Kirtland Air Force Base Traffic and Road Conditions

Kirtland Air Force Base Traffic Map

No Traffic Flow? Zoom in Closer

How to use the Kirtland Air Force Base Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic or no traffic*. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

* In known extreme weather events or accidents, the map provider may still show green lines, even if lanes or the entire road is closed.

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Kirtland Air Force Base Traffic Alerts

Title: Closure, I 10 at mile marker 164, Anthony.
Description: Closure~~~Monday, December 4, at 9pm, through Thursday, December 7, at 9am • Eastbound I-10 will be closed to all traffic at Vinton Road. DETOUR: Take Exit 2 (Spur 37/Vinton Road/Westway Drive), continue on South Desert Boulevard, and re-enter I-10 before Redd Road. Crews will be pouring two new concrete bridge decks and allowing them to cure. Beginning Monday, December 4, at 9pm • The temporary on-ramp from South Desert Boulevard to eastbound I-10 near Canutillo High School will close permanently. DETOUR: Continue on South Desert Boulevard to the temporary on-ramp near Redd Road. Crews will begin construction of a new temporary off-ramp. TXDOT will continue to have various lane closures in place and the possibility of overnight closures into Texas, please follow detour signage and obey posted signage. Expect delays.
Post Date: 2023-11-29 09:37:56.0
Update Date: 2023-12-05 07:59:46.0
Expiration Date: unknown
Title: Alert, NM 159 from mile marker 4, 4 miles east of US 180 to mile marker 25, Willow Creek Campground.
Description: NM 159 from milepost 4 to milepost 25 (Willow Creek Campground). STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 46 feet in length are PROHIBITED on this section of NM 159. Trucks longer than 30 feet are highly encouraged to utilize a pilot vehicle. Consider using an alternate route - US 180 to NM 12 to NM 435 (NF-141). THIS IS A PERMANENT ALERT.~~~
Post Date: 2022-11-23 07:06:02.0
Update Date: 2023-12-05 07:59:27.0
Expiration Date: unknown
Title: Lane Closure, US 64 from mile marker 26, 3 miles east of Shiprock to mile marker 28, 5 miles east of Shiprock.
Description: Lane Closure~~~One lane will be closed in each direction for the construction of turning lanes and lighting at the entrance to Flowing Water Casino. Work is expected to be completed by the end of November 2023. *** There is an 11-foot width restriction in place in both directions for the duration of this project. ***
Post Date: 2023-09-20 14:16:05.0
Update Date: 2023-11-27 13:26:16.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~I-25 northbound and southbound from mile marker 454 to mile marker 460, (RATON PASS/PORT OF ENTRY). The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-06-16 13:27:31.0
Update Date: 2023-10-12 13:43:01.0
Expiration Date: unknown
Title: Roadwork, US 54 at mile marker 304 Montoya / Tucumcari.
Description: Roadwork~~~US 54 from mile marker 303 to mile marker 305. The New Mexico Department of Transportation District Four will have road construction on U.S. 54 between mile posts 303 to 305. Please drive with caution, reduce speed and obey all posted traffic signs. The traveling public is advised to expect minor delays. (ET Construction)
Post Date: 2021-06-16 13:21:24.0
Update Date: 2023-06-07 07:30:30.0
Expiration Date: unknown
Title: Roadwork, NM 176 from mile marker 26, 8 miles west of Eunice to mile marker 34, Eunice.
Description: Roadwork~~~Roadwork mill and fill operations have begun on NM 176 from mm 26 (west of Eunice) to mm 34 (Eunice). NM 176 will be reduced to one lane for both eastbound and westbound traffic. Drivers can expect pilot car and flagging operations throughout the duration of the project and working hours. Drivers are encouraged to plan accordingly and expect short delays. Use caution for all workers and equipment in the area. The hours of operation are from 7:00 a.m. to 5:30 p.m., Monday through Sunday. Estimated completion is early January 2024, weather permitting. Contractor: Cutler Repaving Inc. Superintendent- Marcus Jacobs (785) 766-2408; NMDOT Project Manager- John Lara (575) 626-9872; NMDOT AMS- Greg Evans (575) 626-3850.
Post Date: 2023-11-15 12:00:52.0
Update Date: 2023-11-30 15:41:51.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 344, 2 miles east of Taiban to mile marker 345, 1 mile west of Tolar. Roadway closed.
