Fort Wingate Traffic and Road Conditions

Fort Wingate Traffic Map

No Traffic Flow? Zoom in Closer

How to use the Fort Wingate Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic or no traffic*. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

* In known extreme weather events or accidents, the map provider may still show green lines, even if lanes or the entire road is closed.

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Fort Wingate Traffic Alerts

Title: Roadwork, I 40 from mile marker 43, 17 miles east of Gallup to mile marker 45, Coolidge.
Description: Roadwork~~~Eastbound I-40 is reduced to one lane from mile marker 43-44 (Coolidge) due to roadwork. Eastbound traffic is being diverted onto the westbound median shoulder. Westbound has 2 lanes open. Speed reduced to 55mph through the work zone. All work will be performed weekdays from 7am-6pm. Please drive with caution, reduce speed and obey all posted traffic signs. WATCH FOR SLOW MOVING OR STOPPED TRAFFIC. USE BOTH LANES AND TAKE TURNS MERGING AT CONSTRUCTION ZONE. This event will be updated as conditions change.
Post Date: 2022-05-18 16:09:22.0
Update Date: 2022-12-12 15:22:39.0
Expiration Date: unknown
Title: Alert, I 40 from mile marker 44, Coolidge Interchange to mile marker 33, NM 400 (Fort Wingate/McGaffey) Interchange.
Description: Alert~~~Eastbound I-40 is backed up at mile marker 33 - 44 (Fort Wingate/McGaffey to the Coolidge Interchange). WATCH FOR SLOW MOVING OR STOPPED TRAFFIC. USE BOTH LANES AND TAKE TURNS MERGING AT CONSTRUCTION ZONE. Expect delays. This event will be updated as conditions change.
Post Date: 2023-01-18 14:02:31.0
Update Date: 2023-01-25 13:16:51.0
Expiration Date: unknown
Title: Alert, I 25 northbound at mile marker 167, 17 miles north of Socorro.
Description: Alert~~~The northbound Walking Sands Rest area is closed due to septic issues. The NMDOT will remove once reopened.
Post Date: 2023-01-18 11:12:32.0
Update Date: 2023-02-06 10:22:42.788
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~I-25 northbound and southbound from mile marker 454 to mile marker 460, (RATON PASS/PORT OF ENTRY). The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-06-16 13:27:31.0
Update Date: 2022-01-19 08:20:12.0
Expiration Date: unknown
Title: Roadwork, US 54 at mile marker 304 Montoya / Tucumcari.
Description: Roadwork~~~US 54 from mile marker 303 to mile marker 305. The New Mexico Department of Transportation District Four will have road construction on U.S. 54 between mile posts 303 to 305. Please drive with caution, reduce speed and obey all posted traffic signs. The traveling public is advised to expect minor delays. (ET Construction)
Post Date: 2021-06-16 13:21:24.0
Update Date: 2021-06-30 10:39:39.0
Expiration Date: unknown
Title: Construction Closure, NM 344 from mile marker 12 to mile marker 15.
Description: Construction Closure~~~A drainage improvement has begun on NM 344 from mile marker 12.71 to 14.77. One lane will be closed while work proceeds on the roadway, with a temporary stoplight in place. Please be aware that there is a vehicle width restriction of 10 feet throughout the construction zone. Expect delays and use caution while travelling through the area.
Post Date: 2021-10-13 13:16:02.0
Update Date: 2022-11-08 07:59:10.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~AUI, Inc. (Contractor) is continuing with roadwork and replacement of the NM 404 Bridge over I-10 at milepost 162, Anthony exit. Traffic will be switching onto both bridges as needed to finalize the construction project. I-10 will have closures in place on various lanes from Tuesday, February 7th until Thursday, February 9th from 9 a.m. until 2 p.m. for bridge painting, detours may be required onto the on/off ramps. Daily contractor hours of operation are from 7 a.m. to 5 p.m., Monday through Friday. Traffic control will remain in place 24/7.
Post Date: Wed Jan 13 14:58:54 MST 2021
Update Date: 2023-02-06 10:56:55.0
Expiration Date: unknown
Title: Roadwork, NM 518 at mile marker 24, La Cueva.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 25 mph and motorists can anticipate minor delays.
