, 2026, 9:30 pm / Updated: April 8, 2026, 6:21 pm |
1514 | Moving Closure on SR-1514 (Bamboo Rd.) Near Boone / Mile Marker 2.7 to 3.2 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 9:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 7:27 pm |
1459 | Road Closed on SR-1459 (Walton Road) East of Jacksonville / Heading North Road construction at the R/R crossing. Start: April 13, 2026, 12:00 pm / End:May 29, 2026, 9:00 pm / Updated: April 9, 2026, 11:43 am |
1317 | Road Closed on SR-1317 (Morreene Rd) Near Durham / Both Directions The road is closed from Erwin Rd to Mordecai St due to pipe replacement. Start: April 27, 2026, 4:00 am / End:May 4, 2026, 9:00 pm / Updated: April 7, 2026, 9:34 pm |
1315 | Moving Closure on SR-1315 (Big Laurel Rd.) Near TN State Line / Mile Marker 0 to 7.6 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 8:21 pm |
1248 | Moving Closure on SR-1248 (Baldwin Rd./Beaver Creek School Rd.) Near West Jefferson / Mile Marker 0 to 4.2 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 8:10 pm |
1221 | Lane Narrowed on SR-1221 (Holiday Drive) West of Troy / Mile Marker 0 Both Directions NCDOT will replace a crossline on Holiday Drive beginning on Monday 4/6/2026. DETOUR: NCDOT will construct temporary lanes on the shoulder of Holiday Drive so traffic will continue to flow during the crossline replacement. Start: April 6, 2026, 12:00 pm / End:April 15, 2026, 7:30 pm / Updated: April 10, 2026, 10:23 am |
1216 | Road Closed on SR-1216 (N 6th St) Near Wilmington / Both Directions The road is closed between Brunswick St and Campbell St due to bridge inspections. Start: April 21, 2026, 12:00 pm / End:April 21, 2026, 9:00 pm / Updated: April 8, 2026, 4:25 pm |
1193 | Road Closed on SR-1193 (Meadowfork) South West of Sparta / Both Directions Meadowfork Road closed for slope repair .1 of a mile south of Roberts Road Start: April 8, 2026, 12:53 pm / End:April 17, 2026, 7:30 pm / Updated: April 8, 2026, 1:02 pm |
1193 | Road Closed with Detour on SR-1193 (Old NC Hwy 49) West of Asheboro / Both Directions DETOUR: Detour is Moore Rd (SR 1318) to Golden Meadow Rd (SR 1317) to Jackson Creek Rd (SR 1314) to Old NC Hwy 49 (SR 1193) Start: April 6, 2026, 12:00 pm / End:April 17, 2026, 7:30 pm / Updated: April 9, 2026, 11:14 am |
1173 | Road Closed with Detour on SR-1173 (Williams Rd) South West of Lewisville / Both Directions NCDOT Maintenance forces will have an extended road closure necessary for crews to perform an emergency repair/replacement of a failing crossline underneath the roadway. Motorists are encouraged to stay alert and use caution when nearing the work zone and following the signed detour and are encouraged to use an alternate route. DETOUR: Follow in place signed detour, SR 3652 (Cresthaven Rd) will be accessible coming from US 421. Start: April 6, 2026, 1:00 pm / End:April 17, 2026, 9:00 pm / Updated: April 8, 2026, 3:41 pm |
1168 | Road Closed on SR-1168 (Lattimore Rd) In Mooresboro / Both Directions Contractor is installing steel casing for new waterline. Start: April 15, 2026, 1:00 pm / End:April 15, 2026, 8:00 pm / Updated: April 8, 2026, 12:31 pm |
1162 | Lane Closed on SR-1162 (Penland Road) Near Spruce Pine / Both Directions A lane will be closed near River Road for bridge inspection. DETOUR: Follow direction of on scene personnel. Start: May 12, 2026, 6:00 pm / End:May 12, 2026, 11:00 pm / Updated: April 9, 2026, 10:48 pm |
1153 | Moving Closure on SR-1153 (Clarks Chapel Rd.) Near Lenoir / Mile Marker 2.1 to 3.9 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 6:55 pm |
1153 | Moving Closure on SR-1153 (Spanish Oaks Rd.) Near Newland / Mile Marker 0 to 2.3 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 7:34 pm |