Description: Roadwork~~~Bridge deck replacement is taking place on US60/84 from MP 344.479 to MP 344.713. In the workzone the speed limit is reduced to 45MPH expect delays. There is a 12ft width restriction wide loads must seek alternate route. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. Work is expected to be completed in the Spring of 2024, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-12 06:53:39.0
Update Date: 2023-12-01 12:40:50.0
Expiration Date: unknown
Title: Construction Closure, NM 333 eastbound and westbound at mile marker 7 Tijeras.
Description: NM 333 NB/SB milepost 7.6 (Thru 12/29) There will be a flagging/pilot car operation. Work is being performed for highway maintenance. Motorists should anticipate delays. Contractor: TLC
Post Date: 2023-11-08 08:07:10.0
Update Date: 2023-11-30 12:37:29.0
Expiration Date: 2023-12-29 15:00:00.0
Title: Lane Closure, NM 90 from mile marker 41, 1 mile south of Silver City to mile marker 42, Silver City.
Description: Lane Closure~~~NM 90 southbound lane from milepost 42 to 41.5 will have the driving lane closed overnight due to manhole repairs. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the area. Please be sure to expect delays.
Post Date: 2023-11-28 16:58:15.0
Update Date: 2023-11-30 14:46:49.0
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Closure, Closure
Description: Closure~~~Bridge 1190 has been closed due to structural integrity. The NMDOT is assessing the situation to determine the next course of action.
Post Date: 2023-08-22 11:19:23.0
Update Date: 2023-08-30 12:52:49.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 151, 19 miles south of Corona to mile marker 163, 7 miles south of Corona.
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2023-08-01 12:29:28.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~One lane will be closed for roadwork in each direction from 7:00 AM to 7:00 PM, Monday through Friday, during daylight hours. This project is scheduled for completion in the summer of 2023. There will be lane closures and traffic switches during this time as construction progresses. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2022-11-08 07:57:45.0
Expiration Date: unknown
Title: Construction Closure, Construction Closure
Description: Construction Closure~~~The New Mexico Department of Transportation (NMDOT) and contractor will be continuing with repairs to the I-10 to I-25 ramp in Las Cruces. Hasse Contracting Company, Inc. (Contractor) will be making the needed concrete repairs to the bridge deck, barrier walls and support piers. Lane closures will be required on I-10 eastbound lanes for the safety of the traveling public and our construction crews. This work is expected to complete mid-November.
Post Date: 2023-07-11 23:41:50.0
Update Date: 2023-12-01 06:41:47.0
Expiration Date: unknown
Title: Roadwork, NM 442 from mile marker 13, 1 mile north of Ojo Flez to mile marker 21, Ocate.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 25 mph and motorists can anticipate minor delays.
Post Date: 2023-08-08 08:07:14.0
Update Date: 2023-08-08 08:07:14.0
Expiration Date: unknown
Title: Alert, US 82 at mile marker 16 Cloudcroft.
Description: Alert~~~US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles. STEEP GRADES, NUMEROUS TIGHT TURNS, AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route. US 62/180 or US 70. THIS IS A PERMANENT ALERT.
Post Date: 2023-12-05 13:16:41.0
Update Date: 2023-12-05 13:16:41.0
Expiration Date: unknown
Title: Fair Driving, US 64 from mile marker 193, 30 miles west of Tres Piedras to mile marker 198, 25 miles west of Tres Piedras.
Description: Fair Driving Conditions - Roads are wet, snow packed and icy in spots.~~~Crews are out plowing and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-12-05 10:04:48.0
Update Date: 2023-12-05 10:04:48.0
Expiration Date: unknown
Title: Alert, NM 120 eastbound and westbound from mile marker 3, 3 miles east of Black Lake to mile marker 12, 5 miles west of Ocate.
Description: Alert~~~Roadway has limited width clearance. Tree canopies will produce prolonged icy and snow packed road conditions, four-wheel drive vehicles are recommended.
Post Date: 2023-12-05 09:36:22.0
Update Date: 2023-12-05 09:36:22.0
Expiration Date: unknown
Title: Fair Driving, NM 475 from mile marker 6 to mile marker 15.
Description: Fair Driving Conditions - Roads are wet, snow packed and icy in spots.~~~Crews are out plowing and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-12-05 09:24:52.0
Update Date: 2023-12-05 09:24:52.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 17, 1 mile north of Malaga. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Title: Difficult Driving, NM 536 from mile marker 0 San Antonito to mile marker 13 Sandia Crest.
Description: Difficult Driving Conditions - Roads are wet with some icy spots. Black ice may exist when temperatures drop.~~~Reduce speed and use caution in area.
Post Date: 2023-11-30 17:54:14.0
Update Date: 2023-12-04 09:38:12.0
Expiration Date: unknown
Title: Construction Closure, I 40 eastbound and westbound at mile marker 175, (NM 14) (NM 337).