Post Date: 2023-01-11 10:59:24.0
Update Date: 2023-01-11 10:59:24.0
Expiration Date: unknown
Title: Roadwork, NM 209 from mile marker 8 to mile marker 9.
Description: Roadwork~~~Bridge repairs and replacement will begin on January 9th, 2023 on NM 209 from mm 8.97 to mm 9.175 (Ned Houk Park area). Motorists should expect intermittent lane closures in both and north and southbound lanes throughout the duration of the project and an automated stop light running 24/7. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. There is a 11ft width restriction for this project. Work is expected to be complete July 15, 2023, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-01-04 15:45:09.0
Update Date: 2023-01-31 07:50:59.0
Expiration Date: unknown
Title: Construction Closure, NM 45 southbound at mile marker 6, Cottonwood Ln.
Description: PNM is doing a Feeder Rebuild. Replacing Poles and Wire. They will have right lane closure and shoulder work. Motorist should anticipate delays.
Post Date: 2023-02-01 07:32:37.0
Update Date: 2023-02-01 07:32:37.0
Expiration Date: unknown
Title: Roadwork, US 64 at mile marker 318, 8 miles east of Cimarron. Right lane closed.
Description: Roadwork~~~One lane closure with Mobile Traffic Signal System, expect minor delays.
Post Date: 2022-05-31 09:12:43.0
Update Date: 2022-05-31 09:12:43.0
Expiration Date: unknown
Title: Roadwork, NM 434 from mile marker 19, 5 miles north of Guadalupita to mile marker 22, 4 miles south of Black Lake. Right lane closed.
Description: Roadwork~~~Clearing and Grubbing operations are underway. A single lane closure is in place, expect delays.
Post Date: 2022-05-31 08:37:09.0
Update Date: 2022-05-31 08:37:09.0
Expiration Date: unknown
Title: Roadwork, NM 53 from mile marker 15, Black Rock to mile marker 19, 4 miles east of Black Rock.
Description: Roadwork~~~NM 53 is reduced to one lane in both directions from mile marker 15-19 (Black Rock, east of Zuni) due to road construction work. Temporary street signals will guide traffic through the work zone. PLEASE WAIT FOR TRAFFIC SIGNALS TO AVOID ONCOMING TRAFFIC. Traffic control will remain in place 24/7. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2022-05-24 11:10:49.0
Update Date: 2022-12-12 15:20:33.0
Expiration Date: unknown
Title: Lane Closure, NM 609 from mile marker 0, Gallup to mile marker 2, Gallup.
Description: Lane Closure~~~NM 609 will have multiple lane closures from mile marker 0-2 (Gallup) due to road maintenance. all work will be performed until 3:30pm. Please drive with caution, reduce speed, and obey all posted traffic signs. This event will be updated as conditions change. **This event will auto expire at 1530hrs**
Post Date: 2023-01-24 09:44:56.0
Update Date: 2023-01-24 09:45:56.0
Expiration Date: 2099-12-31 15:30:00.0
Title: Roadwork, NM 39 from mile marker 19, 5 miles south of Gallegos to mile marker 30, 6 miles north of Gallegos.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2022-08-23 07:32:51.0
Update Date: 2022-08-23 07:32:51.0
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Seasonal Closure, NM 159 from mile marker 12, 3 miles east of Mogollon to mile marker 22, 3 miles west of Willow Creek Campground.
Description: Seasonal Closure~~~The lower gate is located at milepost 12.3, just past Mogollon, and the upper gate located at milepost 22.6, Willow Creek Campground. This closure is in place due to winter weather conditions making the roadway impassable. The traveling public is asked to use US 180 to NM 12 (Reserve) to NM 435 (Reserve Beaverhead Road) for access into Willow Creek, Snow Lake and the Gila National Forrest. The NMDOT will monitor gates, expected reopening is scheduled for late April to mid-May.
Post Date: Tue Dec 20 08:18:17 MST 2022
Update Date: 2023-02-06 10:54:59.0
Expiration Date: unknown
Title: Fair Driving, NM 78 from mile marker 5, 1 mile west of Mule Creek to mile marker 8, 2 miles east of Mule Creek.
