Columbus, NM Traffic and Road Conditions

Columbus Traffic Map

No Traffic Flow? Zoom in Closer or Refresh

How to use the Columbus Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

Traffic Incidents (beta): Each dot represents a traffic event or incident such as road construction, closure or accident. At closer zoom levels, those dots can be pressed to see more info. Once a layer of traffic info has popped-up, be sure to press/click any additional arrows (e.g. 1 of 3) in the top right above the title to see other the details of the impact.

Impact Legend: Traffic and Road Incident Icon - Critical Impact Critical Traffic and Road Incident Icon - Major Impact Major Traffic and Road Incident Icon - Minor Impact Minor Traffic and Road Incident Icon - Low Impact Low

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Columbus Traffic Alerts

Title: Lane Closure, US 285 northbound from mile marker 223 Duran to mile marker 236.
Description: Lane Closure~~~Repaving project starting 9/29/2020 will have rolling lane closures NORTHBOUND. The project has 2 phases - MM 223 to 227, and MM 234 to 236. Work will occur from 7:00 AM to 6:00 PM each day, and motorists should expect delays during these hours. The project is expected to be completed by November 30th, 2020. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2020-09-30 08:15:24.0
Update Date: 2020-09-30 08:15:24.0
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 43 to mile marker 54.
Description: Roadwork~~~Roadwork is underway for an overlay project between MP 43 (East of Mayhill) to MP 54 on US 82. Motorists are to expect lane closures in both East and Westbound lanes. Please obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished on September 25th, 2020, weather permitting. NMDOT Project Office 575-808-9769; Brian Torres NMDOT Project Manager 575-626-7278; Contractor Braiser Asphalt Inc., 575-494-6311.
Post Date: 2020-08-26 07:36:48.0
Update Date: 2020-09-08 12:43:35.0
Expiration Date: unknown
Title: Closure, US 64 at mile marker 252 Taos Pueblo.
Description: Closure~~~ As Per Mr. Mondragon LT. Governor, ALL TAOS PUEBLO WILL BE CLOSED FOR EVERYONE WHO IS NOT RESIDENTIAL. Be advised the ONLY entrance open to residents is through Veterans Highway, which will be monitored by law enforcement. (ONLY TRIBAL RESIDENTS). Safety precautions during the COVID-19
Post Date: 2020-03-25 15:33:33.0
Update Date: 2020-03-25 15:33:33.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 39, Ciniza Refinery Interchange to mile marker 42, 16 miles east of Gallup.
Description: Roadwork~~~Roadwork on I-40 from mile marker 39-42 (Ciniza Refinery). Eastbound passing lane and westbound driving lane will be closed. Speed reduced to 55mph through the work zone. PLEASE BE COURTEOUS AND USE ZIPPER MERGE TO REDUCE CONGESTION AND DELAYS. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-03-25 08:01:21.0
Update Date: 2020-09-28 08:20:00.899
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound from mile marker 4, 4 miles east of Arizona state line to mile marker 5, Manuelito.
Description: Roadwork~~~Roadwork on I-40 from mile marker 4-5 (Manuelito). East and westbound traffic will be reduced to one lane. Eastbound traffic will be diverted onto the westbound passing lane via median crossover. There is a 12' width restriction in place. Speed reduced to 55 mph through the work zone. PLEASE USE ZIPPER MERGE AND BE COURTEOUS TO REDUCE DELAYS. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-01-22 09:04:04.0
Update Date: 2020-09-28 08:20:00.899
Expiration Date: unknown
Title: Alert, NM 456 from mile marker 0 Folsom to mile marker 55.
Description: Alert -- 12 miles are unpaved along this roadway -- impassable during inclement weather proceed at your own risk.~~~NM 456 from mile marker 0 (Folsom) to mile marker 55 may become impassable during inclement weather which is potential for significant and hazardous travel. 12 miles are unpaved along this roadway, Please proceed at your own risk.
Post Date: 2018-11-21 11:15:38.0
Update Date: 2020-05-26 11:41:40.0
Expiration Date: unknown
Title: Roadwork, NM 53 from mile marker 41 Mountain View to mile marker 46 El Morro.
Description: Roadwork~~~NM 53 will be reduced to one lane in both directions from mile marker 41-46.5 (El Morro area) due to road maintenance work. All work will be performed daily from 7am to 6pm, ending on 10/17/2020. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change. **This event will expire on 10/17/2020 at 5:30 pm.