1153 | Permanent Road Closure on SR-1153 (US 70 Eastbound Service Rd) In James City / Heading East On Thursday, April 9, new portions of the U.S. 70 Eastbound service road (SR 1153) off of Williams Road and Airport Road will open to traffic. New entrances to the eastbound service road on Williams Road and Airport Road will reroute travelers to the existing service road between B & J Seafood and AutoZone Auto Parts. The existing entrances to the eastbound service road will be closed. This link shows what the new service road will look like for travelers: https://publicinput.com/Customer/File/Full/4d632e1e-6009-4ab2-b709-b687264c88fd. U.S. 70 service roads are being relocated away from the highway to improve safety and access to local businesses. As this location is still under construction, NCDOT encourages the public to use caution when driving through the area. This work is weather dependent. DETOUR: On Thursday, April 9, new portions of the U.S. 70 Eastbound service road (SR 1153) off of Williams Road and Airport Road will open to traffic. New entrances to the eastbound service road on Williams Road and Airport Road will reroute travelers to the existing service road between B & J Seafood and AutoZone Auto Parts. The existing entrances to the eastbound service road will be closed. This link shows what the new service road will look like for travelers: https://publicinput.com/Customer/File/Full/4d632e1e-6009-4ab2-b709-b687264c88fd. U.S. 70 service roads are being relocated away from the highway to improve safety and access to local businesses. As this location is still under construction, NCDOT encourages the public to use caution when driving through the area. This work is weather dependent. Start: April 9, 2026, 9:00 pm / End:April 9, 2027, 9:00 pm / Updated: April 7, 2026, 6:51 pm |
1134 | Moving Closure on SR-1134 (Union Grove Rd.) Near Lenoir / Mile Marker 3 to 5.3 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 6:51 pm |
1121 | Lane Closed on SR-1121 (Altapass Highway) Near Spruce Pine / Both Directions A lane will be closed near Walnut Straight Road for bridge inspection. DETOUR: Follow direction of on scene personnel. Start: May 12, 2026, 1:00 pm / End:May 12, 2026, 6:00 pm / Updated: April 9, 2026, 10:40 pm |
1120 | Road Closed on SR-1120 (Greedy Hwy) South West of Mountain View / Both Directions All lanes of Greedy Hwy (SR 1120) at Spurgeons Rd will be closed for pipe replacement. NO through traffic will be allowed - Local traffic only will be allowed on either end of Greedy Hwy. Start: April 13, 2026, 11:00 am / End:April 24, 2026, 7:30 pm / Updated: April 10, 2026, 3:38 pm |
1100 | Road Closed on SR-1100 (Old Market Rd) Near Macclesfield / Both Directions The road is closed between NC-222 and Turnage Rd for culvert replacement. Start: April 8, 2026, 12:00 pm / End:May 1, 2026, 9:00 am / Updated: April 8, 2026, 11:38 am |
1012 | Road Closed with Detour on SR-1012 (Western Blvd) Near Raleigh / Heading East The road is closed at I-440. Start: April 13, 2026, 1:00 am / End:April 13, 2026, 9:30 am / Updated: April 10, 2026, 3:43 pm |
1005 | Road Closed with Detour on SR-1005 (Green Path Rd) South West of Plain View / Both Directions Emergency Closure Bridge Maintenance 35.22972, -78.60045 DETOUR: Green Path Rd to Phillips Rd to Archie Lee Rd to North Spring Branch Rd. Start: April 8, 2026, 12:13 am / End:April 17, 2026, 9:00 pm / Updated: April 8, 2026, 12:21 am |
1004 | Road Closed with Detour on SR-1004 (Hugo Rd) North of Kinston / Both Directions Pipe Replacement DETOUR: Follow posted detour Start: April 20, 2026, 12:00 pm / End:May 1, 2026, 9:00 pm / Updated: April 8, 2026, 7:39 pm |
1002 | Road Closed with Detour on SR-1002 (Crabtree Rd.) South of Spruce Pine / Both Directions The road is closed for emergency maintenance repairs. DETOUR: Public is advised to follow installed signage. Start: April 9, 2026, 1:53 pm / End:April 9, 2027, 9:00 pm / Updated: April 10, 2026, 10:30 am |
1001 | Moving Closure on SR-1001 (Hibriten Dr.) Near Lenoir / Mile Marker 0 to 1.2 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 6:36 pm |
