Currituck Traffic and Road Conditions

 

Currituck Traffic Map

Loading Map
No Traffic Flow? Choose Live Map then Zoom in Closer
Get our app on Google Play

How to use the Currituck Traffic Map
A static map with traffic flow is shown first and to start using the interactive map you press the blue Load button above to go live.

Traffic flow lines: Red/White dashed lines = Closed Road, Grey/White dashed lines = Road Work, Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow, and Green = normal traffic. Black lines or no traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, if you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

Traffic Incidents: Each icon represents a traffic event or incident such as road construction, closure (red circle with a white dash), or accident. In some regions there may also be live traffic camaras to view.

In known extreme weather events or accidents, the map may still show green lines, even if lanes or the entire road are closed.

Currituck Traffic Alerts

74 TOL
Shoulder Closed on US-74 TOL In Wingate / Mile Marker 270 Heading West
The left shoulder is closed at Exit 270 (Austin Chaney Rd) for cable, anchor post and hook bolt repairs.
Start: November 7, 2025, 12:00 am / End:November 7, 2025, 11:00 am / Updated: November 6, 2025, 11:50 pm
74 ALT
Lane Closed on US-74 ALT (Smokey Park Highway) In Asheville / Mile Marker 0 to 0 Heading East
The left lane is closed near Acton Circle. 
Start: November 7, 2025, 1:47 am / End:November 7, 2025, 4:00 am / Updated: November 7, 2025, 2:22 am
74 ALT
Road Closed on US-74 ALT (Smokey Park Highway) In Asheville / Mile Marker 0 to 0 Heading West
The road is closed near Acton Circle. 
Start: November 7, 2025, 1:36 am / End:November 7, 2025, 4:00 am / Updated: November 7, 2025, 2:22 am
74
Shoulder Closed on US-74 In Leland / Heading East
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:23 pm
70 BUS
Road Closed with Detour on US-70 BUS (Holloway Street) In Durham / Both Directions
Water line replacement for the City of Durham.
DETOUR: Road closed with detour.
Start: November 12, 2025, 11:00 am / End:December 4, 2025, 11:00 am / Updated: November 6, 2025, 8:54 pm
64 BYP
Lane Closed on US-64 BYP Near Manns Harbor / Both Directions
A lane is closed near Shipyard Rd due to bridge maintenance.
Start: December 2, 2025, 1:00 pm / End:December 12, 2025, 9:30 pm / Updated: November 5, 2025, 4:37 pm
52
Shoulder Closed on US-52 In Winston-Salem / Heading South
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:27 pm
421
Shoulder Closed on US-421 West of Yadkinville / Mile Marker 251 to 250 Heading South
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 6, 2025, 3:40 pm
421
Lane Closed on US-421 (Lake Park Blvd) In Carolina Beach / Mile Marker 5.7 to 7.7 Both Directions
Milling and Resurfacing
Start: October 27, 2025, 1:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 6, 2025, 7:03 pm
264 ALT
Shoulder Closed on US-264 ALT In Greenville / Heading East
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:15 pm
25 BUS
Lane Closed on US-25 BUS (North Church Street) In Hendersonville / Heading South
The left lane is closed between North Main Street and South Main Street, for paving operations. 
Start: November 3, 2025, 11:00 pm / End:November 7, 2025, 12:00 pm / Updated: November 6, 2025, 11:01 pm
23
Lane Closed on US-23 (Smokey Park Highway) In Asheville / Mile Marker 0 to 0 Heading North
The left lane is closed near Acton Circle. 
Start: November 7, 2025, 1:47 am / End:November 7, 2025, 4:00 am / Updated: November 7, 2025, 2:22 am
23
Road Closed on US-23 (Smokey Park Highway) In Asheville / Mile Marker 0 to 0 Heading South
The road is closed near Acton Circle. 
Start: November 7, 2025, 1:36 am / End:November 7, 2025, 4:00 am / Updated: November 7, 2025, 2:22 am
19
Lane Closed on US-19 (Smokey Park Highway) In Asheville / Heading North
The left lane is closed near Acton Circle. 
Start: November 7, 2025, 1:47 am / End:November 7, 2025, 4:00 am / Updated: November 7, 2025, 2:22 am
19
Road Closed on US-19 (Smokey Park Highway) In Asheville / Heading South
The road is closed near Acton Circle. 
Start: November 7, 2025, 1:36 am / End:November 7, 2025, 4:00 am / Updated: November 7, 2025, 2:22 am
17
Shoulder Closed on US-17 Near Leland / Heading West
