Los Alamos, NM Traffic and Road Conditions

Los Alamos Traffic Map

No Traffic Flow? Zoom in Closer

How to use the Los Alamos Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic or no traffic*. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

* In known extreme weather events or accidents, the map provider may still show green lines, even if lanes or the entire road is closed.

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Los Alamos Traffic Alerts

Title: Roadwork, I 40 from mile marker 43, 17 miles east of Gallup to mile marker 45, Coolidge.
Description: Roadwork~~~Eastbound I-40 is reduced to one lane from mile marker 43-44 (Coolidge) due to roadwork. Eastbound traffic is being diverted onto the westbound median shoulder. Westbound has 2 lanes open. Speed reduced to 55mph through the work zone. All work will be performed weekdays from 7am-6pm. Please drive with caution, reduce speed and obey all posted traffic signs. WATCH FOR SLOW MOVING OR STOPPED TRAFFIC. USE BOTH LANES AND TAKE TURNS MERGING AT CONSTRUCTION ZONE. This event will be updated as conditions change.
Post Date: 2022-05-18 16:09:22.0
Update Date: 2022-12-12 15:22:39.0
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~I-25 northbound and southbound from mile marker 454 to mile marker 460, (RATON PASS/PORT OF ENTRY). The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-06-16 13:27:31.0
Update Date: 2022-01-19 08:20:12.0
Expiration Date: unknown
Title: Roadwork, US 54 at mile marker 304 Montoya / Tucumcari.
Description: Roadwork~~~US 54 from mile marker 303 to mile marker 305. The New Mexico Department of Transportation District Four will have road construction on U.S. 54 between mile posts 303 to 305. Please drive with caution, reduce speed and obey all posted traffic signs. The traveling public is advised to expect minor delays. (ET Construction)
Post Date: 2021-06-16 13:21:24.0
Update Date: 2021-06-30 10:39:39.0
Expiration Date: unknown
Title: Fair Driving, NM 38 from mile marker 3, 3 miles east of Questa to mile marker 13, Red River.
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-15 19:57:07.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Roadwork, NM 518 at mile marker 24, La Cueva.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 25 mph and motorists can anticipate minor delays.
Post Date: 2023-01-11 10:59:24.0
Update Date: 2023-01-11 10:59:24.0
Expiration Date: unknown
Title: Alert, US 285 at mile marker 149, 4 miles south of Mesa.
Description: Alert~~~Motorists please be advised that Mesa Rest Area located off US 285 at mm 149 is Closed until further notice due to water lines and construction. This post will be updated with any changes.
Post Date: Wed Nov 09 09:53:53 MST 2022
Update Date: 2023-03-20 12:36:08.0
Expiration Date: unknown
Title: Roadwork, NM 209 from mile marker 8 to mile marker 9.
Description: Roadwork~~~Bridge repairs and replacement work on NM 209 from mm 8.97 to mm 9.175 (Ned Houk Park area) is on suspension due to weather limitations of remaining work. All lanes are open to traffic with no restrictions but when work resumes traveling public will be notified of any lane restrictions and closures. Work is expected to be complete Summer 2023, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-01-04 15:45:09.0
Update Date: 2023-03-17 11:08:54.0
Expiration Date: unknown
Title: Roadwork, NM 434 from mile marker 19, 5 miles north of Guadalupita to mile marker 22, 4 miles south of Black Lake. Right lane closed.
Description: Roadwork~~~Clearing and Grubbing operations are underway. A single lane closure is in place, expect delays.
Post Date: 2022-05-31 08:37:09.0
Update Date: 2022-05-31 08:37:09.0
Expiration Date: unknown
Title: Roadwork, NM 53 from mile marker 15, Black Rock to mile marker 19, 4 miles east of Black Rock.