Description: Fair Driving Conditions - Standing water on roadway. Use extreme caution.~~~NM 78 “Mule Creek” from milepost 5 to 8 has water running over the roadway at low water crossings, roadway is still passable. When the roadway is flooded do not cross and seek an alternate route. NMDOT is currently monitoring and will notify as conditions change.
Post Date: 2023-01-17 15:51:06.0
Update Date: 2023-02-06 10:22:42.788
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~One lane will be closed for roadwork in each direction from 7:00 AM to 7:00 PM, Monday through Friday, during daylight hours. This project is scheduled for completion in the summer of 2023. There will be lane closures and traffic switches during this time as construction progresses. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2022-11-08 07:57:45.0
Expiration Date: unknown
Title: Alert, NM 124 from mile marker 0, at NM 117 to mile marker 8, 1 mile east of I-40 exit 96.
Description: Alert~~~NM 124 HAS A PERMANENT HEIGHT RESTRICTION IN PLACE. All CMV's and high profile vehicles are PROHIBITED on NM 124, from mile marker 0-8 (from Skyway at Exit 89 to McCartys at Exit 96) due to a low 13' clearance of a concrete box culvert and no turn-around space. This event will be updated as conditions change.
Post Date: 2020-01-14 15:29:13.0
Update Date: 2022-06-02 09:26:46.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 22, 1 mile north of Loving. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Donna Gililland 575-626-4857
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-01-03 08:41:23.0
Expiration Date: unknown
Title: Construction Closure, NM 528 northbound and southbound at mile marker 6.
Description: NM 528 NB & SB milepost 5.4-5.7 (Westside Blvd) The New Mexico Department of Transportation will have 24-Hour restrictions of NM 528 SB & NB turn bays to Westside Blvd. Work will be performed for state road maintenance and improvements. Motorists should anticipate delays. Contractor: Star Paving PM: City of Albuquerque
Post Date: 2022-07-28 10:52:42.0
Update Date: 2023-01-20 08:45:12.0
Expiration Date: unknown
Title: Construction Closure, US 550 northbound and southbound at mile marker 2, Bernalillo.
Description: US 550 milepost 4 The Department of Transportation will be working on roads to complete project on US 550. There will be several lane closures. Motorists should anticipate delays. Contractor: FNF NMDOT: NMDOT PM: NetoRey Terrazas
Post Date: 2022-07-28 10:16:33.0
Update Date: 2023-01-27 09:35:54.0
Expiration Date: unknown
Title: Construction Closure, NM 556 northbound and southbound at mile marker 13, at Rover Ave.
Description: NM 556 Mile post 13.0-14.5 (Tramway) The New Mexico Department of Transportation will be working on pedestrian bridges between Montgomery and Candelaria between 9AM 3PM.There will be various lane closures and shoulder restrictions daily. Motorists should anticipate delays. Contractor: Meridian Contracting. NMDOT PM: Jeremy Maestas
Post Date: 2022-07-28 09:56:13.0
Update Date: 2023-01-27 09:37:46.0
Expiration Date: unknown
Title: Construction Closure, I 25 northbound and southbound at mile marker 225, (LOMAS / MLK).
Description: The New Mexico Department of Transportation is doing roadway rehabilitation project on I-25 at MLK. crews will be working on various lanes and shoulders in both directions of I-25 and MLK. All ramp closures will have detours provided. Martin Luther King(MLK) northbound off ramp is closed. Please use new traffic pattern. Northbound traffic will be reduced to one lane beginning at 8:00 PM on September 23rd. The northbound on-ramps at Gibson, Avenida Cesar Chavez, and Lead will be closed with detours to the MLK on-ramp in place. Traffic will be returned to three lanes by 5:00 am on September 24th Northbound traffic will access MLK by exiting at the Lead/Coal off-ramp and proceeding north on Oak St. to MLK. MLK access for southbound traffic on I-25 will not be affected. Motorists should anticipate delays. Contractor: Star Paving NMDOT PM: Manny Ramirez
Post Date: 2022-07-28 08:08:44.0
Update Date: 2023-01-27 09:36:53.0
Expiration Date: unknown
Title: Roadwork, NM 41 from mile marker 56, Galisteo to mile marker 62, Lamy.