Post Date: 2020-09-16 12:04:53.0
Update Date: 2020-09-28 08:20:00.899
Expiration Date: 2020-10-16 17:30:00.0
Title: Roadwork, I 40 from mile marker 313, 15 miles west of Tucumcari to mile marker 318, 10 miles west of Tucumcari. and right shoulder
Description: Roadwork~~~I-40 eastbound and westbound from mile marker 313, 15 miles west of Tucumcari to mile marker 318, 10 miles west of Tucumcari. The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Pavement rehabilitation is being performed, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed to 55 MPH and obey all posted traffic signs.
Post Date: 2020-07-15 09:01:58.0
Update Date: 2020-09-22 08:45:59.0
Expiration Date: unknown
Title: Roadwork, NM 38 from mile marker 17 to mile marker 19.
Description: Roadwork~~~NM 38 from mile marker 12 to mile marker 19.The New Mexico Department of Transportation will have maintenance personnel and equipment on the roadway.Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-08-12 09:43:43.0
Update Date: 2020-08-12 09:43:43.0
Expiration Date: unknown
Title: Lane Closure, NM 14 northbound and southbound from mile marker 28 to mile marker 15.
Description: Lane Closure~~~One lane will be closed for a repaving project from MM 28 (just south of Madrid) to MM 14.3 (at Puertecito Road). A pilot car will be on hand to escort travelers through the road work zone. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Work is expected to be to be completed by September 30, 2020.
Post Date: 2020-08-12 07:29:55.0
Update Date: 2020-08-12 07:29:55.0
Expiration Date: unknown
Title: Alert, NM 120 from mile marker 0 Black Lake to mile marker 12.
Description: Alert~~~NM 120 from mile marker 0 (Black Lake) to mile marker 12 may become impassable during inclement weather which is potential for significant and hazardous travel. Please proceed at your own risk.
Post Date: 2020-09-09 06:36:49.0
Update Date: 2020-09-09 06:36:49.0
Expiration Date: unknown
Title: Roadwork, NM 279 from mile marker 2 to mile marker 13.
Description: Roadwork~~~NM 279 will be reduced to one lane in both directions from mile marker 2.1 to 13 (Bibo area) due to road maintenance work. All work will be performed daily from 7 am to 7 pm, ending on 10/1/2020. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change. ***This event will expire 10/01/2020 at 7:00 pm.***
Post Date: 2020-09-02 09:34:31.0
Update Date: 2020-09-28 08:20:00.899
Expiration Date: 2020-10-01 19:00:00.0
Title: Roadwork, NM 451 from mile marker 0 to mile marker 3.
Description: Roadwork~~~NM 451 from mile marker 0 to mile marker 3. The New Mexico Department of Transportation will have maintenance personnel and equipment on the roadway. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-09-29 08:58:46.0
Update Date: 2020-09-29 08:58:46.0
Expiration Date: unknown
Title: Roadwork, NM 55 northbound and southbound from mile marker 62 Mountainair to mile marker 83.
Description: Roadwork~~~Chip sealing operations in progress. Starting on 8/25/2020 there will be a 3-mile segment reduced to one lane along this route. A pilot car will be used to escort travelers through the work zone. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2020-08-25 08:46:53.0
Update Date: 2020-08-25 08:46:53.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 237 to mile marker 253.
Description: Roadwork~~~Repaving project in progress starting August 25th, 2020. Work will be ongoing from Monday thru Saturday, from 7:00 AM to 6:00 PM and is expected to be completed within 2 months. THERE IS A 12' WIDTH RESTRICTION DURING WORKING HOURS. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2020-08-25 07:47:34.0
Update Date: 2020-08-27 11:31:55.0
Expiration Date: unknown
Title: Roadwork, US 491 from mile marker 32 Buffalo Springs to mile marker 37.
Description: Roadwork~~~Roadwork on US 491, mile marker 32-37 (from Buffalo Springs to Naschitti). Traffic reduced to one lane in both directions. There is an 11' width restriction in place. Please plan accordingly to avoid delays. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-03-17 10:46:27.0
Update Date: 2020-09-28 08:20:00.899
Expiration Date: unknown
Title: Roadwork, NM 68 northbound and southbound from mile marker 6 to mile marker 10.
Description: Roadwork~~~One lane will be closed for roadwork in each direction from 7:00 AM to 7:00 PM, Monday through Friday. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2020-09-15 10:02:28.0
Expiration Date: unknown
Title: Roadwork, NM 96 eastbound and westbound from mile marker 31 Arroyo del Agua to mile marker 32.