1001 | Road Closed with Detour on SR-1001 (Hallsboro Road) South East of Whiteville / Both Directions Road Closed due to the replacement of a crossline pipe under the roadway. DETOUR: Northbound: At the Road Closed Detour make a right onto SR1925 Honey Field Road. Take Honey Field Road for 1.52 miles back around to SR1001 Hallsboro Road. Take a right back onto Hallsboro road and continue on your destination. Southbound: At the Road Closed Detour make a Left onto SR1925 Honey Field Road. Take Honey Field Road for 1.52 miles back around to SR1001 Hallsboro Road. At the stop sign take a Left back onto Hallsboro road and continue on your destination. Start: April 13, 2026, 12:00 pm / End:April 17, 2026, 9:30 pm / Updated: April 8, 2026, 5:55 pm |
87 | Lane Closed on NC-87 Near Fayetteville / Heading South Milling and Paving Operation Start: April 9, 2026, 12:30 pm / End:April 30, 2026, 8:00 pm / Updated: April 8, 2026, 9:00 pm |
540 | Lane Closed on NC-540 Near Holly Springs / Mile Marker 50 to 45 Heading East The right lane is closed past Exit 50 (Holly Springs Rd) due to maintenance. Start: April 13, 2026, 12:00 pm / End:April 17, 2026, 9:00 pm / Updated: April 9, 2026, 7:06 pm |
45 | Road Closed with Detour on NC-45 (NC 45) North of Windsor / Both Directions NC 45 will be closed starting Friday April 10 at 6:00PM for replacement of two existing crosslines near San Souci Rd. DETOUR: Construction crews will begin replacement of existing crosslines near San Souci Rd on Friday night, April 10 at 6:00 PM. Work will be completed and NC 45 reopened by Monday morning, April 13 at 6:00 AM. Thru traffic will be directed to follow a signed detour from NC 45 onto NC 308 (Cooper Hill Rd), to San Souci Rd. Local, residential traffic will be allowed into the closure up to the point of the crossline replacement. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 10:00 am / Updated: April 8, 2026, 12:39 pm |
32 | Road Closed with Detour on NC-32 In Washington / Both Directions Piedmont Natural Gas will be closing a section of W. 3rd St in between Bridge St & Van Norden St in order to repair a gas main leak. DETOUR: Eastbound traffic on W. 3rd St will have to turn left on Bridge St, turn right onto 5th Street, turn right onto Market St, and then turn left to continue onto W. 3rd Street. Westbound traffic on W. 3rd St will have to turn right onto Market St, then turn left onto 5th Street, turn left onto Bridge St, then turn right to continue onto 3rd Street. Start: April 20, 2026, 11:00 am / End:April 21, 2026, 11:00 pm / Updated: April 9, 2026, 1:27 pm |
280 | Lane Closed on NC-280 (Asheville Hwy) In Brevard / Both Directions A resurfacing project will take place on NC-280 starting 4/15/26. This project will involve milling old asphalt and replacing it with new asphalt, thermoplastic striping, rumble strips, snowplowable reflectors, and shoulders. This operation will be from the hours of 7:00 AM to 5:00 PM, Monday though Friday. One lane closures are to be expected throughout this project. The completion date is expected to be 10/16/26. DETOUR: A resurfacing project will take place on NC-280 starting 4/15/26. This project will involve milling old asphalt and replacing it with new asphalt, thermoplastic striping, rumble strips, snowplowable reflectors, and shoulders. This operation will be from the hours of 7:00 AM to 5:00 PM, Monday though Friday. One lane closures are to be expected throughout this project. The completion date is expected to be 10/16/26. Start: April 15, 2026, 11:00 am / End:October 16, 2026, 9:00 pm / Updated: April 7, 2026, 6:15 pm |
251 | Ramp Closed on NC-251 (Riverside Drive) In Asheville / Both Directions The on-ramp from NC 251 (Riverside Drive), in both directions, to I-26 East will be closed. DETOUR: Motorists are advised to follow the direction of on scene personnel. Start: April 17, 2026, 12:00 am / End:June 30, 2026, 10:00 am / Updated: April 10, 2026, 1:48 pm |
194 | Moving Closure on NC-194 Near Boone / Mile Marker 5.3 to 9.1 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 7:15 pm |