Description: Roadwork~~~NM 41 Phase III Improvements – Milepost 56.6 to US 84/285 ***A new traffic pattern has been put in place for the duration of the project. One lane will be open in each direction and the speed limit will be reduced to 35 mph in the construction zone for the duration of the project. ***
Post Date: 2022-07-21 14:43:17.0
Update Date: 2022-11-08 07:58:18.0
Expiration Date: unknown
Title: Alert, NM 104 from mile marker 69, Mesa Rica to mile marker 106, Tucumcari.
Description: Alert~~~There has been a weight restriction on NM 104 of 50,000 lbs.
Post Date: 2022-10-20 13:32:12.0
Update Date: 2022-10-20 13:32:12.0
Expiration Date: unknown
Title: Roadwork, US 54 northbound and southbound from mile marker 122, 1 mile south of Carrizozo to mile marker 124, 1 mile north of Carrizozo.
Description: Roadwork~~~Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Temporary Traffic Signals have been installed at the intersection of US 54 & US 380, all directions are down to one lane through the intersection, Motorist should obey Traffic Signals at all times. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667
Post Date: 2022-09-15 14:35:30.0
Update Date: 2022-09-15 14:35:30.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2023-02-03 16:51:18.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 0, Texas State Line to mile marker 8, 8 miles south of Malaga.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Donna Gililland 575-626-4857
Post Date: 2020-08-13 14:51:47.0
Update Date: 2023-02-03 16:50:37.0
Expiration Date: unknown
Title: Roadwork, US 380 at mile marker 65, Carrizozo.
Description: Dynamic Message signs are being installed throughout Lincoln and Otero Counties. US 380, MP 65 to MP 66, US 70 at MP 259 in Lincoln County and US 70 at MP 231 in Otero County. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Aaron Clark, NMDOT Project Manager (575)840-3566; Contractor; Erin Millwood, Bixby Electric, Construction Project Manager (505)263-3421 ; Russell Critchell, Bixby Electric, Construction Traffic Control Supervisor (505)238-3595~~~
Post Date: 2022-03-10 11:12:16.0
Update Date: 2022-10-31 14:33:38.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 266, 2 miles west of Vaughn to mile marker 267, 1 mile west of Vaughn. , right shoulder, and left shoulder
Description: Roadwork~~~Bridge Rehabilitation and reconstruction on US60/285 mile post 266.500 to mile post 267.626. Kimo Construction is continuing brdige reconstruction operation with traffic reduced to one lane each direction on the norhtbound bridge. Motorist can expect delays or seek an alternate route. Drivers please be aware of equipment and personnel in the work zone. Also please follow and obey all posted signs. Please follow signs for detour, speed limit is reduced to 45 miles per hour in the work zone and there is a 12ft width restriction. Work is expected to be complete fall of 2023, depending on weather and other unforeseen delays. Contractor - Kimo Construction Lucas Lucero – 505-452-7217 NMDOT - Debbie Ysasi 575-291-5208
Post Date: 2020-01-02 12:39:45.0
Update Date: 2023-01-31 07:51:13.0
Expiration Date: unknown
Title: Fair Driving, US 64 from mile marker 184 Canjilon to mile marker 208, 15 miles west of Tres Piedras.
Description: Fair Driving Conditions - Roads are snow packed and icy in spots.~~~Crews are out plowing and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-01-15 17:04:14.0
Update Date: 2023-02-03 21:45:29.0
Expiration Date: unknown
Title: Difficult Driving, NM 126 from mile marker 25, 13 miles west of NM 4 to mile marker 38, at NM 4.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Moderate snow may cause limited visibility.~~~Difficult driving conditions on NM 126, mile marker 25-38 (from the Fish Hatchery to La Cueva Campground). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2023-01-15 05:20:24.0
Update Date: 2023-01-15 05:20:24.0
Expiration Date: unknown
Title: Alert, US 180 at mile marker 144, 4 miles east of Faywood Hot Springs.
Description: Alert~~~Butterfield Rest area is closed due to septic issues. The NMDOT will remove once reopened.