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:25 pm
158
Shoulder Closed on US-158 North West of Kernersville / Heading West
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:46 pm
13
Shoulder Closed on US-13 In Greenville / Heading East
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:18 pm
13
Lane Closed on US-13 (Berkeley Boulvard) In Goldsboro / Both Directions
Contractor will begin placing the final pavement layer on Royall Ave, Central Heights Blvd, Fallin Blvd, and Oak Forest rd. Contractor will use a combination of lane closures and flagging at the intersections.  Work will be from Monday 11.10.2025 to Friday 11.14.2025 from 7:00 am until 5:00 pm.  Contractor will begin mill and fill paving operation on Berkeley Blvd from US 70 to Lisa Ln starting Monday 11.17.2025 to Friday 11.21.2025 7:30 am to 5:00 pm.  Contractor will use a combination of lane closures and flagging at the intersections.   Seek alternate route if available
DETOUR: Contractor will begin placing the final pavement layer on Royall Ave, Central Heights Blvd, Fallin Blvd, and Oak Forest rd. Contractor will use a combination of lane closures and flagging at the intersections.  Work will be from Monday 11.10.2025 to Friday 11.14.2025 from 7:00 am until 5:00 pm.  Contractor will begin mill and fill paving operation on Berkeley Blvd from US 70 to Lisa Ln starting Monday 11.17.2025 to Friday 11.21.2025 7:30 am to 5:00 pm.  Contractor will use a combination of lane closures and flagging at the intersections.   Seek alternate route if available
Start: November 10, 2025, 12:00 pm / End:November 21, 2025, 10:00 pm / Updated: November 6, 2025, 1:39 pm
1
Lane Closed on US-1 Near Apex / Mile Marker 93 Heading South
The left lane is closed for cutting the high shoulder at Exit 93 (NC-540). 
Start: November 7, 2025, 12:15 am / End:November 7, 2025, 11:00 am / Updated: November 6, 2025, 11:17 pm
9999
Lane Closed on SR-9999 (Danny Brook Rd) Near Fuquay-Varina / Heading North
The right lane is closed at Chandler Ridge Cir.
Start: November 6, 2025, 2:00 pm / End:November 7, 2025, 9:00 pm / Updated: November 6, 2025, 6:39 pm
9999
Lane Closed on SR-9999 (N Oak Forest Rd) Near Goldsboro / Both Directions
A lane is closed near Central Heights Rd, due to road maintenance.
Start: November 5, 2025, 2:00 pm / End:November 7, 2025, 9:30 pm / Updated: November 5, 2025, 2:34 pm
4000
Congestion on SR-4000 (University Parkway) Near Winston-Salem / Both Directions
The Lawrence Joel Veterans Memorial Coliseum will be hosting multiple events which is expected to increase traffic volumes on the roadways surrounding the coliseum. In anticipation of increased traffic volumes, LJVM Coliseum staff, Winston-Salem DOT, and the Winston-Salem Police Department will be managing major intersections in the vicinity of the coliseum.  Expect higher traffic volumes around Winston-Salem on US 52 North and South, I-40 East and West, I-40 Business East and West, University Parkway, and Akron Drive in both directions and other surrounding roadways. Patrons attending the event are encouraged to arrive early and carpooling is strongly advised.
Start: November 7, 2025, 10:00 pm / End:November 8, 2025, 1:00 am / Updated: November 5, 2025, 7:48 pm
1929
Road Closed on SR-1929 (West Rd) South of Turkey / Both Directions
Pipe replacement. 
Start: November 17, 2025, 1:00 pm / End:November 18, 2025, 10:00 pm / Updated: November 6, 2025, 6:28 pm
1725
Lanes Closed on SR-1725 (N Cherry Street) In Winston-Salem / Heading North
Weather permitting, the contractor will close N Cherry Street (NB) from the split at University Pkwy to Reynolds Blvd. The closure/detour will be installed to safely perform required utility work (water line tie-in) in the right-of-way as part of the Wake Forest University Offsite Roadway Improvements project.  
DETOUR: Weather permitting, the contractor will close N Cherry Street (NB) from the split at University Pkwy to Reynolds Blvd. The closure/detour will be installed to safely perform required utility work (water line tie-in) in the right-of-way as part of the Wake Forest University Offsite Roadway Improvements project. Traffic traveling northbound on University Pkwy advised to proceed with caution, follow traffic control devices and roadway signs. Work is scheduled to start on Monday, 11/10 to be completed NLT 11/14. Daily 9am to 4pm.  