Description: Roadwork~~~NM 53 is reduced to one lane in both directions from mile marker 15-19 (Black Rock, east of Zuni) due to road construction work. Temporary street signals will guide traffic through the work zone. PLEASE WAIT FOR TRAFFIC SIGNALS TO AVOID ONCOMING TRAFFIC. Traffic control will remain in place 24/7. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2022-05-24 11:10:49.0
Update Date: 2022-12-12 15:20:33.0
Expiration Date: unknown
Title: Roadwork, NM 39 from mile marker 19, 5 miles south of Gallegos to mile marker 30, 6 miles north of Gallegos.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2022-08-23 07:32:51.0
Update Date: 2022-08-23 07:32:51.0
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Seasonal Closure, NM 159 from mile marker 12, 3 miles east of Mogollon to mile marker 22, 3 miles west of Willow Creek Campground.
Description: Seasonal Closure~~~The lower gate is located at milepost 12.3, just past Mogollon, and the upper gate located at milepost 22.6, Willow Creek Campground. This closure is in place due to winter weather conditions making the roadway impassable. The traveling public is asked to use US 180 to NM 12 (Reserve) to NM 435 (Reserve Beaverhead Road) for access into Willow Creek, Snow Lake and the Gila National Forrest. The NMDOT will monitor gates, expected reopening is scheduled for late April to mid-May.
Post Date: Tue Dec 20 08:18:17 MST 2022
Update Date: 2023-03-20 07:01:26.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~One lane will be closed for roadwork in each direction from 7:00 AM to 7:00 PM, Monday through Friday, during daylight hours. This project is scheduled for completion in the summer of 2023. There will be lane closures and traffic switches during this time as construction progresses. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2022-11-08 07:57:45.0
Expiration Date: unknown
Title: Seasonal Closure, NM 126 from mile marker 17, 17 miles east of Cuba to mile marker 25, 13 miles west of NM 4.
Description: Seasonal Closure~~~NM 126 is closed from mile marker 17 to 25 (Moon canyon to Fish Hatchery). Dirt road is not passable. DO NOT TRAVEL THIS ROUTE. This event will be updated as conditions change.
Post Date: 2023-03-07 13:37:32.0
Update Date: 2023-03-07 14:36:32.0
Expiration Date: unknown
Title: Construction Closure, NM 500 eastbound at mile marker 4.
Description: The New Mexico Department of Transportation will be having various lane closures. Work being performed to rehab bridge joints. Motorist should anticipate delays. Contractor: Hasse
Post Date: 2023-03-07 07:37:07.0
Update Date: 2023-03-10 08:07:10.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 22, 1 mile north of Loving. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-03-16 15:35:28.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 381, westside of Cannon AFB to mile marker 382 Cannon AFB.
Description: Roadwork~~~Bridge repairs and replacement work on FR6001 from MP 0.240 to MP 0.199 (Cannon Air Force Base) is on suspension due to weather limitations of remaining work. All lanes are open to traffic with no restrictions but when work resumes traveling public will be notified of any lane restrictions and closures. Work is expected to be complete Summer 2023, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-02-23 11:01:50.0
Update Date: 2023-03-14 07:18:15.0
Expiration Date: unknown
Title: Roadwork, NM 41 from mile marker 56, Galisteo to mile marker 62, Lamy.
Description: Roadwork~~~NM 41 Phase III Improvements – Milepost 56.6 to US 84/285 ***A new traffic pattern has been put in place for the duration of the project. One lane will be open in each direction and the speed limit will be reduced to 35 mph in the construction zone for the duration of the project. ***
Post Date: 2022-07-21 14:43:17.0
Update Date: 2022-11-08 07:58:18.0
Expiration Date: unknown
Title: Fair Driving Conditions exist in the Clines Corners area.
Description: Fair Driving Conditions - Roads may be wet and may become icy as temperatures drop.~~~Crews are out plowing and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-16 18:52:42.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Difficult Driving Conditions exist in the Penasco area.
Description: Difficult Driving Conditions - Roads are snow packed and icy in spots.~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: Thu Mar 16 13:34:48 MDT 2023
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Difficult Driving, NM 76 from mile marker 15, 2 miles west of Truchas to mile marker 18, 1 mile east of Truchas.