194 | Moving Closure on NC-194 Near Lansing / Mile Marker 17.8 to 31 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 8:04 pm |
18 | Moving Closure on NC-18 (Wilkesboro Blvd) Near Lenoir / Mile Marker 9.8 to 14.3 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 6:24 pm |
16 | Moving Closure on NC-16 Near Jefferson / Mile Marker 11.4 to 23.6 Both Directions Repair snowplowable pavement markers. Start: April 10, 2026, 10:00 pm / End:April 13, 2026, 11:00 am / Updated: April 10, 2026, 7:46 pm |
95 | Shoulder Closed on I-95 Near Roanoke Rapids / Mile Marker 174 to 173 Heading South Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 3:02 pm |
95 | Shoulder Closed on I-95 Near Roanoke Rapids / Mile Marker 172 to 172.5 Heading North Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 1:37 pm |
95 | Shoulder Closed on I-95 Near Kenly / Mile Marker 106.5 to 107 Heading North Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 1:34 pm |
87 | Road Closed with Detour on I-87 Near Knightdale / Mile Marker 7 to 9 Heading North Road closure to set girders for new bridge construction over I-87 as part of Complete 540 Phase 2 project. DETOUR: North Bound I-87 traffic will be directed to take Exit 7, flyover on ramp to I-540 West Bound, where traffic will then take Exit 24 to US-64 Business. At the intersection, traffic will turn right onto US-64 Business and follow US-64 back to the I-87/US 64 interchange, utilizing the on-ramp to regain entry to I-87 NB. Start: April 10, 2026, 3:00 am / End:April 12, 2026, 10:00 am / Updated: April 9, 2026, 2:15 pm |
87 | Lane Closed on I-87 Near Knightdale / Mile Marker 7 Heading North Start: April 14, 2026, 1:00 am / End:April 15, 2026, 9:00 am / Updated: April 10, 2026, 6:33 pm |
87 | Shoulder Closed on I-87 In Raleigh / Mile Marker 5 to 4 Heading South Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 3:07 pm |
87 | Shoulder Closed on I-87 In Raleigh / Mile Marker 3 to 4 Heading North Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 3:05 pm |
87 | Road Closed with Detour on I-87 Near Knightdale / Mile Marker 7 Heading North Facility Bridge Construction DETOUR: Road Closure of I-87 NB from Midnight to 5am Start: April 14, 2026, 3:55 am / End:April 15, 2026, 9:00 am / Updated: April 10, 2026, 6:41 pm |
87 | Road Closed with Detour on I-87 Near Knightdale / Mile Marker 7 Heading South Facilitate Bridge Construction DETOUR: After double lane closure in place at 11 pm, road closed at 12am to 5am Start: April 15, 2026, 6:37 pm / End:April 17, 2026, 9:00 am / Updated: April 10, 2026, 6:40 pm |
87 | Lanes Closed on I-87 Near Knightdale / Mile Marker 7 Heading South Facilitate Bridge Construction DETOUR: Single Lane Closure starting at 9pm, moving to double lane closure at 11pm Start: April 16, 2026, 1:00 am / End:April 17, 2026, 9:00 am / Updated: April 10, 2026, 6:36 pm |
85 | Lane Closed on I-85 Near Haw River / Mile Marker 148 to 151 Both Directions Replacing Overhead signs Start: April 13, 2026, 1:00 am / End:April 14, 2026, 9:00 am / Updated: April 10, 2026, 1:59 am |
85 | Lane Closed on I-85 In Charlotte / Mile Marker 27 to 29 Both Directions Lane closure for construction related to project C204556 (Broadband Installation) along I-85 between MM 27 and MM 29 in the north and south bound directions. Start: April 23, 2026, 1:00 am / End:April 29, 2026, 10:00 am / Updated: April 10, 2026, 7:21 pm |
85 | Moving Closure on I-85 Elon and Mebane / Mile Marker 139 to 155 Both Directions Re-lense pavement marker DETOUR: Re-lense pavement markers Start: April 10, 2026, 1:00 am / End:May 8, 2026, 9:00 am / Updated: April 10, 2026, 1:53 am |
85 | Shoulder Closed on I-85 In Charlotte / Mile Marker 34 to 33 Heading South Logo sign maintenance Start: April 20, 2026, 1:00 pm / End:April 24, 2026, 8:00 pm / Updated: April 7, 2026, 3:14 pm |
85 | Shoulder Closed on I-85 South of Oxford / Mile Marker 200 to 201 Heading North Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 1:30 pm |