Description: Roadwork~~~One lane closed for bridge and road repairs. A pilot car is on hand to guide travelers through the construction zone. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 09:53:24.0
Update Date: 2020-09-15 09:53:24.0
Expiration Date: unknown
Title: Alert, NM 124 from mile marker 0 to mile marker 8.
Description: Alert~~~NM 124 HAS A PERMANENT HEIGHT RESTRICTION IN PLACE. All CMV's and high profile vehicles are PROHIBITED on NM 124, from mile marker 0-8 (from Skyway at Exit 89 to McCartys at Exit 96) due to a low 13' clearance of a concrete box culvert and no turn-around space. This event will be updated as conditions change.
Post Date: 2020-01-14 15:29:13.0
Update Date: 2020-09-28 08:20:00.899
Expiration Date: unknown
Title: Construction Closure, NM 502 from mile marker 1 Los Alamos to mile marker 2.
Description: Construction Closure~~~NM 502 (Trinity Drive) is open with one lane in each direction from Tewa Loop to DP Road. Access to Central Avenue and 4th Street from NM 502 will be closed for construction of the roundabout. Central Avenue and 4th Street can still be accessed via Knecht Street.
Post Date: 2020-06-09 10:24:20.0
Update Date: 2020-08-05 08:36:48.0
Expiration Date: unknown
Title: Alert, US 70 at mile marker 184.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: Tue Jul 07 08:59:37 MDT 2020
Update Date: 2020-09-28 10:43:36.0
Expiration Date: unknown
Title: Lane Closure, I 40 from mile marker 115, 30 miles east of Grants to mile marker 126, NM 6 to Los Lunas/Belen Interchange.
Description: Lane Closure~~~East and westbound I-40 will be reduced to one lane in each direction at various locations from mile marker 115-126 (Laguna to Exit 126 to Los Lunas) due to guardrail work . There is a 12’ width restriction in place All work will be performed Monday through Friday 7am-6pm. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-09-01 09:18:42.0
Update Date: 2020-09-28 08:20:00.899
Expiration Date: unknown
Title: Roadwork, US 180 from mile marker 121 Santa Clara to mile marker 122.
Description: Roadwork~~~James Hamilton Construction Company (Contractor) has begun the installation of the pedestrian trail to included lighting, signage and crosswalk. US 180 will have a lane closures on the eastbound and westbound right driving lanes with a reduced speed to 35 mph; traffic control will be in place for the safety of our construction workers. Contractor hours of operation will be Monday through Friday from 7:00 a.m. till 5:00 p.m. This project is estimated to be completed by the end of November 2020.
Post Date: 2020-07-30 10:56:22.0
Update Date: 2020-09-30 08:04:21.52
Expiration Date: unknown
Title: Construction Closure, I 10 at mile marker 49, (NM 146/HACHITA). Roadway closed.
Description: Construction Closure~~~Kimo Constructors, Inc. (Contractor) will be continuing bridge replacement and roadway reconstruction on NM 146 “Hatchita Bridge” at I-10 milepost 49. The Bridge is CLOSED; detour will be in place on the frontage road, Separ exit 42 and frontage road, Quincy exit 55. Traffic has been switched into the eastbound lanes as bridge construction begins. An 11 foot width restriction will be in place. Contractor’s hours of operation will be from 7:00 am to 5:00 pm Monday to Friday; lane closures and traffic control shall remain in place 24 hours a day 7 days a week.
Post Date: 2020-07-30 08:35:57.0
Update Date: 2020-09-30 08:04:21.52
Expiration Date: unknown
Title: Roadwork, US 70 at mile marker 229 Alamorosa.
Description: Roadwork~~~Construction is underway between MP 228 to MP 229 in Tularosa on US 70. Construction will consist of roadway Rehabilitation, and Signalization. Traffic is down to one lane in this area.The Speed Limit is reduced to 35 MPH with DOUBLE FINE ZONE applying to the Construction Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in the Spring of 2020. NMDOT Project Office 575-840-3566; Aaron Clark NMDOT Project Manager 575-626-9817; Dan Lurtsema Mesa Verde Project Manager 575-491-3048
Post Date: 2019-09-26 13:54:29.0
Update Date: 2020-08-12 11:59:23.0
Expiration Date: unknown
Title: Construction Closure, NM 14 at mile marker 5.