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 6, 2025, 3:48 pm
1709
Lane Closed on SR-1709 (Central Heights Rd) In Goldsboro / Both Directions
A lane is closed between Hilda Pl and US 13 for road widening project.
Start: November 5, 2025, 2:31 pm / End:November 7, 2025, 9:00 pm / Updated: November 5, 2025, 2:38 pm
1605
Road Closed on SR-1605 (Old 421 East) Near East Bend / Both Directions
Old 421 East will be closed intermittently between 9:00 AM and 11:30 near address 4529 in order to remove hazardous trees leaning over the road.
Start: November 7, 2025, 2:00 pm / End:November 7, 2025, 4:30 pm / Updated: November 6, 2025, 4:34 pm
1603
Road Closed with Detour on SR-1603 (N. Old Carriage Rd) Near Red Oak / Both Directions
Road closed for culvert replacement between the intersection with Red oak Blvd and the address of 4459 N. Old Carriage Rd
DETOUR: SR 1603 (N. Old Carriage Rd) - SR 1604 (Hunter Hill Rd) - SR 1003 (Red Oak Rd) - NC 43 (Red Oak Blvd) - SR 1603 (N. Old Carriage Rd)
Start: November 5, 2025, 7:45 pm / End:November 7, 2025, 10:00 pm / Updated: November 5, 2025, 7:44 pm
1570
Road Closed on SR-1570 (Nebo Road) Near Boonville / Both Directions
Nebo Road will be intermittently closed near address 2640 just south of St John Road between 10:30 AM and 2:30 PM on Friday in order to remove hazardous trees leaning over the road.
Start: November 7, 2025, 3:30 pm / End:November 7, 2025, 7:30 pm / Updated: November 6, 2025, 4:38 pm
1353
Lane Closed on SR-1353 (S Big Horse Creek Rd) North of Lansing / Heading North
S Big Horse Creek Rd (SR 1353), just north of E Little Horse Creek Rd, will have the NB Lane Closed from Monday, September 8th to Friday, November 28th between 8AM - 5PM each weekday. Traffic will be controlled by automated flaggers in order to construct a Gravity Wall to stabilize the Slope.
Start: September 8, 2025, 12:33 pm / End:November 28, 2025, 10:00 pm / Updated: November 6, 2025, 6:46 pm
1335
Road Closed with Detour on SR-1335 (Willow Green Rd.) North East of Snow Hill / Both Directions
Pipe replacement
DETOUR: Follow posted detour.
Start: November 17, 2025, 1:00 pm / End:November 21, 2025, 10:00 pm / Updated: November 6, 2025, 6:11 pm
1195
Road Closed with Detour on SR-1195 (W Industry Drive) In Oxford / Both Directions
Norfolk Southern repairing asphalt at crossing
Start: November 12, 2025, 1:00 pm / End:November 13, 2025, 1:00 pm / Updated: November 6, 2025, 6:04 pm
1134
Road Closed with Detour on SR-1134 (Dimmocks Mill Road) In Hillsborough / Both Directions
Road closure needed for bridge rehabilitation work.
DETOUR: Dimmocks Mill Road will be closed for three weeks for bridge rehabilitation work. A signed detour will be provided to direct motorists around the closure by using New Grady Brown School Road, Orange Grove Road, and Eno Mountain Road.
Start: October 2, 2025, 3:00 am / End:November 20, 2025, 4:00 am / Updated: November 5, 2025, 4:21 pm
1118
Shoulder Closed on SR-1118 (Fayetteville Rd) South of Durham / Heading North
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 4:36 pm
1105
Shoulder Closed on SR-1105 (Herndon Dr) South of Durham / Heading North
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 4:40 pm
1003
Road Closed on SR-1003 (Silver Spoon Road) East of Western Prong / Both Directions
Road Closed due to the replacement of a crossline pipe under the roadway.
Start: November 10, 2025, 1:00 pm / End:November 14, 2025, 10:30 pm / Updated: November 6, 2025, 8:19 pm
74
Shoulder Closed on NC-74 Near Walkertown / Heading East
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:40 pm
74
Shoulder Closed on NC-74 Near Walkertown / Heading West
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:41 pm
74
Shoulder Closed on NC-74 Near Kernersville / Heading West
Logo sign maintenance
DETOUR: Logo sign maintenance and placard install for North Carolina Signing Program.
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:44 pm
58
Road Closed with Detour on NC-58 Near Nashville / Both Directions
Road closed for culvert replacement between the address of 1006 NC 58 and the intersection with Taylors Store Rd
DETOUR: NC 58 - SR 1004 (Taylors Store Rd) - SR 1431 (Corinth Rd) - SR 1426 (Sykes Rd) - NC 58
Start: November 10, 2025, 12:00 pm / End:November 14, 2025, 8:30 pm / Updated: November 6, 2025, 7:14 pm
