Los Alamos, NM Traffic and Road Conditions

Los Alamos Traffic Map

No Traffic Flow? Zoom in Closer or Refresh

How to use the Los Alamos Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

Traffic Incidents (beta): Each dot represents a traffic event or incident such as road construction, closure or accident. At closer zoom levels, those dots can be pressed to see more info. Once a layer of traffic info has popped-up, be sure to press/click any additional arrows (e.g. 1 of 3) in the top right above the title to see other the details of the impact.

Impact Legend: Traffic and Road Incident Icon - Critical Impact Critical Traffic and Road Incident Icon - Major Impact Major Traffic and Road Incident Icon - Minor Impact Minor Traffic and Road Incident Icon - Low Impact Low

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Los Alamos Traffic Alerts

Title: Alert, NM 120 from mile marker 0 Black Lake to mile marker 17 Ocate.
Description: Alert~~~NM 120 from mile marker 0 (Black Lake) to mile marker 17 (Ocate) may become impassable during inclement weather which is potential for significant and hazardous travel. Please proceed at your own risk.
Post Date: 2020-01-29 08:23:01.0
Update Date: 2020-05-26 11:41:11.0
Expiration Date: unknown
Title: Roadwork, NM 549 at mile marker 31.
Description: Roadwork~~~Hasse Contracting Co., (Contractor) will have a lane closure in place for roadway and bridge repairs on NM 549 milepost 31, this is the bridge located at I-10 milepost 116. The speed limit is reduced for the safety of the crew. Closure are expected to be completed by June 15, 2020, weather pending. Hours of operation will be from 7:00 a.m. until 5:00 p.m. Monday through Friday.
Post Date: Wed May 27 11:47:47 MDT 2020
Update Date: 2020-06-05 15:31:29.0
Expiration Date: Mon Jun 15 17:00:00 MDT 2020
Title: Closure, US 64 at mile marker 252 Taos Pueblo.
Description: Closure~~~ As Per Mr. Mondragon LT. Governor, ALL TAOS PUEBLO WILL BE CLOSED FOR EVERYONE WHO IS NOT RESIDENTIAL. Be advised the ONLY entrance open to residents is through Veterans Highway, which will be monitored by law enforcement. (ONLY TRIBAL RESIDENTS). Safety precautions during the COVID-19
Post Date: 2020-03-25 15:33:33.0
Update Date: 2020-03-25 15:33:33.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 39, Ciniza Refinery Interchange to mile marker 42, 16 miles east of Gallup.
Description: Roadwork~~~Roadwork on I-40 from mile marker 39-42 (Ciniza Refinery). Westbound I-40 will be reduced to one lane with access to Exit 39. Eastbound will have 2 lanes open to traffic. Speed reduced to 55mph through the work zone. PLEASE BE COURTEOUS AND USE ZIPPER MERGE TO REDUCE CONGESTION AND DELAYS. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-03-25 08:01:21.0
Update Date: 2020-06-02 09:58:02.83
Expiration Date: unknown
Title: Seasonal Closure, NM 72 from mile marker 0 to mile marker 36.
Description: Seasonal Closure~~~SEASONAL CLOSURE ON NM 72. ONLY USED FOR LOCAL TRAFFIC!
Post Date: 2019-10-23 09:01:30.0
Update Date: 2019-10-23 09:01:30.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 4, 4 miles east of Arizona state line to mile marker 5, Manuelito.
Description: Roadwork~~~Roadwork on I-40 from mile marker 4-5 (Manuelito). East and westbound traffic will be reduced to one lane. Eastbound traffic will be diverted onto the westbound passing lane via median crossover. Speed reduced to 55 mph through the work zone. PLEASE USE ZIPPER MERGE AND BE COURTEOUS TO REDUCE DELAYS. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-01-22 09:04:04.0
Update Date: 2020-06-02 09:58:02.83
Expiration Date: unknown
Title: Alert, NM 456 from mile marker 0 Folsom to mile marker 55.