Description: Construction Closure~~~NM 14 NB & SB milepost 4 to 5.5 (Project A301445) Thru October 2020, motorists can anticipate northbound and southbound lane and shoulder restrictions. Pedestrian trail on east shoulder will also be under construction. Work is being performed for highway and trail maintenance. Expect Delays Contractor: Albuquerque Asphalt NMDOT Project Manager: Jeremy Maestas
Post Date: 2020-07-23 16:38:05.0
Update Date: 2020-09-25 14:35:00.0
Expiration Date: 2020-10-02 23:45:00.0
Title: Construction Closure, NM 6 at mile marker 27.
Description: Construction Closure~~~NM 6 EB & WB milepost 27.8 (Project A301555R) Thru December 2020, motorists can anticipate daily shoulder and lane restrictions. Motorists will be controlled through flagging operations. Work is being performed for highway bridge maintenance. Expect Delays Contractor: AUI Inc NMDOT Project Manager: Manuel Ramirez
Post Date: 2020-07-23 16:36:54.0
Update Date: 2020-09-25 14:33:11.0
Expiration Date: 2020-10-02 23:45:00.0
Title: Construction Closure, NM 6 at mile marker 35 Los Lunas.
Description: Construction Closure~~~NM 6 EB & WB milepost 35.2 at River Bridge (Project A300423) Thru the summer of 2021, motorists can anticipate westbound and eastbound lane and shoulder restrictions to enable construction. Work is being performed for a New Bridge spanning the Rio Grande River. Expect Delays Contractor: FNF Construction NMDOT Project Manager: Manuel Ramirez
Post Date: 2020-07-23 16:35:53.0
Update Date: 2020-09-25 14:33:50.0
Expiration Date: 2020-10-02 23:45:00.0
Title: Closure, NM 118 at mile marker 5 Manuelito.
Description: Closure~~~NM 118 is closed in both directions from mile marker 4 - 5 (Manuelito) due to falling rocks/boulders. Use I 40 as an alternate route. This event will be updated as conditions change
Post Date: 2020-03-19 15:23:37.0
Update Date: 2020-09-28 08:20:00.899
Expiration Date: unknown
Title: US 285 from mile marker 16 @ Malaga to mile marker 18
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Willie McCray Jr. (575) 626-9882.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2020-09-10 13:15:38.0
Expiration Date: unknown
Title: US 285 northbound and southbound from mile marker 0 to mile marker 8
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Willie McCray Jr. (575) 626-9882.
Post Date: 2020-08-13 14:51:47.0
Update Date: 2020-09-10 13:15:36.0
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 170 to mile marker 172.
Description: Roadwork~~~ADA construction is underway in Lovington between MP 170.713 and 171.374 for work on the sidewalks and turnouts. Traveling public should expect delays. Please proceed with caution, obey all posted signs, and be on the watch for construction crews and equipment. The Speed Limit through the work zone will be reduced to 35 MPH. There is a width restriction of eleven feet (11’) in place. This project is 400 working days with the expected completion date in July 2020. Contractor: Constructors, Inc., Superintendent-Dave Sampson (623) 249-0070. Traffic Control Supervisor-Don Foreman (575) 706-0325. NMDOT Project Manager-Patrick Lopez (575) 626-9872, ETSII-John Lara (575) 575-9625. Emergency Contact List for Lovington 2103100 Constructors Inc. Project Manager- Gabriel Ortega (575) 496-9397 Superintendent- Dave Sampson (623) 249-0070 Traffic Control Supervisor- Don Foreman (575) 706-0325 Project Safety Office- Tami Mandel (505) 697-1787- Project RRO Officer- Kelly Hicks (575) 302-8408- NMDOT Patrick Lopez (575) 626-9872 John Lara (575) 840-9625
Post Date: 2019-11-07 09:36:10.0
Update Date: 2020-09-28 06:41:25.186
Expiration Date: unknown
Title: Roadwork, NM 4 from mile marker 18 to mile marker 19.
Description: Roadwork~~~NM 4 is reduced to one lane in both directions from mile marker 18.5-19 (Jemez Springs) due to bridge construction. Traffic lights will guide traffic through the work zone. Expect minor delays. 11' width restriction in place. Speed reduced to 25mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-09-03 10:04:38.0
Update Date: 2020-09-28 08:20:00.899
Expiration Date: unknown
Title: Lane Closure, I 40 from mile marker 18, Gallup to mile marker 37, Iyanbito.