57
Congestion on NC-57 (NC 57) South East of Milton / Both Directions
Following a North Carolina Spot Safety Investigation at the intersection of NC 57 and NC 119 in Semora, NCDOT crews and contractors will install an All-Way Stop system at this location.
DETOUR: No detour will be necessary.  Motorist will be directed through the work zone.
Start: November 17, 2025, 2:00 pm / End:November 17, 2025, 8:30 pm / Updated: November 6, 2025, 8:52 pm
540 TOL
Lane Closed on NC-540 TOL (Triangle Expressway) East of Holly Springs / Mile Marker 45 to 44.8 Heading East
The right 2 lanes are closed at Exit 45 (US 401).
Start: November 5, 2025, 12:00 pm / End:November 7, 2025, 8:00 pm / Updated: November 6, 2025, 6:20 pm
45
Road Closed with Detour on NC-45 (NC 45) Near Windsor / Both Directions
Replacement of Crossline Drainage Pipes under. NC 45
DETOUR: Starting at 6PM on Friday November 7, NC 45 will be closed to through traffic for the replacement of crossline pipes under NC 45. Work will be continuous and will be completed, and NC 45 will be reopened to through traffic no later than 6AM on Monday November 10. Through traffic will be directed onto a marked detour from NC 45, to NC 308 (Cooper Hill Rd) to San Souci Rd, back to NC 45. Local residential traffic will be allowed inside the closure from each end, up to the excavation limits.
Start: November 7, 2025, 11:00 pm / End:November 10, 2025, 11:00 am / Updated: November 6, 2025, 1:09 am
210
Lane Closed on NC-210 West of Point Caswell / Both Directions
NCDOT contractors will be stabilizing approaches and bridge banks at this location. This work is needed to ensure the continuing safety of the motoring public and to reinforce embankments at each end of the Structure in the event of high water. One lane will remain open at all times.
DETOUR: NCDOT contractors will be stabilizing approaches and bridge banks at this location. This work is needed to ensure the continuing safety of the motoring public and to reinforce embankments at each end of the Structure in the event of high water. One lane will remain open at all times.
Start: November 6, 2025, 1:00 pm / End:November 21, 2025, 10:00 pm / Updated: November 6, 2025, 1:13 pm
150
Lane Closed on NC-150 In Mooresville / Heading East
The EB Right Lane of Hwy 150 will be closed between Norman Station and Talbert Rd for a Paving Operation. Please use caution and reduce speed
Start: November 7, 2025, 1:00 am / End:November 7, 2025, 11:00 am / Updated: November 7, 2025, 12:45 am
150
Lane Closed on NC-150 In Mooresville / Heading West
The WB Right Lane of Hwy 150 will be closed between I-77 and Williamson Rd for a Utility Operation. Please use caution and reduce speed
Start: November 7, 2025, 1:30 am / End:November 7, 2025, 11:00 am / Updated: November 7, 2025, 12:50 am
11
Shoulder Closed on NC-11 Near Greenville / Heading North
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:13 pm
11
Shoulder Closed on NC-11 Near Greenville / Heading South
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:12 pm
95
Shoulder Closed on I-95 Near Smithfield / Mile Marker 93 to 92 Heading South
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 3:57 pm
95
Shoulder Closed on I-95 In Smithfield / Mile Marker 92.5 to 93 Heading North
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 3:52 pm
95
Ramp Lane Closed on I-95 Near Lumberton / Mile Marker 13 to 14 Heading North
The left lane of the off-ramp is closed at Exit 13 (I-74). 
Start: November 7, 2025, 12:18 am / End:November 7, 2025, 6:00 am / Updated: November 7, 2025, 12:25 am
95
Shoulder Closed on I-95 Near Smithfield / Mile Marker 93 to 93.2 Heading North
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 3:53 pm
95
Lane Closed on I-95 Near Benson / Mile Marker 78.5 to 80 Heading North
The right lane is closed before Exit 79 (NC 50) due restriping operations.
Start: November 7, 2025, 1:40 am / End:November 7, 2025, 12:00 pm / Updated: November 7, 2025, 1:48 am
95
Lane Closed on I-95 Near Benson / Mile Marker 80 to 78.5 Heading South
The left lane is closed before Exit 79 (NC 50) due to shoulder maintenance operations.
Start: November 7, 2025, 1:42 am / End:November 7, 2025, 12:00 pm / Updated: November 7, 2025, 1:50 am
95
Lane Closed on I-95 South of St. Pauls / Mile Marker 30.5 to 31 Heading North