Description: I-40 EB/WB MP 173-182 (Thru 12/8) The New Mexico Department of Transportation will be having various lane and shoulder restriction. The work being performed for interstate maintenance. This will be night work. Motorists should anticipate delays. Contractor: MSCI Project A302123 NMDOT: Will Rose
Post Date: 2023-11-30 12:41:18.0
Update Date: 2023-11-30 12:41:18.0
Expiration Date: 2023-12-08 23:59:00.0
Title: Difficult Driving, NM 126 from mile marker 5, 5 miles east of Cuba to mile marker 26, 12 miles west of NM 4.
Description: Difficult Driving Conditions - Roads are slushy, snow packed and icy in spots. Visibility is good with clear skies.~~~Difficult driving conditions on NM 126, mile marker 5-26 (from east of Cuba to West of NM 4). Road is slushy, snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2023-11-30 07:51:11.0
Update Date: 2023-12-04 14:37:04.0
Expiration Date: unknown
Title: Difficult Driving, NM 134 from mile marker 0, Sheep Springs to mile marker 22 , 4 miles south of Crystal.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Visibility is good with clear skies.~~~Difficult driving conditions on NM 134, mile marker 0-16 (from Sheep Springs to Crystal). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-11-30 05:04:45.0
Update Date: 2023-12-04 14:37:15.0
Expiration Date: unknown
Title: Fair Driving, NM 126 from mile marker 26, 12 miles west of NM 4 to mile marker 38, at NM 4.
Description: Fair Driving Conditions - Roads are wet and may become slick. Blowing snow may cause limited visibility.~~~Fair driving conditions on NM 126, mile marker 25-38 (from the Fish Hatchery to La Cueva Campground). Road is wet and may freeze with dropping temperatures. Visibility is fair. Please drive with caution, reduce speed, and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2023-11-30 04:46:15.0
Update Date: 2023-12-04 14:36:56.0
Expiration Date: unknown
Title: Construction Closure, NM 109 northbound and southbound at mile marker 5, 1 mile north of Jarales.
Description: NM 109 milepost 5.3-6.1 (Thru 3/20/2024) The New Mexico Department of Transportation will have a continues road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: Nieto Terrazas
Post Date: 2023-07-27 12:01:32.0
Update Date: 2023-11-30 12:39:56.0
Expiration Date: 2024-03-20 23:59:00.0
Title: Lane Closure, US 550 from mile marker 160, Aztec to mile marker 165, 1 mile south of Inca.
Description: Lane Closure~~~The New Mexico Department of Transportation (NMDOT) and Fisher Sand & Gravel Inc. will begin a roadway improvement project on U.S. 550 between mile markers 161 and 165 in Aztec N.M. This project will consist of full-depth reclamation, removal of existing asphalt, placement of new asphalt pavement, safety enhancements, traffic control, signing and striping. Starting May 1, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. There will be an 11-foot width restriction in place in the southbound lane only. The contractor will be working Monday through Friday from 7:00 a.m. to 7:00 p.m. Motorists can expect delays during this time. Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. Updates on this project will be posted on the New Mexico Department of Transportation’s road advisory website, http://nmroads.com/.
Post Date: 2023-04-27 12:42:19.0
Update Date: 2023-11-27 11:12:33.0
Expiration Date: unknown
Title: Construction Closure, NM 448 northbound and southbound at mile marker 3.
Description: NM 45 NB/SB milepost 18-20 (Thru 12/16) There will be left lane and median restrictions. Work is being performed for City of Albuquerque landscape beautification. Motorists should anticipate delays. Contractor: City of Albuquerque-Phase V-VI
Post Date: 2023-09-21 08:59:33.0
Update Date: 2023-11-30 12:35:49.0
Expiration Date: 2023-12-16 23:59:00.0
Title: Construction Closure, NM 528 northbound and southbound at mile marker 5.
Description: NM 45 NB/SB (Elison to Westside) milepost 22 (Thru 12/15) There will be left lane and median restrictions. Work is being performed for City of Albuquerque landscape beautification. Motorists should anticipate delays. Contractor: Lee Landscape
Post Date: 2023-09-21 08:56:03.0
Update Date: 2023-11-30 12:36:59.0
Expiration Date: 2023-12-15 23:59:00.0
Title: Roadwork, NM 41 from mile marker 56, Galisteo to mile marker 62, Lamy.