Post Date: 2022-11-28 09:34:19.0
Update Date: 2023-02-06 10:22:42.788
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 270, 8 miles south of Santa Fe to mile marker 269, La Bajada.
Description: Roadwork~~~Kimo Constructors Inc, in conjunction with the New Mexico Department of Transportation are set to begin a bridge rehabilitation project on Canyon Ridge Road that spans I 25. The existing bridge superstructure will be raised and rehabilitated. *** During peak commuter hours all lanes will be open for traffic. Peak commuter hours would be 7am to 9am northbound and 3pm to 6pm southbound. *** Partial lane closures in either direction may occur between 5am and 11 pm, and full I-25 closures may occur between 11pm and 5am. In the event of a full I-25 lane closure traffic will be detoured to the La Cienega Interchange onto the East frontage road to Waldo Canyon Interchange back on to I-25. *** Work is expected to be completed within 3 weeks.
Post Date: 2022-06-27 10:46:08.0
Update Date: 2022-11-08 07:58:33.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad. Center lane closed.
Description: Roadwork~~~Road construction is underway between MM 38.5 and 42.0 on US 285. The Speed Limit is reduced to 45 MPH. Motorists should obey all construction signing and watch for construction personnel and equipment. Brian Torres, NMDOT Project Manager (575) 626-4278; Rick Castillo, NMDOT Construction Traffic Control Supervisor (512) 630-3554; Erin Millwood, Bixby Electric, Project Manager (505) 263.3421; Trae Baldwin, Bixby Electric Traffic Control Supervisor (505) 379-8058.
Post Date: 2022-08-22 15:46:56.0
Update Date: 2023-01-25 10:14:52.0
Expiration Date: unknown
Title: Alert, NM 152 from mile marker 15, San Lorenzo to mile marker 40, Kingston.
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2022-06-20 20:25:08.0
Update Date: 2023-02-06 10:22:42.788
Expiration Date: unknown
Title: Construction Closure, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Construction Closure~~~Construction begins on a one-year-long project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. . Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. Please obey all traffic control personnel and proceed with caution through the roadwork zone. **PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!**
Post Date: 2022-04-18 07:33:36.0
Update Date: 2022-11-08 07:57:05.0
Expiration Date: unknown
Title: Roadwork, NM 169 at mile marker 28, 1 mile south of Alamo.
Description: Roadwork~~~Hasse Contracting Co. (Contractor) will be continuing bridge repairs on NM 169 near milepost 28.58. There is no impact to traffic, and only shoulder work signage in place. Contractors working hours are Monday through Thursday from 7 a.m. to 5 p.m. Construction is estimated to be in place till February 2023.
Post Date: 2022-10-17 09:10:17.0
Update Date: 2023-02-06 10:22:42.788
Expiration Date: unknown
Title: Construction Closure, NM 187 from mile marker 33, Las Palomas to mile marker 36, Williamsburg.
Description: Construction Closure~~~El Terrero Construction, LLC. (Contractor) begins construction on Monday, Jan. 16 to replace a structurally deficient bridge at I-25, Broadway Street and NM 187 in Williamsburg. The contractor will build two phases of the project, Phase 1 and Phase 5, at the same time. The following traffic impacts will be in place for about one and one-half months, through the end of February 2023: NM 187 will be closed from Broadway Street to Palomas Circle so that the contractor can build drainage structures. Affected businesses and residents can access I-25 via Exit 71. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours will be 7:30 a.m.-5 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed. Access will be maintained to all businesses and residences during construction.
Post Date: 2023-01-16 08:56:41.0
Update Date: 2023-02-06 10:22:42.788
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound at mile marker 75, Williamsburg (T OR C SOUTH).
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) begins construction on Monday, Jan. 16 to replace a structurally deficient bridge at I-25, Broadway Street and NM 187 in Williamsburg. The contractor will build two phases of the project, Phase 1 and Phase 5, at the same time. The following traffic impacts will be in place for about one and one-half months, through the end of February 2023: The left lane of I-25 northbound and I-25 southbound will be closed near the bridge so that the contractor can begin building the center pier of the bridge. One lane of traffic will remain open in both directions (northbound and southbound) on I-25. NM 187 will be closed from Broadway Street to Palomas Circle so that the contractor can build drainage structures. Affected businesses and residents can access I-25 via Exit 71. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours will be 7:30 a.m.-5 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed. Access will be maintained to all businesses and residences during construction.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2023-02-06 10:22:42.788
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 117, 30 miles south of Socorro to mile marker 124, (SAN MARCIAL).