Description: Difficult Driving Conditions - Roads are snow packed and icy in spots.~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-16 09:55:19.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Difficult Driving, NM 518 from mile marker 44, 2 miles south of Angostura to mile marker 65, 1 mile north of Vallecitos.
Description: Difficult Driving Conditions - Slush may cause slick roadway.~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-16 08:00:21.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Fair Driving Conditions exist in the Alcalde area.
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-16 07:47:43.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Roadwork, US 54 northbound and southbound from mile marker 122, 1 mile south of Carrizozo to mile marker 124, 1 mile north of Carrizozo.
Description: Roadwork~~~Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Temporary Traffic Signals have been installed at the intersection of US 54 & US 380, all directions are down to one lane through the intersection, Motorist should obey Traffic Signals at all times. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667
Post Date: 2022-09-15 14:35:30.0
Update Date: 2022-09-15 14:35:30.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2023-02-03 16:51:18.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 0, Texas State Line to mile marker 8, 8 miles south of Malaga.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2020-08-13 14:51:47.0
Update Date: 2023-03-16 15:32:42.0
Expiration Date: unknown
Title: Roadwork, US 380 at mile marker 65, Carrizozo.
Description: Dynamic Message signs are being installed throughout Lincoln and Otero Counties. US 380, MP 65 to MP 66, US 70 at MP 259 in Lincoln County and US 70 at MP 231 in Otero County. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Aaron Clark, NMDOT Project Manager (575)840-3566; Contractor; Erin Millwood, Bixby Electric, Construction Project Manager (505)263-3421 ; Russell Critchell, Bixby Electric, Construction Traffic Control Supervisor (505)238-3595~~~
Post Date: 2022-03-10 11:12:16.0
Update Date: 2022-10-31 14:33:38.0
Expiration Date: unknown
Title: Fair Driving, NM 35 from mile marker 5, Mimbres to mile marker 27, 0.5 miles south of NM 15.
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~NM 35 from milepost 5 to 25, low water crossing are running. Please drive with caution, reduce speed, and obey all posted traffic signs. The NMDOT will continue to monitor conditions. This event will be updated as conditions change.
Post Date: 2023-03-02 16:53:50.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 266, 2 miles west of Vaughn to mile marker 267, 1 mile west of Vaughn. , right shoulder, and left shoulder
Description: Roadwork~~~Bridge Rehabilitation and reconstruction on US60/285 mile post 266.500 to mile post 267.626. Kimo Construction is continuing brdige reconstruction operation with traffic reduced to one lane each direction on the norhtbound bridge. Motorist can expect delays or seek an alternate route. Drivers please be aware of equipment and personnel in the work zone. Also please follow and obey all posted signs. Please follow signs for detour, speed limit is reduced to 45 miles per hour in the work zone and there is a 12ft width restriction. Work is expected to be complete fall of 2023, depending on weather and other unforeseen delays. Contractor - Kimo Construction Lucas Lucero – 505-452-7217 NMDOT - Debbie Ysasi 575-291-5208
Post Date: 2020-01-02 12:39:45.0
Update Date: 2023-03-17 11:08:42.0
Expiration Date: unknown
Title: Fair Driving Conditions exist in the Ojo Caliente area.
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~ Crews are out plowing and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-18 11:41:12.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Fair Driving Conditions exist in the Tierra Amarilla area.
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~ Crews are out plowing and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-18 11:32:49.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Fair Driving, NM 68 from mile marker 15, 1 mile north of Velarde to mile marker 41, 1 mile south of Ranchos de Taos.
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~Watch for rocks on roadway due to heavy rainfall. Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-18 10:59:37.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Fair Driving, NM 522 from mile marker 21, 1 mile north of Questa to mile marker 41, Colorado State Line.
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~Crews are out plowing and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-18 06:16:02.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound at mile marker 44, Coolidge Interchange.