Description: Roadwork~~~NM 41 Phase III Improvements – Milepost 56.6 to US 84/285 ***A new traffic pattern has been put in place for the duration of the project. One lane will be open in each direction and the speed limit will be reduced to 35 mph in the construction zone for the duration of the project. ***
Post Date: 2022-07-21 14:43:17.0
Update Date: 2022-11-08 07:58:18.0
Expiration Date: unknown
Title: Construction Closure, I 40 eastbound and westbound at mile marker 181, (SEDILLO HILL).
Description: I-40 EB/WB MP 181-184 (Thru 12/22) The New Mexico Department of Transportation will be having various lane and shoulder restrictions at night. Work is being performed for highway maintenance. Motorists should anticipate delays. Contractor: Uretek USA NMDOT: Barry Lytle
Post Date: 2023-11-16 18:36:43.0
Update Date: 2023-11-30 12:39:23.0
Expiration Date: 2023-12-22 23:59:00.0
Title: Construction Closure, I 40 eastbound at mile marker 181, (SEDILLO HILL).
Description: I-40 EB milepost 181-184 (Thru 12/15) The New Mexico Department of Transportation will be having left lane and shoulder restrictions at night. Work is being performed for highway maintenance. Motorists should anticipate delays. Contractor: Uretek USA NMDOT: Barry Lytle
Post Date: 2023-11-16 18:36:11.0
Update Date: 2023-11-16 18:36:11.0
Expiration Date: 2023-12-15 23:59:00.0
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 124, 1 mile north of Carrizozo.
Description: Roadwork~~~FULL SUSPENSION-Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Temporary Traffic Signals have been installed at the intersection of US 54 & US 380, all directions are down to one lane through the intersection, Motorist should obey Traffic Signals at all times. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667
Post Date: 2022-09-15 14:35:30.0
Update Date: 2023-08-01 12:25:03.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2023-08-01 12:08:40.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 0, Texas State Line to mile marker 8, 8 miles south of Malaga.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2020-08-13 14:51:47.0
Update Date: 2023-08-01 11:59:19.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 266, 2 miles west of Vaughn to mile marker 267, 1 mile west of Vaughn. , right shoulder, and left shoulder
Description: Roadwork~~~Bridge Rehabilitation and reconstruction on US60/285 mile post 266.500 to mile post 267.626. Kimo Construction is continuing bridge reconstruction operations with traffic reduced to one lane each direction on the bridge. Motorist can expect delays or seek an alternate route. Drivers please be aware of equipment and personnel in the work zone. Also please follow and obey all posted signs. Please follow signs for detour, speed limit is reduced to 45 miles per hour in the work zone and there is a 12ft width restriction. Work is expected to be complete fall of 2023, depending on weather and other unforeseen delays. Contractor - Kimo Construction Lucas Lucero – 505-452-7217 or Romie Jone 505-339-7544 NMDOT - Donna Gililland 575-626-4857
Post Date: 2020-01-02 12:39:45.0
Update Date: 2023-11-17 11:15:43.0
Expiration Date: unknown
Title: Alert, US 380 at mile marker 43, 13 miles east of Bingham.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 or 575-678-2222 for daily information on possible closure dates and times for firings. THIS IS A PERMANENT ALERT.
Post Date: 2021-07-01 08:53:50.0
Update Date: 2023-12-05 14:56:37.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 305, 21 miles north of Santa Fe to mile marker 309, 25 miles north of Santa Fe.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 45 mph and motorists can anticipate minor delays.
Post Date: 2023-08-26 11:52:17.0
Update Date: 2023-10-12 13:44:15.0
Expiration Date: unknown
Title: Fair Driving, NM 536 from mile marker 0 San Antonito to mile marker 13 Sandia Crest.
Description: Fair Driving Conditions - Slush may cause slick roadway.~~~Please reduce speed and use caution.
Post Date: 2023-11-25 12:34:53.0
Update Date: 2023-11-25 12:34:53.0
Expiration Date: unknown
Title: Roadwork, I 40 at mile marker 44, Coolidge Interchange.
Description: Roadwork~~~Roadwork on I-40, mile marker 44 (Coolidge). Eastbound has 2 lanes open to traffic and westbound is reduced to one lane. Speed reduced to 55 mph the construction zone. For more information contact El Terrero Construction at (505) 896-3864. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-03-04 08:09:09.0
Update Date: 2023-11-14 07:53:12.0
Expiration Date: 2099-12-31 12:00:00.0
Title: Roadwork, I 10 from mile marker 2, (Vinton) to mile marker 69, 12 miles west of Deming.