Description: Roadwork~~~Hasse Contracting Co. (Contractor) this project is on winter suspension, contractor is expected to be back March 2023.
Post Date: 2022-02-14 16:17:12.0
Update Date: 2023-02-06 10:22:42.788
Expiration Date: unknown
Title: Closure, Closure
Description: Closure~~~COCHITI PUEBLO WILL BE CLOSED FOR EVERYONE WHO IS NOT RESIDENTIAL. Be advised the ONLY entrance open to residents, which will be monitored by law enforcement. (ONLY TRIBAL RESIDENTS). Safety precautions during the COVID-19
Post Date: 2020-04-13 08:23:13.0
Update Date: 2020-04-13 08:25:13.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2022-11-08 07:57:24.0
Expiration Date: unknown
Title: Construction Closure, I 25 from mile marker 264, (COCHITI/NM 16) to mile marker 267, WALDO.
Description: Construction Closure~~~The first phase of the La Bajada Slope Mitigation project begins on July 11, 2022. This will entail the closure of the northbound right line and the construction of crossover lanes between the northbound and southbound roadways. 2 lanes will be open during peak hours for the duration of the project. At all other times, lane closures are possible, and motorists should plan their trips accordingly.
Post Date: 2022-07-11 12:14:48.0
Update Date: 2022-11-08 07:58:43.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~La Calerita Construction, LLC. (Contractor) construction on Date, Phase 1 is expected to last about 2 (two) months, through early March 2023, the following traffic impacts will be in place: Traffic on North Date Street will be reduced to one lane each direction (northbound and southbound) and will be shifted to the west (southbound) lanes from north of New School Road to Ash Street. Local traffic on Smith Street will be detoured to 9th Street. Local traffic on New School Road will be detoured to Barton St. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours will be 7 a.m. to 5 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed.
Post Date: 2023-01-09 10:16:30.0
Update Date: 2023-02-02 08:26:53.0
Expiration Date: unknown
Title: Crash, I 25 southbound at mile marker 231, (SAN ANTONIO).
Description: Crash~~~I 25 southbound at San Antonio the 2 center lanes are closed due to a crash. Reduce speed and use caution. Seek alternate route.
Post Date: 2023-02-06 10:13:47.0
Update Date: 2023-02-06 10:13:47.0
Expiration Date: unknown
Title: Lane Closure, NM 117 from mile marker 17, 8 miles south of Pie Town Road to mile marker 14, 11 miles south of Pie Town Road.
Description: Lane Closure~~~NM 117 will have multiple lane closures from mile marker 14-17 (South of Pie Town Road) due to road maintenance. Please watch for flaggers in roadway. All work will be performed until 2:00pm. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change. **This event is set to auto expire at 1400hrs**
Post Date: 2023-02-06 08:55:45.0
Update Date: 2023-02-06 08:55:45.0
Expiration Date: Mon Feb 06 14:00:00 MST 2023
Title: Alert, US 54 from mile marker 43, 23 miles south of Alamogordo to mile marker 47, 19 miles south of Alamogordo.
Description: Alert~~~NMDOT crews will begin mowing operations off US 54 from mm 43 (south of Alamogordo) to mm 47. Please use caution, reduce speed and watch for all personnel and equipment in the area. NMDOT contact is Randy Silva (575) 291-9023.
Post Date: 2023-02-06 08:39:32.0
Update Date: 2023-02-06 08:39:32.0
Expiration Date: unknown
Title: Construction Closure, NM 14 at mile marker 4, Canoncito.
Description: The New Mexico Department of Transportation will be having various lane closures and shoulder restriction. Work being performed for install of retaining wall, earthwork, drainage, and new bike path. Motorist should expect delays. Contractor: AUI NMDOT: Jeremy Maestas~~~
Post Date: 2022-09-30 16:19:44.0
Update Date: 2023-01-24 03:18:43.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad.