Description: Lane Closure~~~Eastbound and westbound I-40 will be reduced to one lane at various locations from mile marker 18-37 (from Gallup to Iyanbito) due to guardrail work. Speed is reduced to 55mph through the work zone. There is a 12' width restriction in place. All work will be performed Monday-Friday 7am-7pm until work is complete. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-09-03 09:58:27.0
Update Date: 2020-09-28 08:20:00.899
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 107 Artesia to mile marker 139. , right shoulder, and left shoulder
Description: Roadwork~~~Roadwork~~Roadway Construction is underway East of Artesia on US 82 between MP 107.65 to MP 139.07. Motorists can expect a one lane closure with pilot car between MP 114 and MP 120 for work on drainage structures and utilities; from MP 123 to MP 132 for earthwork operations; Utility work on the shoulder between MP 117 and MP 130. Motorists should expect delays-one lane of traffic controlled by pilot car during the day. Junction of NM 529 and US 82 Construction re-alignment posted speeds are 35 throughout this intersection. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Speed Limit through the Work Zones will be REDUCED to 35 MPH. The Maximum Posted Speed Limit during construction will be 55 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 540 working days. Expected completion date is to be determined at a future date. Contractor has returned from winter suspension. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Randy Lueras (575) 626-8938.
Post Date: 2020-01-02 12:39:45.0
Update Date: 2020-09-28 06:41:25.186
Expiration Date: unknown
Title: Crash, I 40 eastbound at mile marker 316, 12 miles west of Tucumcari. Roadway closed.
Description: Crash~~~I 40 eastbound at mile marker 316, 12 miles west of Tucumcari. Roadway closed due to a crash. Expect delays, this event will be updated as conditions change.
Post Date: 2020-10-01 04:02:34.0
Update Date: 2020-10-01 04:02:34.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 55 to mile marker 62. Right lane closed.
Description: Roadwork~~~Guardrail replacement is underway between mm 55 and 62 between Omlee and Valmont on US 54. This is a safety improvement project consisting of guardrail upgrades. Motorists should expect a right lane closure in the Northbound lane during the entirety of the project. The Speed Limit is reduced to 45 MPH with DOUBLE FINE ZONE applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in August of 2020. Arron Clark NMDOT Project Manager 575-626-9817; Contractor Villalobos Construction Co. Inc. 575-993-3930; Traffic Control Supervisor Marvin Clements 575-993-3931.
Post Date: 2019-08-01 16:06:56.0
Update Date: 2020-03-26 07:40:38.0
Expiration Date: unknown
Title: Closure, NM 456 at mile marker 44. Roadway closed.
Description: Closure~~~NM 456 at mile marker 44. Roadway closed due to severe flooding. No Detour available, seek alternate route. This event will be updated as conditions change.
Post Date: 2020-08-29 23:56:04.0
Update Date: 2020-08-29 23:56:04.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 44, 19 miles east of Lordsburg to mile marker 55, (QUINCY).
Description: Roadwork~~~Mountain States Construction, Inc. (Contractor) has begun a pavement preservation project on I-10 from milepost 44 to milepost 55 (Quincy). Traffic can expect various daytime lane closures on the westbound lanes as well as overnight lane closures as needed. Contractor’s hours of operation will be from 6:00 am to 6:00 pm Monday through Friday. Construction is expected to be completed fall of 2020.
Post Date: 2020-07-27 08:05:21.0
Update Date: 2020-09-30 08:04:21.52
Expiration Date: unknown
Title: US 60 eastbound and westbound from mile marker 385 to mile marker 387
Description: Roadway Rehabilitation, Signalization, and Lighting project on US 60/84 from MP 385.500 to MP 386.560. All lanes are open to traffic however there is work remaining to be done on the project that may require lane closures. When lane closures are in place a 12ft width restriction is in effect and traffic will be reduced to 25 MPH. Wide and Oversized Loads please seek alternate route and expect delays when lanes are closed. Please be aware of personal/equipment in the roadway and follow posted signs. Expected Completion Fall of 2020. Contractor: K Barnett & Sons Superintendent Deole Hill (575)749-8093 NMDOT: Project Manager Thomas McAlister (575)840-8853
Post Date: 2020-01-27 16:22:02.0
Update Date: 2020-09-24 10:58:53.0
Expiration Date: unknown
Title: New Mexico 108 southbound and westbound from mile marker 7 to mile marker 18
Description: Bridge Replacement and Roadway Reconstruction NM 108 on Bridges located at MP 7.64 and MP 18.168. Bridge at MP 18.168 both lanes are open to traffic. However, traffic will be restricted to one 12ft drive lane when remaining work is being performed. Speed Limit also reduced to 35 MPH. Bridge at MP 7.64 will be closed to all traffic during construction. Please follow posted detour route and expect delays. Please be aware of personal and equipment near/around the work zone and follow posted construction signs. Work on bridges is expected to be completed in December 2020. Contractor: EL Terrero Construction Superintendent Matt Villalobos (505)896-3864 Traffic Control Supervisor Mark Martinez (505)796-2674 NMDOT: Project Manager Thomas McAlister (575)840-8853
Post Date: 2020-01-27 15:57:03.0
Update Date: 2020-09-24 10:58:18.0
Expiration Date: unknown
Title: Alert, NM 513 at mile marker 0.