Description: Roadwork~~~MWI, Inc. (Contractor) will be continuing the installation of the Truck Parking Availability System (TPAS) along Interstate 10 from milepost 2 (NM/AZ Stateline) to milepost 163 (Anthony). Crews will be working from milepost 2.4(AZ Stateline) to milepost 69 (west of Deming). Various lane closures will be in place on I-10 eastbound driving right lane from milepost 2 to 25. The hours of operation will be from 7 a.m. to 5 p.m., Monday through Thursday.
Post Date: 2023-07-31 11:56:55.0
Update Date: 2023-11-20 13:45:15.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 150, (SOCORRO NORTH) to mile marker 161, Chamizal.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) will be continuing the roadway rehabilitation project on Interstate 25 from milepost 150 (Socorro North) to milepost 161 (Chamizal). Drivers can expect various daytime lane closures on both the northbound and southbound lanes as needed. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday. This project is expected to take 180 working days to complete, weather pending.
Post Date: 2023-08-28 08:52:29.0
Update Date: 2023-11-09 15:11:16.0
Expiration Date: unknown
Title: Alert, US 70 at mile marker 184, 22 miles west of Holloman AFB.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: 2022-06-27 10:28:09.0
Update Date: 2023-12-05 14:56:18.0
Expiration Date: unknown
Title: Construction Closure, NM 101 eastbound and westbound at mile marker 0, Mesilla.
Description: Construction Closure~~~JGF Built LLC (Contractor) is currently replacing the underground utilities on NM 101 from milepost 0 to 0.8 (Intersection of Avenida de Mesilla and University Ave.) in the Town of Mesilla. Traffic can expect a full roadway closure, a detour is in place on NM 28 (Ave. De Mesilla), NM 373 (Union Ave), and McDowell Rd. Please obey traffic control devices. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday. Drivers should expect delays and plan accordingly.
Post Date: 2023-06-26 14:30:30.0
Update Date: 2023-06-26 14:30:30.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad. Center lane closed.
Description: Roadwork~~~FULL SUSPENSION-Road construction is underway between MM 38.5 and 42.0 on US 285. The Speed Limit is reduced to 45 MPH. Motorists should obey all construction signing and watch for construction personnel and equipment. Brian Torres, NMDOT Project Manager (575) 626-4278; Rick Castillo, NMDOT Construction Traffic Control Supervisor (512) 630-3554; Erin Millwood, Bixby Electric, Project Manager (505) 263.3421; Trae Baldwin, Bixby Electric Traffic Control Supervisor (505) 379-8058.
Post Date: 2022-08-22 15:46:56.0
Update Date: 2023-08-01 12:19:16.0
Expiration Date: unknown
Title: Closure, NM 72 from mile marker 0, Raton to mile marker 36, Folsom. Roadway closed.
Description: Closure - Roads are snow packed and icy.~~~Winter Road Closure. No maintenance throughout closure.
Post Date: 2023-11-20 14:43:06.0
Update Date: 2023-12-04 11:30:55.0
Expiration Date: unknown
Title: Construction Closure, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Construction Closure~~~Construction continues on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. . Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. *** One lane will be closed for the duration of the project, and flaggers and a pilot car will be on hand to guide motorists through the construction zone 24 hours a day, 7 days a week until the end of the project. *** Please obey all traffic control personnel and proceed with caution through the roadwork zone. *** PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!***
Post Date: 2022-04-18 07:33:36.0
Update Date: 2023-06-29 11:39:06.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 387, 1 mile west of Clovis to mile marker 389, eastside of Clovis. Roadway closed.
Description: Roadwork~~~Road Reconstruction project on US60/84 from MP 387.800 to MP 389.120. Work has begun on Phase One which will include waterline/drainage structures installation as well as building of water basin. Santa Fe Ave is closed to traffic and the US60/84 Eastbound Lane will be reduced from two to one lane from Ash St to Sycamore St. Also on US60/84 from Grand Ave to Main St traffic is reduced to one lane in each direction. There is a 12ft width restriction, oversized or wide loads must use the designated truck bypass off of Hall St. Project expected completion date is Summer of 2025 depending on weather and delays. Contractor - AUI, Inc.- Carl Johnson 505-401-5251 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-17 15:32:10.0
Update Date: 2023-12-01 12:41:02.0
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 273, 13 miles west of Eagle Nest to mile marker 276, 10 miles west of Eagle Nest.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced down to 25 mph with a width restriction of 9.5 ft. and length restriction of 65 ft. Motorists can anticipate delays.
Post Date: 2023-04-17 09:42:31.0
Update Date: 2023-07-06 07:57:26.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 75, Williamsburg (T OR C SOUTH).