Description: Roadwork~~~Roadwork for intersection lighting will begin on August 2nd, 2022 on US 285 from mm 38.5 to mm 42 (North of Carlsbad). There will be lane restrictions (780’ taper with drums) during the day from 6:00 AM to 6:00 PM with traffic control being taken off the road at the end of the work day. This is a 60 day project with estimated completion being September 2022. Contractor: Bixby Electric; Project Manager: Erin Millwood (505)263-3421 Superintendent: Russell Critchell (505)238-3595; TCS Trae Baldwin (505) 379-8058. NMDOT PM Brian Torres (575) 626-4278.
Post Date: 2022-07-29 12:13:40.0
Update Date: 2022-09-01 15:22:31.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Construction Closure, NM 337 northbound and southbound at mile marker 10 Chilili.
Description: The New Mexico Department of Transportation is rebuilding bridge. Motorist should anticipate delays
Post Date: 2023-01-20 09:46:45.0
Update Date: 2023-01-20 09:46:45.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 123, Carrizozo. , right shoulder, and left shoulder
Description: Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667~~~
Post Date: 2022-02-18 11:01:42.0
Update Date: 2022-07-22 09:47:34.0
Expiration Date: unknown
Title: Roadwork, US 62 at mile marker 32, Carlsbad.
Description: Roadwork~~~Road construction is underway for intersection realignment on US 62/180 at mm 32 (intersection of Hidalgo Rd). Beginning January 20th, 2023 until January 30th, 2023 the turning lanes along with both north and southbound inner passing lanes will be closed. Traffic will be routed to the outside north and southbound lanes. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be completed end of March 2023, weather permitting. Brian Torres, NMDOT Project Manager (575) 626-4278; Rick Castillo, NMDOT Construction Traffic Control Supervisor (512) 630-3554; Contractor, Constructors Inc.
Post Date: 2022-07-15 10:28:04.0
Update Date: 2023-01-20 12:00:58.0
Expiration Date: unknown
Title: Roadwork, NM 83 from mile marker 0, Lovington to mile marker 1, 1 mile east of Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US83 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. Traffic Control has been removed from the downtown area. Traffic Control has been placed on HHY82 from Main to past Commercial. There is a lane closure for work. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 410 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on HWY 83 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drivepads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2104340 project: Contractor: Constructors, Inc., Project Manager- Gabriel Ortega (575) 496-9397, Superintendent-James King (575) 885-8838. Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938, Project Safety Office- Tami Mandel (505) 697-1787- Project RRO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2023-01-27 09:56:58.0
Expiration Date: unknown
Title: Roadwork, NM 173 from mile marker 2 to mile marker 4.
Description: Roadwork~~~Work begins on 6/6/2022 on a project that will include roadway reconstruction, improved drainage structures, erosion control & revegetation, new right-of-way fencing, and permanent signing and striping. One lane will be closed for the duration of the project, and there will be a width restriction limit for all vehicles of 9 feet. Work will take place Monday through Friday, from 7am until 4:30pm each day. The contractor, AUI Inc., expects to have the project completed in November 2022.
Post Date: 2022-06-03 10:55:55.0
Update Date: 2022-11-08 07:56:56.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 16, Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, will be working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Donna Gililland 575-626-4857
Post Date: 2022-06-03 07:40:05.0
Update Date: 2023-02-03 16:50:49.0
Expiration Date: unknown
Title: Alert, I 10 westbound at mile marker 61, 20 miles west of Deming.
Description: Alert~~~Gage Rest Area is closed due to a water issue. The NMDOT will remove once reopened.
Post Date: 2023-02-03 13:27:10.0
Update Date: 2023-02-06 10:22:42.788
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Fair 21°F
30.11in
Barometer
88%
Humidity
North 0.0mph
Wind
Fair

More Local Information

Bookmark and Share

Traffic Nearby

Fort Wingate weather and traffic updates by locals

Write your own Fort Wingate, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Fort Wingate, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Fort Wingate, NM report and/or forecast will be removed by a moderator.