Description: Alert~~~Closure The New Mexico Department of Health (NMDOH) has detected community spread in the state. Salinas National Park is CLOSED DUE TO COVID-19.
Post Date: 2020-03-23 13:40:40.0
Update Date: 2020-03-23 13:40:40.0
Expiration Date: unknown
Title: Roadwork, NM 26 from mile marker 47 to mile marker 45.
Description: Roadwork~~~Hasse Contacting Company, Inc. (Contractor) will continue roadway improvement project along NM 26 in Hatch. Road Improvements will begin with the replacement and upgrade of sidewalk, curb and gutter and ramps to include ADA (Americans with Disabilities Act) accommodations. Sidewalks will be detoured in areas for construction and the safety of the public. Contractor has also began paving along NM 26, watch for heavy equipment on roadway, reduce speeds, lane closures and flagging operations. Contractor hours will be Monday through Friday from 7:00 am until 5:00 pm daily.
Post Date: 2020-03-16 09:19:39.0
Update Date: 2020-09-30 08:04:21.52
Expiration Date: unknown
Title: Roadwork, I 10 at mile marker 50, 25 miles east of Lordsburg.
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will be continuing bridge replacement and roadway reconstruction on NM 146 “Hatchita Bridge” at I-10 milepost 49. The Bridge is CLOSED; detour will be in place on the frontage road, Separ exit 42 and frontage road, Quincy exit 55. Traffic has been switched into the westbound lanes as bridge construction begins. An 11 foot width restriction will be in place. Contractor’s hours of operation will be from 7:00 am to 5:00 pm Monday to Friday; lane closures and traffic control shall remain in place 24 hours a day 7 days a week.
Post Date: 2020-03-16 09:16:45.0
Update Date: 2020-09-30 08:04:21.52
Expiration Date: unknown
Title: Closure, Closure
Description: Closure~~~SANTO DOMINGO PUEBLO WILL BE CLOSED FOR EVERYONE WHO IS NOT RESIDENTIAL. Be advised the ONLY entrance open to residents, which will be monitored by law enforcement. (ONLY TRIBAL RESIDENTS). Safety precautions during the COVID-19
Post Date: 2020-04-13 16:26:37.0
Update Date: 2020-04-13 16:26:37.0
Expiration Date: unknown
Title: Roadwork, NM 68 southbound from mile marker 44 to mile marker 43.
Description: Roadwork~~~ROADWORK IN THE SOUTHBOUND LANE WILL TRANSITION INTO TURNING LANE
Post Date: 2020-04-13 07:53:05.0
Update Date: 2020-04-13 07:53:05.0
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 269, La Bajada to mile marker 277, 1 mile south of Santa Fe.
Description: Roadwork~~~Through November 13, 2020, I-25 northbound and southbound from La Bajada to just South of Cerrillos road will have intermittent lane closures for a Mill and Overlay project. Two Lanes of traffic will be open on I-25 northbound between the hours of 7:00 AM to 9:00 AM and southbound between the hours of 4:00-6:00 pm to accommodate peak commute times. Contractor: Albuquerque Asphalt Project Manager: Jared Rodriguez
Post Date: 2020-03-09 10:32:23.0
Update Date: 2020-03-09 10:32:23.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 458, 3 miles south of CO to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~I-25 northbound and southbound from mile marker 458, 3 miles south of CO to mile marker 460, (RATON PASS/PORT OF ENTRY). The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-07-06 15:04:02.0
Update Date: 2020-08-31 09:19:10.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 299, 23 miles east of Santa Rosa to mile marker 308, 20 miles west of Tucumcari. Left lane and left shoulder closed.