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) will be continuing construction to replace the bridge at I-25 milepost 75, Broadway Street and NM 187 in Williamsburg. Traffic has been shifted into the northbound lanes with the on/off ramps open, access to the southbound on/off ramps are still closed. Currently crews are working on installation of southbound on/off ramps, pillar base and drainage structures. Regular work hours will be 7 a.m.-5:30 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed. Access will be maintained to all businesses and residences during construction.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2023-11-03 14:30:39.0
Expiration Date: unknown
Title: Roadwork, US 84 northbound and southbound at mile marker 208, Tierra Azul.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) and Hasse Contracting Company Inc. will begin a bridge repair project at mile marker 208 on U.S. 84 in Abiquiu. This project will consist of structural repairs and modifications, concrete drainage installation, concrete wall barrier installation, and new guardrail installations. *** Starting August 14th, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. Working hours will be from 7a.m. to 5p.m., Monday through Friday. All lanes will be reopened by the end of the workday and all traffic control devices will be removed from the roadway. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. ***
Post Date: 2023-08-14 10:03:01.0
Update Date: 2023-08-14 10:03:01.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 125, 10 miles west of Las Cruces to mile marker 132, 3 miles west of Las Cruces.
Description: Roadwork~~~The New Mexico Department of Transportation District One office will have lane closures in place from milepost 132 to 125 due to road maintenance. This closure will be in the driving right lane to remove the shifted asphalt creating a bump in the roadway. Overnight closures may be needed with temporary barrier wall in place. The crew will be in place Monday through Thursday from 8 a.m. to 5 p.m. Overnight Lane closure may be in place if needed. Roadwork is expected to be completed by December 7, 2023.
Post Date: 2023-11-13 09:47:29.0
Update Date: 2023-11-29 09:04:05.0
Expiration Date: 2023-12-07 17:00:00.0
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2022-11-08 07:57:24.0
Expiration Date: unknown
Title: Construction Closure, I 25 from mile marker 264, (COCHITI/NM 16) to mile marker 267, WALDO.
Description: Construction Closure~~~The first phase of the La Bajada Slope Mitigation project begins on July 11, 2022. This will entail the closure of the northbound right line and the construction of crossover lanes between the northbound and southbound roadways. 2 lanes will be open during peak hours for the duration of the project. At all other times, lane closures are possible, and motorists should plan their trips accordingly.
Post Date: 2022-07-11 12:14:48.0
Update Date: 2022-11-08 07:58:43.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~La Calerita LLC. (Contractor) construction, the contractor continues construction on roundabout 3, during construction, traffic will be shifted into the southbound lanes with the northbound lanes closed. NM 181 will be closed for approx. one month to construct NM 181 and portion of Date St. During this time there will be a detour route in place for NM 181 traffic. The contractor will be working on curb and gutter, concrete pavement, and roadway construction. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours will be 7 a.m. to 5 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed.
Post Date: 2023-01-09 10:16:30.0
Update Date: 2023-12-04 07:14:28.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 55, (QUINCY) to mile marker 65, 16 miles west of Deming.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) has completed the roadway rehabilitation project on Interstate 10 from milepost 55 (Quincy) to milepost 65 (16 miles west of Deming). Currently, the subcontractor is installing permanent signage throughout the project. No planned impacts to traffic. The hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2023-02-06 10:58:17.0
Update Date: 2023-11-03 14:31:22.0
Expiration Date: unknown
Title: Roadwork, NM 26 at mile marker 26, 2 miles west of Nutt.
Description: Roadwork~~~Meridian Contracting, Inc. (Contractor) is currently working on a bridge rehabilitation project on NM 26 “Hatch Hwy” at milepost 26.8 near Nutt. Traffic can expect a temporary traffic signal in place with only one lane open over the bridge. Speed limits will be reduced, please obey traffic control devices. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday. Drivers should expect delays and plan accordingly.
Post Date: 2023-06-05 09:18:53.0
Update Date: 2023-11-03 14:31:05.0
Expiration Date: unknown
Title: Roadwork, NM 80 from mile marker 32, Roadforks to mile marker 8, at NM 9.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be moving into Fog Sealing operations on roadways around Hidalgo Co. The crew will be working on NM 9, NM 80, and NM 338. Speed limits will be reduced, no center stripe with loose gravel on roadway. Pilot car operations will be in place.
Post Date: 2023-05-01 12:45:37.0
Update Date: 2023-11-03 14:35:10.0
Expiration Date: unknown
Title: Roadwork, NM 338 from mile marker 0, at I-10 to mile marker 24, Animas.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be moving into Fog Sealing operations on roadways around Hidalgo Co. The crew will be working on NM 9, NM 80, and NM 338. Speed limits will be reduced, no center stripe with loose gravel on roadway. Pilot car operations will be in place.