77 | Moving Closure on I-77 Near Jonesville / Mile Marker 79 to 80 Both Directions Rolling road block for Utility Construction. Start: April 23, 2026, 4:00 am / End:April 23, 2026, 9:00 am / Updated: April 10, 2026, 1:41 pm |
77 | Shoulder Closed on I-77 Near Jonesville / Mile Marker 81 to 82 Heading North Logo sign maintenance Start: April 20, 2026, 1:00 pm / End:April 24, 2026, 8:00 pm / Updated: April 7, 2026, 3:09 pm |
74 | Lane Closed on I-74 In Winston-Salem / Mile Marker 57 to 59 Heading East Lane Closures Scheduled on I-74 in Forsyth County WINSTON-SALEM – ??A contractor for the N.C. Department of Transportation will begin alternating lane closures on a section of Interstate 74 East next week. The one lane of I-74 East from Before Ridgewood Road (Exit 56) to Union Cross Road (Exit 59) One lane will be closed from April 13 through April 17. Crews plan to close the right lane to begin with on April 13 @ 7:00 am. Crews will alternate the lane closures through April 17 from The work is necessary to allow crews to switch to the new alignment. Significant traffic delays are expected, and motorists are urged to plan ahead and follow posted detour. DETOUR: WINSTON-SALEM – A contractor for the N.C. Department of Transportation will begin alternate lane closures on Interstate 74 east Bound ½ mile form Ridgewood Road (Exit 56). Union Cross Road (Exit 59). Between April 13 @ 7:00 am to April 17 @ 3:00 pm a lane closure will be installed on the East Bound I-74 until all work is completed. We will alternate lane closures as work progress until the work is completed. Significant traffic delays are expected, and motorists are urged to plan ahead Start: April 13, 2026, 11:00 am / End:April 17, 2026, 7:00 pm / Updated: April 10, 2026, 5:03 pm |
74 | Lane Closed on I-74 West of Kernersville / Mile Marker 53 Heading South A lane will be closed on the bridge which crosses Smith Creek for bridge inspection. The bridge is approximately 1/2 mile before Exit 53 (US 421/NC 150/Salem Parkway). Motorists are advised to slow down and follow the direction of on site traffic controls. Start: April 14, 2026, 12:00 pm / End:April 14, 2026, 8:00 pm / Updated: April 8, 2026, 4:38 pm |
74 | Lane Closed on I-74 Near Maxton / Mile Marker 192 to 194 Heading East The right lane is closed past Exit 191 (NC-71) for bridge maintenance. Start: April 13, 2026, 11:00 am / End:April 14, 2026, 10:00 pm / Updated: April 10, 2026, 9:06 pm |
587 | Shoulder Closed on I-587 South of Wilson / Mile Marker 47 to 48 Heading East Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 1:31 pm |
540 | Shoulder Closed on I-540 Near Cary / Mile Marker 3 to 3.4 Heading East Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 1:31 pm |
540 | Ramp Closed on I-540 Near Raleigh / Mile Marker 26 Heading East The ramp is closed to Exit 26B (I-87 N). Start: April 11, 2026, 12:32 am / End:April 11, 2026, 10:00 pm / Updated: April 11, 2026, 12:42 am |
540 | Shoulder Closed on I-540 North East of Raleigh / Mile Marker 18 to 18.2 Heading East Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 1:31 pm |
485 | Shoulder Closed on I-485 In Charlotte / Mile Marker 19.4 to 56.8 Heading South Logo sign maintenance Start: April 20, 2026, 1:00 pm / End:April 24, 2026, 8:00 pm / Updated: April 7, 2026, 3:16 pm |
485 | Shoulder Closed on I-485 (Monroe Expressway) Near Charlotte / Mile Marker 61 Inner Loop The right shoulder is closed past Exit 61 (Johnston Rd). Start: April 11, 2026, 3:30 pm / End:April 11, 2026, 6:30 pm / Updated: April 11, 2026, 4:46 pm |
440 | Ramp Closed on I-440 Near Raleigh / Mile Marker 2 Heading West The ramp is closed at Exit 2 (Western Blvd). Start: April 13, 2026, 1:00 am / End:April 13, 2026, 9:30 am / Updated: April 11, 2026, 8:24 am |
40 | Lane Closed on I-40 Near Clyde / Mile Marker 27.5 Heading West The right lane will be closed before Exit 27, US 74 (Great Smoky Mountains Expy) for bridge inspection. Start: April 15, 2026, 2:00 pm / End:April 15, 2026, 6:00 pm / Updated: April 10, 2026, 7:39 pm |