Description: Roadwork~~~Roadwork on I-40, mile marker 44 (Coolidge). Westbound has two lanes open to traffic. Eastbound is reduced to one lane via median crossover detour. Speed reduced to 55 mph the the construction zone. For more information contact El Terri Construction at (505) 896-3864. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-03-04 08:09:09.0
Update Date: 2023-03-04 16:21:27.0
Expiration Date: unknown
Title: Alert, US 180 at mile marker 144, 4 miles east of Faywood Hot Springs.
Description: Alert~~~Butterfield Rest area is closed due to septic issues. The NMDOT will remove once reopened.
Post Date: 2022-11-28 09:34:19.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 270, 8 miles south of Santa Fe to mile marker 269, La Bajada.
Description: Roadwork~~~Kimo Constructors Inc, in conjunction with the New Mexico Department of Transportation are set to begin a bridge rehabilitation project on Canyon Ridge Road that spans I 25. The existing bridge superstructure will be raised and rehabilitated. *** During peak commuter hours all lanes will be open for traffic. Peak commuter hours would be 7am to 9am northbound and 3pm to 6pm southbound. *** Partial lane closures in either direction may occur between 5am and 11 pm, and full I-25 closures may occur between 11pm and 5am. In the event of a full I-25 lane closure traffic will be detoured to the La Cienega Interchange onto the East frontage road to Waldo Canyon Interchange back on to I-25. *** Work is expected to be completed within 3 weeks.
Post Date: 2022-06-27 10:46:08.0
Update Date: 2022-11-08 07:58:33.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad. Center lane closed.
Description: Roadwork~~~Road construction is underway between MM 38.5 and 42.0 on US 285. The Speed Limit is reduced to 45 MPH. Motorists should obey all construction signing and watch for construction personnel and equipment. Brian Torres, NMDOT Project Manager (575) 626-4278; Rick Castillo, NMDOT Construction Traffic Control Supervisor (512) 630-3554; Erin Millwood, Bixby Electric, Project Manager (505) 263.3421; Trae Baldwin, Bixby Electric Traffic Control Supervisor (505) 379-8058.
Post Date: 2022-08-22 15:46:56.0
Update Date: 2023-01-25 10:14:52.0
Expiration Date: unknown
Title: Closure, NM 128 eastbound and westbound at mile marker 24, 24 miles east on NM 31.
Description: Closure~~~Motorists please be advised both east and westbound lanes on NM 128 at mm 24 (west of Jal) are closed due to a cmv crash. Please seek an alternate route at this time. Please use caution, reduce speed and watch for all emergency personnel and equipment in the area.
Post Date: 2023-03-20 12:39:33.0
Update Date: 2023-03-20 12:39:33.0
Expiration Date: unknown
Title: Lane Closure, US 491 northbound and southbound from mile marker 1, 1 mile north of Gallup to mile marker 18, 5 miles north of Twin Lakes.
Description: Lane Closure~~~Northbound and southbound driving and passing lanes will be closed alternately on US 491, mile marker 1-8 (Gallup to 5 miles north of Twin Lakes) for road maintenance work. Speed limit is reduced to 45 mph. All work will be performed until 4:30 pm. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-03-20 08:43:13.0
Update Date: 2023-03-20 08:43:13.0
Expiration Date: Mon Mar 20 16:30:00 MDT 2023
Title: Fair Driving Conditions exist in the Cerrillos area.
Description: Fair Driving Conditions - Roads may be wet and may become icy as temperatures drop. Heavy Snow may cause poor visibility.~~~Crews are out plowing and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-20 05:29:38.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Construction Closure, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Construction Closure~~~Construction begins on a one-year-long project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. . Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. Please obey all traffic control personnel and proceed with caution through the roadwork zone. **PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!**
Post Date: 2022-04-18 07:33:36.0
Update Date: 2022-11-08 07:57:05.0
Expiration Date: unknown
Title: Roadwork, NM 169 at mile marker 28, 1 mile south of Alamo.