Description: Alert -- 12 miles are unpaved along this roadway -- impassable during inclement weather proceed at your own risk.~~~NM 456 from mile marker 0 (Folsom) to mile marker 55 may become impassable during inclement weather which is potential for significant and hazardous travel. 12 miles are unpaved along this roadway, Please proceed at your own risk.
Post Date: 2018-11-21 11:15:38.0
Update Date: 2020-05-26 11:41:40.0
Expiration Date: unknown
Title: Roadwork, US 64 eastbound from mile marker 406 to mile marker 418.
Description: Roadwork~~~US 64 eastbound from mile marker 406 to mile marker 418. The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway performing road maintenance. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change
Post Date: 2020-05-26 12:04:57.0
Update Date: 2020-05-26 12:04:57.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 420, 6 miles north of Springer to mile marker 424, 10 miles north of Springer. Right lane and right shoulder closed.
Description: Roadwork~~~I-25 northbound from mile marker 420, 6 miles north of Springer to mile marker 424, 10 miles north of Springer. Right lane and right shoulder closed. The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway performing road maintenance. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change. (4101330)
Post Date: 2020-05-26 11:54:32.0
Update Date: 2020-05-26 11:56:26.0
Expiration Date: unknown
Title: Lane Closure, NM 267 from mile marker 27 to mile marker 32.
Description: Lane Closure~~~NMDOT crews will be brooming on NM 267 from mm 27 to mm 32 (Floyd area). Motorists should expect intermittent lane closures with pilot car operations and traffic control. Please use caution, reduce speed and watch for all personnel and equipment in the area. NMDOT contacts are Richard Marquez (575) 840-9796 and Robert Canelo (575) 626-2095.
Post Date: Tue May 26 09:01:48 MDT 2020
Update Date: 2020-06-05 08:39:16.0
Expiration Date: unknown
Title: Difficult Driving, NM 78 from mile marker 2 to mile marker 8.
Description: Difficult Driving Conditions - Standing water on roadway. Use extreme caution.~~~NM 78 from mile post 2 to 8 the roadway has water running along dips, with debris due to rain and flooding. NMDOT is informing of pothols in low water crossing, please cross with caution. Seek alternate route if possible, the NMDOT will continue to monitor.
Post Date: 2020-01-21 12:45:34.0
Update Date: 2020-06-05 08:49:04.641
Expiration Date: unknown
Title: Roadwork, NM 11 at mile marker 3 Columbus.
Description: Roadwork~~~Deming Excavation Inc. (Contractor) will have a lane closures and shoulder work on the intersections of NM 11 and Broadway Ave, Main St. and NM 9 for reconstruction. Construction is scheduled to begin on Monday April 20, 2020 lasting until August 2020. The speed limit is reduced for the safety of the crew, access and turning restrictions will be in place. Hours of operation will be from 6:00 a.m. until 5:00 p.m. Monday though Friday.
Post Date: 2020-04-21 08:09:05.0
Update Date: 2020-06-05 08:49:04.641
Expiration Date: unknown
Title: Roadwork, US 491 from mile marker 32 Buffalo Springs to mile marker 37.
Description: Roadwork~~~Roadwork on US 491, mile marker 32-37 (from Buffalo Springs to Naschitti). Traffic reduced to one lane in both directions. Please plan accordingly to avoid delays. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-03-17 10:46:27.0
Update Date: 2020-06-02 09:58:02.83
Expiration Date: unknown
Title: Alert, NM 124 eastbound and westbound from mile marker 0 to mile marker 8.
Description: Alert~~~NM 124 HAS A PERMANENT HEIGHT RESTRICTION IN PLACE. All CMV's and high profile vehicles are PROHIBITED on NM 124, from mile marker 0-8 (from Skyway at Exit 89 to McCartys at Exit 96) due to a low 13' clearance of a concrete box culvert and no turn-around space. This event will be updated as conditions change.
Post Date: 2020-01-14 15:29:13.0
Update Date: 2020-06-02 09:58:02.83
Expiration Date: unknown