The right lane is closed 1 mile before Exit 31 (NC-20/W Broad Street).
Start: November 6, 2025, 11:48 pm / End:November 7, 2025, 2:48 am / Updated: November 7, 2025, 2:19 am
95
Lane Closed on I-95 South of St. Pauls / Mile Marker 31 to 31.5 Heading North
The left lane is closed 1 mile before Exit 31 (NC-20/W Broad Street).
Start: November 6, 2025, 11:48 pm / End:November 7, 2025, 2:48 am / Updated: November 7, 2025, 2:19 am
95
Shoulder Closed on I-95 Near Smithfield / Mile Marker 94 to 93 Heading South
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 3:55 pm
85
Lanes Closed on I-85 In Whitsett / Mile Marker 136 to 138 Heading East
Overhead Sign Structure repair
Start: November 12, 2025, 1:00 am / End:November 13, 2025, 10:00 am / Updated: November 7, 2025, 1:12 am
85
Lanes Closed on I-85 Near Graham / Mile Marker 145 to 149 Heading East
Overhead Sign Replacement
Start: November 10, 2025, 1:00 am / End:November 12, 2025, 10:00 am / Updated: November 7, 2025, 1:08 am
85
Lanes Closed on I-85 West of Belmont / Mile Marker 26 to 24 Heading South
Right lane closed from 9:00PM until 5:00AM for construction on the bridge over the South Fork Catawba River.
Start: November 3, 2025, 2:00 am / End:November 10, 2025, 10:00 am / Updated: November 6, 2025, 9:11 pm
85
Shoulder Closed on I-85 Near Thomasville / Mile Marker 103 to 104 Heading North
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 6:01 pm
85
Shoulder Closed on I-85 In Thomasville / Mile Marker 102 to 103 Heading North
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 5:58 pm
85
Shoulder Closed on I-85 In Thomasville / Mile Marker 104 to 103 Heading South
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 6:02 pm
85
Lane Closed on I-85 Near Durham / Mile Marker 180 Heading North
The right lane is closed at Exit 180 (Glen School Rd) for construction. 
Start: November 7, 2025, 1:00 am / End:November 7, 2025, 10:00 am / Updated: November 7, 2025, 1:19 am
85
Shoulder Closed on I-85 Near Thomasville / Mile Marker 105 to 104 Heading South
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 6:04 pm
77 TOL
Lane Closed on I-77 TOL Near Huntersville / Mile Marker 21.4 Heading North
Crash on I-77 North Bound prior to exit 23, Gilead Rd. The right express lane as well as the left and center general purpose lanes are blocked.
Start: November 7, 2025, 1:46 am / End:November 7, 2025, 2:46 am / Updated: November 7, 2025, 1:47 am
77
Lane Closed on I-77 In Charlotte / Mile Marker 9.5 to 8.5 Heading South
The left lane is closed near Exit 9C (US-74)  for roadway and bridge inspections. 
Start: November 7, 2025, 2:00 am / End:November 7, 2025, 11:00 am / Updated: November 6, 2025, 11:27 pm
77
Lane Closed on I-77 In Charlotte / Mile Marker 8.2 to 8.6 Both Directions
The right lane is closed past Exit 8 (Remount Rd) for roadway and bridge inspections. 
Start: November 7, 2025, 2:00 am / End:November 7, 2025, 11:00 am / Updated: November 7, 2025, 12:35 am
440
Ramp Closed on I-440 In Raleigh / Mile Marker 3 Heading East
Ramp closure to help establish the new collector distributor lanes for I-440 EB.
DETOUR: Detour from Hillsborough Street will be WB I-440 to Western Boulevard back to I-440 EB.
Start: November 9, 2025, 1:00 am / End:November 10, 2025, 10:00 am / Updated: November 5, 2025, 5:28 pm
440
Ramp Closed on I-440 In Raleigh / Mile Marker 4 Heading East
Ramp closure to help establish the new collector distributor lanes along I-440 EB.
DETOUR: Detour from I-440 EB is to Lake Boone Trail, I-440 WB, then Wade Avenue.
Start: November 9, 2025, 12:30 am / End:November 10, 2025, 10:00 am / Updated: November 5, 2025, 5:25 pm
40
Lane Closed on I-40 Near Chapel Hill / Mile Marker 265 Heading West
The Right lane is Closed past Exit 265(Hwy 86).
Start: November 7, 2025, 2:11 am / End:November 7, 2025, 4:11 am / Updated: November 7, 2025, 2:17 am
40
Lane Closed on I-40 Near Morganton / Mile Marker 100.5 Both Directions
The left lane will be closed half a mile prior to Exit 100, Jamestown Road, for drilling & boring operations. 
Start: November 3, 2025, 12:00 am / End:November 23, 2025, 12:00 pm / Updated: November 7, 2025, 1:55 am
40
Shoulder Closed on I-40 South of Durham / Mile Marker 278 to 276 Heading West
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 4:30 pm
40