Description: Roadwork~~~Hasse Contracting Co. (Contractor) will be continuing bridge repairs on NM 169 near milepost 28.58. There is no impact to traffic, and only shoulder work signage in place. Contractors working hours are Monday through Thursday from 7 a.m. to 5 p.m. Construction is estimated to be in place till March 30, 2023.
Post Date: 2022-10-17 09:10:17.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 75, Williamsburg (T OR C SOUTH).
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) will be continuing construction to replace the bridge at I-25 milepost 75, Broadway Street and NM 187 in Williamsburg. All traffic has been shifted into the southbound lanes; northbound lanes are closed throughout the project limits. The I-25 northbound on-ramp is open as well as NM 187. The southbound I-25 off/on-ramp at Exit 75 is closed, traffic should utilize NM 187 to Las Palomas Exit or the T or C North exit. Currently crews are working on installation of bridge piers and drainage structures. Regular work hours will be 7 a.m.-5:30 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed. Access will be maintained to all businesses and residences during construction.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 117, 30 miles south of Socorro to mile marker 124, (SAN MARCIAL).
Description: Roadwork~~~Hasse Contracting Co. (Contractor) this project is on winter suspension, contractor is expected to be back March 2023.
Post Date: 2022-02-14 16:17:12.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Roadwork, NM 245 from mile marker 0 to mile marker 7.
Description: Roadwork~~~Roadwork rehabilitation begins on NM 245 from mm 0 (Ranchavale Hwy) to mm 7 (Prince St). Milling and paving operations will begin at Prince St. on the eastbound and westbound inside lanes. The outside lanes will be open to traffic. Once completed, crews will then switch to the eastbound and westbound outside lanes keeping the inside lanes open for continuous traffic flow. Drivers can expect lane closures with pilot car operations. Drivers are encouraged to plan accordingly and expect short delays. The hours of operation are from 7 a.m. to 5 p.m., Monday through Saturday and continuing Monday through Friday the following week. Estimated completion is the end of March 2023, weather permitting. Contractor- Brasier Asphalt- Diego Dela Cruz Sr. 505-554-0380; NMDOT Project Manager Donna Gililland 575-626-4857; NMDOT AMS Greg Evans 575-626-3850.
Post Date: 2023-03-13 09:36:20.0
Update Date: 2023-03-17 11:09:06.0
Expiration Date: unknown
Title: Alert, NM 68 from mile marker 14, Velarde to mile marker 40, 2 miles south of Ranchos de Taos.
Description: Alert - Rock slide may cause rocks on roadway. Use caution.~~~Drive with caution! Please stay behind snowplows at least 50 feet.
Post Date: 2023-02-13 22:39:36.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2022-11-08 07:57:24.0
Expiration Date: unknown
Title: Construction Closure, I 25 from mile marker 264, (COCHITI/NM 16) to mile marker 267, WALDO.
Description: Construction Closure~~~The first phase of the La Bajada Slope Mitigation project begins on July 11, 2022. This will entail the closure of the northbound right line and the construction of crossover lanes between the northbound and southbound roadways. 2 lanes will be open during peak hours for the duration of the project. At all other times, lane closures are possible, and motorists should plan their trips accordingly.
Post Date: 2022-07-11 12:14:48.0
Update Date: 2022-11-08 07:58:43.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~La Calerita Construction, LLC. (Contractor) construction on Date, Phase 1 is expected to last about 2 (two) months, through April 2023, the following traffic impacts will be in place: Traffic on North Date Street will be reduced to one lane each direction (northbound and southbound) and will be shifted to the west (southbound) lanes from north of New School Road to Ash Street, a three-way stop will be in place. Local traffic on Smith Street will be detoured to 9th Street. Local traffic on New School Road will be detoured to Barton St. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours will be 7 a.m. to 5 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed.
Post Date: 2023-01-09 10:16:30.0
Update Date: 2023-03-17 13:54:38.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 55, (QUINCY) to mile marker 65, 16 miles west of Deming.