Post Date: 2023-05-01 12:45:03.0
Update Date: 2023-11-03 14:35:20.0
Expiration Date: unknown
Title: Roadwork, NM 113 from mile marker 10, 10 miles north of NM 9 to mile marker 20, 1 mile south of I-10.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be starting the 2023 season “Chip Sealing and Brooming” operations in Hidalgo Co. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2023-05-01 12:44:33.0
Update Date: 2023-08-17 08:43:39.0
Expiration Date: unknown
Title: Roadwork, US 380 at mile marker 65, Carrizozo.
Description: Roadwork~~~Project is in Full Suspension-Dynamic Message signs are being installed throughout Lincoln and Otero Counties. US 380, MP 65 to MP 66, US 70 at MP 259 in Lincoln County and US 70 at MP 231 in Otero County. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Aaron Clark, NMDOT Project Manager (575)840-3566; Contractor; Erin Millwood, Bixby Electric, Construction Project Manager (505)263-3421 ; Russell Critchell, Bixby Electric, Construction Traffic Control Supervisor (505)238-3595
Post Date: 2023-05-01 09:30:41.0
Update Date: 2023-08-01 12:27:39.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad.
Description: Roadwork~~~Roadwork for intersection lighting will begin on August 2nd, 2022 on US 285 from mm 38.5 to mm 42 (North of Carlsbad). There will be lane restrictions (780’ taper with drums) during the day from 6:00 AM to 6:00 PM with traffic control being taken off the road at the end of the work day. This is a 60 day project with estimated completion being September 2022. Contractor: Bixby Electric; Project Manager: Erin Millwood (505)263-3421 Superintendent: Russell Critchell (505)238-3595; TCS Trae Baldwin (505) 379-8058. NMDOT PM Brian Torres (575) 626-4278.
Post Date: 2022-07-29 12:13:40.0
Update Date: 2022-09-01 15:22:31.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Roadwork, US 84 from mile marker 6, 6 miles north of Fort Sumner to mile marker 12, 12 miles north of Fort Sumner.
Description: Roadwork~~~Road Rehabilitation on US84 from MP 6.740 to MP 12.736. Work began in June 2023. In the workzone traffic is reduced to one lane with a pilot car so expect delays. When traveling through the work zone please obey all posted signage and be aware of personnel as well as equipment. Project expected completion date is Winter of 2023. NMDOT PM- Debbie Ysasi 575-291-5208 K Barnett Superintendent- Art Metcalf (336)417-2752.
Post Date: 2023-05-26 15:47:28.0
Update Date: 2023-12-01 12:40:37.0
Expiration Date: unknown
Title: Roadwork, US 84 from mile marker 12, 12 miles north of Fort Sumner to mile marker 18, 14 miles south of Puerto De Luna.
Description: Roadwork~~~Road Rehabilitation on US84 from MP 12.674 to MP 18.48. Roadwork is taking place with traffic reduced to one lane with portable traffic signals and pilot car. Due to lane being closed expect delays. There is a 12ft width restriction oversized loads please seek alternate route. When traveling through the workzone please obey all posted signage and be aware of personnel as well as equipment. Project expected completion date is Winter of 2023. NMDOT PM- Debbie Ysasi 575-291-5208 Mountain States Superintendent- Joe Lopez (505)492-8716
Post Date: 2023-05-26 15:44:13.0
Update Date: 2023-12-01 12:40:23.0
Expiration Date: unknown
Title: Construction Closure,
Description: NM 423 at Eagle Ranch Rd milepost 2.3-2.7 (Thru 4/30/2024) There will be various shoulder and intermittent lane restrictions. Work is being performed for commercial development. Motorists should anticipate delays. Contractor: Custom Grading Inc
Post Date: 2023-10-20 07:17:26.0
Update Date: 2023-11-30 12:36:20.0
Expiration Date: 2024-04-30 23:59:00.0
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 123, Carrizozo. , right shoulder, and left shoulder
Description: Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667~~~
Post Date: 2022-02-18 11:01:42.0
Update Date: 2022-07-22 09:47:34.0
Expiration Date: unknown
Title: Alert, NM 14 northbound and southbound from mile marker 28, 1 mile south of Madrid to mile marker 29, Madrid.
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2023-08-18 16:17:57.0
Expiration Date: unknown
Title: Lane Closure, I 25 from mile marker 159, McNierney to mile marker 175, Bernardo (US 60/MOUNTAINAIR).