Description: Roadwork~~~I-40 eastbound from mile marker 299, 23 miles east of Santa Rosa to mile marker 308, 20 miles west of Tucumcari. Left lane and left shoulder closed. Pavement rehabilitation is being performed, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. (Mountain States)
Post Date: 2020-07-06 14:14:53.0
Update Date: 2020-09-22 08:44:59.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~US 54 from mile marker 302 to mile marker 304. The New Mexico Department of Transportation - District Four will have road construction on U.S. 54 between mile posts 302 to 304 (Tucumcari Interchange) starting on April 6th. Please drive with caution, reduce speed and obey all posted traffic signs. The traveling public is advised to expect minor delays.
Post Date: 2020-04-06 08:59:14.0
Update Date: 2020-09-22 08:43:08.0
Expiration Date: unknown
Title: Closure, NM 526 at mile marker 6. Roadway closed.
Description: Closure~~~NM 526 at mile marker 6. Roadway closed. Roadway closed due to fire danger. NO DETOUR AVAILABLE. SEEK ALTERNATE ROUTE. This event will be updated as conditions change.
Post Date: 2020-08-28 13:24:56.0
Update Date: 2020-08-31 17:19:51.0
Expiration Date: unknown
Title: Construction Closure, NM 187 from mile marker 15 to mile marker 16.
Description: Construction Closure~~~Hasse Contacting Company, Inc. (Contractor) has begun the replacement of Bridges located in Arrey. The first bridge is located at milepost 15.4 near the Caballo Dairy; the second bridge is located at milepost 16.09 near Agua Fria Road over the Montoya Arroyo. Both bridges have a detoured bypass at their locations; a 12 foot width restriction will be in place. Contractor’s hours of operation will be from 7:00 am to 5:00 pm Monday to Friday; lane closures and traffic control shall remain in place 24 hours a day 7 days a week.
Post Date: 2020-03-27 15:21:04.0
Update Date: 2020-09-30 08:04:21.52
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Construction Closure, Construction Closure
Description: Construction Closure~~~I-25 SB Frontage (Locust) at Central September 30, thru October 2 the motorists can anticipate the SB frontage road at Central Ave will be fully closed. Traffic will be detoured. Work is being performed for asphalt repair and maintenance. Expect Delays Contractor: Star Paving NMDOT Project Manager: Barry Lytle
Post Date: 2020-09-25 14:40:40.0
Update Date: 2020-09-25 14:40:40.0
Expiration Date: 2020-10-02 23:45:00.0
Title: Alert, I 40 westbound at mile marker 179, Los Pinos.
Description: Alert~~~I-40 WB at milepost 179 (Price Agreement Work) ALERT---October 3 thru October 4 motorists can anticipate lane and shoulder restrictions from 7:00 AM to 10 PM daily. Work is being performed for concrete repair and maintenance. Expect Delays Contractor: Hasse Construction NMDOT Project Manager: Richard Jaramillo
Post Date: 2020-09-25 14:38:43.0
Update Date: 2020-09-25 14:38:43.0
Expiration Date: 2020-10-04 23:45:00.0
Title: Construction Closure, NM 47 at mile marker 36.
Description: Construction Closure~~~NM 47 milepost 35 to 37 (Project A300511 Isleta Pueblo) August 23, 2020 thru March, 2021 from 7 AM to 7 PM motorists can anticipate continuous lane and shoulders restrictions. Work is being performed for highway improvements and widening. Expect Delays Contractor: Star Paving Project Management: Isleta Pueblo
Post Date: 2020-08-21 13:23:33.0
Update Date: 2020-09-25 14:34:10.0
Expiration Date: 2020-10-02 23:45:00.0
Title: Roadwork, US 180 eastbound and westbound from mile marker 115 to mile marker 120.
Description: Roadwork~~~Hasse Contracting Co., (Contractor) will have a lane closures in effect on US 180 on both eastbound and westbound lanes for road repairs in Grant County. The speed limit will be reduced for the safety of the crew. Hours of operation will be from 7:00 a.m. until 5:00 p.m. Project is expected to be completed by early 2021.
Post Date: 2020-09-18 12:33:13.0
Update Date: 2020-09-30 08:04:21.52
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 59, (CABALLO LAKE) to mile marker 72, 6 miles south of T or C.
Description: Roadwork~~~J-H Supply, Inc. (Contractor) will begin replacing the guardrail and end treatments along I-25 in Sierra County. Traffic can expect lane closures in the northbound and southbound driving right lane and shoulder as the contractor is performing these safety improvements. Overnight lanes closures can be expected. Hours of operation will be from 7:00 am to 5:00 pm, Monday through Friday. Construction is expected to be completed by winter 2020.