Description: Roadwork~~~Mountain States Construction, Inc. (Contractor) will be continuing the roadway rehabilitation project on Interstate 10 from milepost 55 (Quincy) to milepost 65 (16 miles west of Deming). Drivers can expect various daytime lane closures on both the eastbound and westbound lanes as needed. Currently, the contractor is paving the westbound lanes, Subcontractors are working on placing concrete barrier walls and guardrail. Contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2023-02-06 10:58:17.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad.
Description: Roadwork~~~Roadwork for intersection lighting will begin on August 2nd, 2022 on US 285 from mm 38.5 to mm 42 (North of Carlsbad). There will be lane restrictions (780’ taper with drums) during the day from 6:00 AM to 6:00 PM with traffic control being taken off the road at the end of the work day. This is a 60 day project with estimated completion being September 2022. Contractor: Bixby Electric; Project Manager: Erin Millwood (505)263-3421 Superintendent: Russell Critchell (505)238-3595; TCS Trae Baldwin (505) 379-8058. NMDOT PM Brian Torres (575) 626-4278.
Post Date: 2022-07-29 12:13:40.0
Update Date: 2022-09-01 15:22:31.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Alert, I 10 at mile marker 61, 20 miles west of Deming.
Description: Alert~~~The Gage Rest Area is closed due to water issues.
Post Date: 2023-02-24 06:49:14.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Construction Closure, NM 337 northbound and southbound at mile marker 10 Chilili.
Description: The New Mexico Department of Transportation is rebuilding bridge. Motorist should anticipate delays
Post Date: 2023-01-20 09:46:45.0
Update Date: 2023-03-10 08:06:54.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 123, Carrizozo. , right shoulder, and left shoulder
Description: Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667~~~
Post Date: 2022-02-18 11:01:42.0
Update Date: 2022-07-22 09:47:34.0
Expiration Date: unknown
Title: Fair Driving, NM 174 from mile marker 1 to mile marker 3.
Description: Fair Driving Conditions~~~
Post Date: 2023-03-17 20:21:35.0
Update Date: 2023-03-18 08:38:45.0
Expiration Date: unknown
Title: Closure, NM 536 from mile marker 1 Sandia Park to mile marker 13 Sandia Crest.
Description: Closure - Roads are snow packed and icy.~~~Please be advised that NM 536 at mile marker 1 is closed in both directions due to winter weather conditions. The entire roadway will be closed. Updates will be made as conditions change.
Post Date: 2023-03-17 15:38:05.0
Update Date: 2023-03-17 15:38:05.0
Expiration Date: unknown
Title: Fair Driving Conditions exist in the Cuyamungue area.
Description: Fair Driving Conditions - Roads are wet and may become slick.~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2023-03-17 11:44:33.0
Update Date: 2023-03-20 08:11:46.029
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 161, 1 mile west of Organ to mile marker 151, Las Cruces.
Description: Roadwork~~~Mountain States Construction, Inc. (Contractor) will continue with the roadway rehabilitation project on US 70 from milepost 143 (I-10 /US 70 Interchange) to milepost 161 (Organ). Drivers can expect various lane closures on the frontage road and intersections on all eastbound and westbound lanes from Nasa Rd. to Del Rey Blvd. Sunday, March 19, 2023, crews will be continuing nighttime roadwork on Sonoma Ranch Blvd. & later in the week Rinconada Blvd. intersections. Crews will also be crack sealing on Bataan Memorial Frontage Road with one lane closed as needed. During milling and paving operations lanes will be closed nightly for each lane of travel, traffic can travel to the next intersection to turn around. Contractor’s hours of operation will be from 8 p.m. to 6 a.m., Sunday through Thursday. Drivers should expect delays and plan accordingly.
Post Date: 2023-02-17 14:09:19.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Lane Closure, I 25 from mile marker 102, 23 miles north of T or C to mile marker 175, Bernardo (US 60/MOUNTAINAIR).