40 | Lane Closed on I-40 (I-40) North East of Mocksville / Mile Marker 174 to 176 Heading East On Monday April 13th contract forces are scheduled to close the right lane on I-40 Eastbound from mile marker 174 to mile marker 176 from 9:00 am to 3:00 pm. The lane closure is needed so the contractor can safely enter and exit the interstate at the project site to place asphalt on the shoulders. Start: April 13, 2026, 1:00 pm / End:April 13, 2026, 7:00 pm / Updated: April 10, 2026, 5:59 pm |
40 | Ramp Closed on I-40 In Chapel Hill / Mile Marker 266 Heading East Exit 266 (NC 86) I-40 EB Exit Ramp will be closed for concrete demo and ramp construction. This will be closed on a nightly basis by 10 PM and reopened on a daily basis by 5 AM beginning on Wednesday, April 8th, 2026 and ending on Thursday, April 23rd, 2026. A signed detour will be provided to direct traffic around the closures. DETOUR: Traffic will take Exit 263 (New Hope Church Rd), turn left and then turn right to get on NC 86. Start: April 9, 2026, 2:00 am / End:April 23, 2026, 9:00 am / Updated: April 8, 2026, 4:31 pm |
40 | Shoulder Closed on I-40 South of Durham / Mile Marker 275 to 274 Heading West Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 1:29 pm |
40 | Shoulder Closed on I-40 Near Durham / Mile Marker 278 to 276 Heading West Logo sign maintenance Start: April 13, 2026, 1:00 pm / End:April 17, 2026, 8:00 pm / Updated: April 7, 2026, 1:30 pm |
295 | Ramp Lane Closed on I-295 Near Eastover / Mile Marker 34 Heading North A ramp lane is closed at Exit 34 (I-95). Start: April 7, 2026, 1:16 pm / End:April 13, 2026, 4:00 pm / Updated: April 10, 2026, 5:44 pm |
285 | Ramp Closed on I-285 (I-285/US-52) Near Welcome / Mile Marker 99 to 101 Heading North The right lane of I-285/US-52 will be closed between the Exit 100 ramp to Hickory Tree Rd and mile post 101. The North Bound on ramp from Hickory Tree Rd will be closed with a detour. The closures will be in place between the hours of 8:00 am and 5:30 pm each day. We anticipate that the work will take three working days. Work is scheduled to begin on April 21, 2026. DETOUR: The authorized detour for access to I-285 will be Hickory Tree Rd to Old Hwy 52 to I-285. A link to map showing the detour route is listed above. Start: April 21, 2026, 12:00 pm / End:April 23, 2026, 9:30 pm / Updated: April 8, 2026, 12:43 pm |
285 | Lane Closed on I-285 (I-285/US-52) Near Welcome / Mile Marker 99.5 to 101 Heading North The right lane of I-285/US-52 will be closed between the Exit 100 ramp to Hickory Tree Rd and mile post 101. The North Bound on ramp from Hickory Tree Rd will be closed with a detour. The closures will be in place between the hours of 8:00 am and 5:30 pm each day. We anticipate that the work will take three working days. Work is scheduled to begin on April 21, 2026. DETOUR: The authorized detour for access to I-285 will be Hickory Tree Rd to Old Hwy 52 to I-285. A link to map showing the detour route is listed above. Start: April 21, 2026, 12:00 pm / End:April 23, 2026, 9:30 pm / Updated: April 8, 2026, 12:55 pm |
26 | Ramp Closed on I-26 In Asheville / Mile Marker 27 Heading West The off ramp for Hill Street, SR-1231 (Not an actual numbered exit), from I-26 West will be closed. DETOUR: Motorists are advised to follow the direction of on scene personnel. Start: April 18, 2026, 12:00 am / End:June 30, 2026, 10:00 am / Updated: April 10, 2026, 2:16 pm |
140 | Lanes Closed on I-140 (I-140) West of Leland / Mile Marker 0 to 6 Both Directions Bridge Preservation work from US17 to US74. Work in the east bound lanes will begin at 8:30 AM and work on the west bound lanes will begin at 8:00 AM Start: April 8, 2026, 12:00 pm / End:April 17, 2026, 10:00 am / Updated: April 8, 2026, 10:59 am |
source: North Carolina DOT
Tweets by NCDOT
National Traffic Forecast
Currently
| 82°F |
30.26 inHg.
Barometer 34%
Humidity NNW 7.2 mph Wind |
|
| Sunny | ||