Shoulder Closed on I-40 South of Durham / Mile Marker 274 to 275 Heading East
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 4:22 pm
40
Lane Closed on I-40 In Asheville / Mile Marker 50 to 45.5 Heading West
The right lane will be closed near Exit 50, US 25 (Hendersonville Rd).       
Start: November 7, 2025, 1:00 am / End:November 7, 2025, 11:00 am / Updated: November 7, 2025, 12:03 am
40
Lane Closed on I-40 In Asheville / Mile Marker 44 to 43 Heading West
The left lane will be closed near Exit 44, US 19,23,74 ALT (Smokey Park Highway), for pavement repairs. 
Start: November 6, 2025, 1:00 am / End:November 7, 2025, 10:00 am / Updated: November 7, 2025, 12:57 am
40
Shoulder Closed on I-40 In Old Fort / Mile Marker 72 to 73 Heading East
Logo sign maintenance
Start: November 17, 2025, 2:00 pm / End:November 21, 2025, 9:00 pm / Updated: November 5, 2025, 6:57 pm
40
Shoulder Closed on I-40 West of Asheville / Mile Marker 37 to 37.5 Heading East
Logo sign maintenance
Start: November 17, 2025, 2:00 pm / End:November 21, 2025, 9:00 pm / Updated: November 5, 2025, 6:54 pm
40
Shoulder Closed on I-40 West of Asheville / Mile Marker 38 to 37.5 Heading West
Logo sign maintenance
Start: November 17, 2025, 2:00 pm / End:November 21, 2025, 9:00 pm / Updated: November 5, 2025, 6:53 pm
40
Shoulder Closed on I-40 South of Durham / Mile Marker 275 to 274 Heading East
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 4:32 pm
40
Shoulder Closed on I-40 South of Durham / Mile Marker 276 to 275 Heading East
Logo sign maintenance
Start: November 10, 2025, 2:00 pm / End:November 14, 2025, 9:00 pm / Updated: November 5, 2025, 4:35 pm
40
Shoulder Closed on I-40 West of Asheville / Mile Marker 36 to 37 Heading East
Logo sign maintenance
Start: November 17, 2025, 2:00 pm / End:November 21, 2025, 9:00 pm / Updated: November 5, 2025, 6:56 pm
40
Lane Closed on I-40 In Asheville / Mile Marker 46 to 47.5 Heading East
The left lane will be closed near Exit 46A, I-26 East.      
Start: November 7, 2025, 1:00 am / End:November 7, 2025, 11:00 am / Updated: November 7, 2025, 1:15 am
26
Lane Closed on I-26 In Asheville / Mile Marker 27 to 26.5 Heading West
The right lane will be closed 2 miles before Exit 25, Broadway St.       
Start: November 7, 2025, 2:30 am / End:November 7, 2025, 8:00 am / Updated: November 7, 2025, 2:18 am
26
Lane Closed on I-26 Near Saluda / Mile Marker 61 to 63 Heading East
The right lane is closed 2 miles east of Exit 59, Ozone Drive. 
Start: November 5, 2025, 10:45 pm / End:November 7, 2025, 11:00 am / Updated: November 6, 2025, 10:47 pm
26
Lane Closed on I-26 Near Hendersonville / Mile Marker 56 Heading West
The left lane will be closed 2 miles prior to Exit 54, US 25, for leveling/milling/striping operations. 
Start: November 12, 2025, 1:30 pm / End:November 12, 2025, 9:00 pm / Updated: November 5, 2025, 11:02 pm
26
Lane Closed on I-26 Near Columbus / Mile Marker 65 to 62 Heading West
The left lane is closed 2 miles after Exit 67, US 74 (Sgt W Dean Arledge Memorial Hwy).
Start: November 4, 2025, 10:00 pm / End:November 7, 2025, 11:00 am / Updated: November 5, 2025, 10:59 pm
26
Lane Closed on I-26 Near Hendersonville / Mile Marker 56 Heading East
The left lane will be closed 2 miles east of Exit 54, to pave the median & shoulder.
Start: November 11, 2025, 12:00 pm / End:November 11, 2025, 9:00 pm / Updated: November 5, 2025, 10:48 pm
26
Shoulder Closed on I-26 In Asheville / Mile Marker 7 to 6 Heading West
Logo sign maintenance
Start: November 17, 2025, 2:00 pm / End:November 21, 2025, 9:00 pm / Updated: November 5, 2025, 6:52 pm
26
Lanes Closed on I-26 Near Mountain Home / Mile Marker 47 to 46 Heading West
The two right lanes will be closed 2 miles after Exit 49B, US 64 (Four Seasons Boulevard). 
Start: November 5, 2025, 12:30 am / End:November 7, 2025, 11:00 am / Updated: November 7, 2025, 12:27 am
26
Lane Closed on I-26 Near Mountain Home / Mile Marker 46 to 47 Heading East
The right lane will be closed 2 miles east of Exit 44, US 25 (Asheville Highway).
Start: November 6, 2025, 1:00 am / End:November 7, 2025, 11:00 am / Updated: November 7, 2025, 12:28 am
240
Shoulder Closed on I-240 In Asheville / Mile Marker 5 to 6 Heading East
Logo sign maintenance
Start: November 17, 2025, 2:00 pm / End:November 21, 2025, 9:00 pm / Updated: November 5, 2025, 6:52 pm
source: North Carolina DOT