Post Date: 2020-09-18 12:32:09.0
Update Date: 2020-09-30 08:04:21.52
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 68 to mile marker 70.
Description: Roadwork~~~Project on US 285 between MP 68.1 to 70.4 - Richey to Hermosa Street. Expect one lane closures throughout the ADA project on both the south bound and north bound lanes. There will be a detour at the intersection of Hermosa and US 285 once the installation of the new traffic signal begins. CONTACT INFORMATION: Project Manager - Gabe Ortega 575-496-9397 Traffic Control Supervisor - James Atkinson 575-937-4667 NMDOT Project Manager - Donna Gililland 575-626-4857
Post Date: 2020-01-17 11:10:49.0
Update Date: 2020-09-24 10:59:55.0
Expiration Date: unknown
Title: Lane Closure, NM 169 from mile marker 0 to mile marker 35.
Description: Lane Closure~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing” with Brooming operations in Socorro Co. near Magdalena. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2020-08-14 13:49:23.0
Update Date: 2020-09-30 08:04:21.52
Expiration Date: unknown
Title: Roadwork, NM 349 at mile marker 5.
Description: Roadwork~~~NMDOT crews will begin replacing a box culvert beginning July 20th, 2020 on NM 349 at mm 5.8 (White Oaks Hwy). Motorists should expect a one lane detour with intermittent lane closures. Expect some delays in this area. Speed limit has been reduced to 25 MPH and 30 MPH within the construction zone. Please use caution, follow all signs and detours and watch for all personnel and equipment in the area. Estimated completion of this project will be 8 weeks from the starting date, weather permitting. NMDOT contact is Wade West, Carrizozo Patrol Supervisor (575) 626-7270; Jonathan Boyle, Bridge Inspector (575) 626-0178; Daniel Davis, Bridge Supervisor (575) 626-7867.
Post Date: 2020-03-13 16:01:45.0
Update Date: 2020-08-20 11:34:47.0
Expiration Date: unknown
Title: Closure, Closure
Description: Closure~~~Jemez Pueblo is CLOSED TO ALL NON-RESIDENTS due to COVID-19 precautions and orders issued by Jemez Pueblo.
Post Date: Fri Apr 10 09:58:50 MDT 2020
Update Date: 2020-09-28 08:20:14.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 324 to mile marker 326 Logan.
Description: Roadwork~~~Bridge and Roadway Construction beginning November 8th 2019 continuing through December 31st 2020. All work will be performed 7am to 5pm. Reduce Speed through the work zone. Please drive with caution and obey all posted traffic signs. This event will be updated as conditions change. Follow all posted traffic signs.
Post Date: 2019-11-08 15:55:26.0
Update Date: 2020-08-31 09:19:56.0
Expiration Date: unknown
Title: Construction Closure, I 40 at mile marker 178, (ZUZAX).
Description: Construction Closure~~~I-40 EB & WB milepost 177.5 at Zuzax (Project A301345) Thru the spring of 2022, I-40 and NM 333 at Sedillo Hill Road will have various lane and shoulder restriction. There will be intermittent full closures of I-40 for bridge replacement. Detours will be provided. Work is being performed for interstate maintenance and bridge construction. Expect Delays Contractor: AUI Inc NMDOT Project Manager: Jeremy Maestas.
Post Date: 2020-08-07 13:21:01.0
Update Date: 2020-09-25 14:34:43.0
Expiration Date: 2020-10-02 23:45:00.0
Title: Roadwork, NM 229 from mile marker 5 to mile marker 6.
Description: Roadwork~~~There will be construction of a concrete box culvert at the south side of the intersection of US. 82 and 229 Haldeman. The Intersection will be closed. Detour around using CR 59 (Bolton) or CR 58 (Vogel) to CR 57 (Hermosa). The intersection will be closed until the completion of the concrete box culvert. Contractor Contacts. Felipe Tenorio (505-249-5138), Raymond Reeves (505-373-7314). NMDOT Contacts. Ernest Lueras (575-626-8938), John Lara (575-840-9625)
Post Date: 2020-05-01 08:15:35.0
Update Date: 2020-09-28 06:41:25.186
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Fair 51°F
30.20in
Barometer
43%
Humidity
North 0.0mph
Wind
Fair

More Local Information

Bookmark and Share

Traffic Nearby

Go Ad Free - Become a Member

Columbus weather and traffic updates by locals

Write your own Columbus, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Columbus, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Columbus, NM report and/or forecast will be removed by a moderator.