Description: Lane Closure~~~J-H Supply, Co. (Contractor) will be continuing a guardrail and end treatment project along I-25 in Socorro County from milepost 102 to 175. Motorists can expect lane closures in the northbound lanes from milepost 117 to 119 with a passing left lane closure, southbound lanes are open. Overnight lane closures should be expected. Hours of operation are from 7 a.m. to 5 p.m., Monday through Friday. Construction is expected to be completed by Spring 2024.
Post Date: 2023-02-17 14:06:00.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Roadwork, US 62 at mile marker 32, Carlsbad.
Description: Roadwork~~~Road construction is underway for intersection realignment on US 62/180 at mm 32 (intersection of Hidalgo Rd). Beginning January 20th, 2023 until January 30th, 2023 the turning lanes along with both north and southbound inner passing lanes will be closed. Traffic will be routed to the outside north and southbound lanes. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be completed end of March 2023, weather permitting. Brian Torres, NMDOT Project Manager (575) 626-4278; Rick Castillo, NMDOT Construction Traffic Control Supervisor (512) 630-3554; Contractor, Constructors Inc.
Post Date: 2022-07-15 10:28:04.0
Update Date: 2023-01-20 12:00:58.0
Expiration Date: unknown
Title: Fair Driving, NM 211 at mile marker 3.
Description: Fair Driving Conditions~~~NM 211 “Bear Creek” at milepost 3.5 has water running over the roadway, roadway is still passable. When the roadway is flooded do not cross and seek an alternate route. NMDOT is currently monitoring and will notify as conditions change.
Post Date: 2023-03-10 07:30:32.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Roadwork, NM 404 from mile marker 1 to mile marker 9.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor), will be continuing the roadway reconstruction and lighting project on NM 404 from milepost 0.9 (Anthony) to milepost 8.8 (Chaparral). Currently, the contractor is installing drainage structures, subgrade preparations and paving. Subcontractors are working on concrete box culverts and installing game fence. The speed limit has been reduced to 45 MPH for the safety of the traveling public. Contractor’s hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday, some Saturdays as needed. Our next Public Meeting will be March 20th at 6 pm at the DACC Anthony Location, all are invited.
Post Date: 2022-12-09 13:32:21.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Roadwork, NM 83 from mile marker 0, Lovington to mile marker 1, 1 mile east of Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US83 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. Traffic Control has been removed from the downtown area. The road has been closed off and Traffic Control has been placed on HHY82 from Main to past Commercial. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 410 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on HWY 83 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drivepads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2104340 project: Contractor: Constructors, Inc., Project Manager- Gabriel Ortega (575) 496-9397, Superintendent-James King (575) 885-8838. Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938, Project Safety Office- Tami Mandel (505) 697-1787- Project RRO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2023-03-09 17:01:48.0
Expiration Date: unknown
Title: Alert, NM 152 from mile marker 15, San Lorenzo to mile marker 40, Kingston.
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2023-03-03 14:03:42.0
Update Date: 2023-03-20 06:50:38.949
Expiration Date: unknown
Title: Roadwork, NM 173 from mile marker 2 to mile marker 4.
Description: Roadwork~~~Work begins on 6/6/2022 on a project that will include roadway reconstruction, improved drainage structures, erosion control & revegetation, new right-of-way fencing, and permanent signing and striping. One lane will be closed for the duration of the project, and there will be a width restriction limit for all vehicles of 9 feet. Work will take place Monday through Friday, from 7am until 4:30pm each day. The contractor, AUI Inc., expects to have the project completed in November 2022.
Post Date: 2022-06-03 10:55:55.0
Update Date: 2022-11-08 07:56:56.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 16, Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, will be working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2023-03-16 15:33:49.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Unknown Precip Fog/Mist 33°F
29.85in
Barometer
100%
Humidity
South 10.4mph
Wind
Unknown Precip Fog/Mist

More Local Information

Bookmark and Share

Traffic Nearby

Los Alamos weather and traffic updates by locals

Write your own Los Alamos, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Los Alamos, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Los Alamos, NM report and/or forecast will be removed by a moderator.