Description: Lane Closure~~~J-H Supply, Co. (Contractor) will be continuing a guardrail and end treatment project along I-25 in Socorro County from milepost 159 to 175. Motorists can expect lane closures in the northbound and southbound driving right lanes from milepost 160 to 162. Overnight lane closures should be expected. The hours of operation are from 7 a.m. to 5 p.m., Monday through Friday. Construction is expected to be completed by Spring 2024.
Post Date: 2023-02-17 14:06:00.0
Update Date: 2023-12-01 13:11:47.0
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound at mile marker 0, Church Rock (I-40).
Description: Roadwork~~~Bridge Replacement work on NM 566, mile marker 0 - 0.866 (Church Rock). All traffic has been shifted to the detour pavement. Watch for equipment. This event will be updated as conditions change.
Post Date: 2023-10-13 15:46:41.0
Update Date: 2023-10-13 15:46:41.0
Expiration Date: unknown
Title: Roadwork, NM 9 from mile marker 0, 1 mile east of AZ State Line to mile marker 12, 1 mile west of Animas.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be moving into Fog Sealing operations on roadways around Hidalgo Co. The crew will be working on NM 9, NM 80, and NM 338. Speed limits will be reduced, no center stripe with loose gravel on roadway. Pilot car operations will be in place.
Post Date: 2023-10-13 09:29:46.0
Update Date: 2023-11-27 07:40:47.0
Expiration Date: unknown
Title: Roadwork, NM 404 from mile marker 1 to mile marker 9.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor), will be continuing the roadway reconstruction and lighting project on NM 404 from milepost 0.9 (Anthony) to milepost 8.8 (Chaparral). Traffic has been shifted into the eastbound lanes so construction can begin on the westbound lanes. Currently, the contractor is installing drainage structures, subgrade preparation, Base Course, and Hot Mix. The speed limit has been reduced to 45 MPH for the safety of the traveling public. The contractor’s hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday, some Saturdays as needed.
Post Date: 2022-12-09 13:32:21.0
Update Date: 2023-11-03 14:32:47.0
Expiration Date: unknown
Title: Alert, NM 475 from mile marker 1 to mile marker 5.
Description: Alert~~~Beginning Monday, September 11, 2023, PNM will begin a project to upgrade the electrical service to residents on N.M. 475. One lane will be closed in various spots between mile marker 2.5 to 4.5 until the project is completed. *** For more information, please contact the PNM Electric Hotline @ 1-833-910-3670 ***
Post Date: 2023-09-08 12:37:39.0
Update Date: 2023-11-25 18:02:56.0
Expiration Date: unknown
Title: Alert, US 380 at mile marker 66, Carrizozo.
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.~~~
Post Date: 2017-01-06 12:52:40.0
Update Date: 2023-12-05 14:56:31.0
Expiration Date: unknown
Title: Roadwork, NM 83 from mile marker 0, Lovington to mile marker 1, 1 mile east of Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US82 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. The intersection of NM 83/82 has been closed for construction. Use posted detour signs to navigate through construction. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 499 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on US 82 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drive pads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2101381R2 project: Contractor: Constructors, Inc., Project Manager- Darin Coslin (575) 626-1140, Superintendent- Hector Sicre (915)316-7732. Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938, Project Safety Office- Tami Mandel (505) 697-1787- Project EEO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2023-11-30 15:42:05.0
Expiration Date: unknown
Title: Alert, NM 152 from mile marker 15, San Lorenzo to mile marker 49, 1 mile east of Hillsboro.
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2023-03-03 14:03:42.0
Update Date: 2023-09-28 06:49:44.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 17, 1 mile north of Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2023-08-01 12:00:45.0
Expiration Date: unknown
Title: Fair Driving, NM 4 from mile marker 24, 7 miles east of Jemez Springs to mile marker 46, 13 miles east of Sierra De los Pinos.
Description: Fair Driving Conditions - Roads are wet and may become slick. Visibility is good with clear skies.~~~Faur driving conditions on NM 4, mile marker 24-46 (from east of Jemez Springs to the Los Alamos County Line). Road is wet and may freeze with dropping temperatures. Visibility is fair Please drive with caution, reduce speed, and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2023-12-01 04:48:45.0
Update Date: 2023-12-04 14:36:49.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Fair 34°F
30.42in
Barometer
73%
Humidity
North 10.4mph
Wind
Fair

More Local Information

Bookmark and Share

Traffic Nearby

Kirtland Air Force Base weather and traffic updates by locals

Write your own Kirtland Air Force Base, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Kirtland Air Force Base, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Kirtland Air Force Base, NM report and/or forecast will be removed by a moderator.