National Traffic Forecast

 
Wide-Ranging Weather Impacts on Roads
Updated Wed Nov 5th 2025, 2:58am PST
Northwest & Northern California: Heavy Rain and Winds
Expect heavy rain and strong winds in Seattle,WA and Portland,OR Wednesday through Friday. State Route 101, Interstate 5, and Highway 97 could see slick conditions and possible flooding. Commuters should plan for potential delays, especially during peak hours, and travelers should stay updated on road conditions.
Northern Mid-Atlantic & Southern New England: High Winds
High Wind Watches are in effect for regions such as Boston,MA and New York,NY from Wednesday afternoon into Thursday. Interstates like I-95 and I-84 may experience strong crosswinds, challenging driving conditions, and possible debris on roads. Expect delays and drive with caution.
Northern Montana: Snow and Winds
In Billings,MT, expect gusty winds exceeding 55 mph on Thursday. Highways like US Route 2 and Interstate 90 may be difficult to navigate with potential snowfall at higher elevations.
Great Lakes & Northeast: Rain and Snow
Chicago,IL and Detroit,MI will see rain from Wednesday onwards, with some snow in higher elevations of the Northern Appalachians on Thursday. Interstates such as I-80 and I-90 could face wet and slippery conditions.
Southern High Plains & Texas: Fire Weather
The Albuquerque,NM and Amarillo,TX areas will experience dry and breezy conditions, raising fire weather potential Thursday. Be cautious on roads like Interstate 40 and US Route 60, where visibility could be reduced by dust or smoke.
Midwest & Ohio Valley: Thunderstorms
Expect thunderstorms in Indianapolis,IN and Columbus,OH by Friday morning. Interstate 70 and Highway 40 might experience heavy rain, which can reduce visibility and affect travel times.

Currituck weather and traffic updates by locals

Write your own Currituck, North Carolina report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Currituck, NC report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Currituck, NC report and/or forecast will be removed by a moderator.