Title: Roadwork, NM 188 from mile marker 0 Mesilla Park to mile marker 2.
Description: Roadwork~~~AUI, Inc. (Contractor) is currently finalizing roadway reconstruction, utility replacements and lighting/signalization improvements on Valley Drive. The project is in the final phase of construction so there will be multiple lane closures in both directions to accommodate the last striping and landscaping on the project. Construction will be 7:00 am to 5:00 pm, 5 days a week. Visit www.valleydrive.net.
Post Date: 2019-06-27 08:28:16.0
Update Date: 2020-06-05 08:49:04.641
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 288 Tinnie to mile marker 300.
Description: Roadwork~~~Construction is underway between MP 288 to MP 300 in between Tinnie and Roswell on US 70. Construction will consist of Guardrail Installation. Traffic is down to one lane and the East bound driving line is closed.The Speed Limit is reduced to 35 MPH applying to the Construction Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in the Spring of 2020. NMDOT Project Office 575-840-3566; Aaron Clark NMDOT Project Manager 575-626-9817; Marvin Clements Villalobos Construction 575-993-3931.
Post Date: 2019-09-26 14:25:49.0
Update Date: 2020-05-29 07:43:35.0
Expiration Date: unknown
Title: Roadwork, US 70 at mile marker 229 Alamorosa.
Description: Roadwork~~~Construction is underway between MP 228 to MP 229 in Tularosa on US 70. Construction will consist of roadway Rehabilitation, and Signalization. Traffic is down to one lane in this area.The Speed Limit is reduced to 35 MPH with DOUBLE FINE ZONE applying to the Construction Work Zones. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in the Spring of 2020. NMDOT Project Office 575-840-3566; Aaron Clark NMDOT Project Manager 575-626-9817; Dan Lurtsema Mesa Verde Project Manager 575-491-3048
Post Date: 2019-09-26 13:54:29.0
Update Date: 2020-03-26 07:40:49.0
Expiration Date: unknown
Title: New Mexico 18 from mile marker 0 to mile marker 7
Description: Roadwork~~~Construction is expected to begin on February 24, 2020 with an expected completion in June 2020. Construction will be from the State Line MP 0.00 to MP 7.076, it will consist of milling and paving operations. Traffic may go down to one lane with a pilot truck. The speed limit will be reduced to 35 MPH. Motorist should obey all construction signing and watch for construction personnel and equipment. NMDOT Carlsbad Project Office 575-808-9548 NMDOT Project Manager, Willie McCray Jr. 575-626-9882 Project Manager for Constructors Inc., Gabriel Ortega 575-496-9397.
Post Date: 2020-02-20 10:29:30.0
Update Date: 2020-05-01 06:47:59.0
Expiration Date: unknown
Title: Construction Closure, I 25 at mile marker 193, Belen.
Description: Construction Closure~~~I-25 NB & SB milepost 191 to 195 (Project A302160 FDR) Thru November 11 from 6:30 AM to 6 PM motorists can anticipate various lane and shoulder restrictions both northbound and southbound Work is being performed for interstate repaving. Contractor: Mountain States Inc NMDOT Project Manager: Isaac Chavez
Post Date: Thu May 14 16:28:53 MDT 2020
Update Date: 2020-06-05 08:24:51.0
Expiration Date: Fri Jun 12 23:45:00 MDT 2020
Title: Roadwork, US 82 from mile marker 170 to mile marker 172.
Description: Roadwork~~~ADA construction is underway in Lovington between MP 170.713 and 171.374 for work on the sidewalks and turnouts. Traveling public should expect delays. Please proceed with caution, obey all posted signs, and be on the watch for construction crews and equipment. The Speed Limit through the work zone will be reduced to 35 MPH. There is a width restriction of eleven feet (11’) in place. This project is 400 working days with the expected completion date in July 2020. Contractor: Constructors, Inc., Superintendent-Dave Sampson (623) 249-0070. Traffic Control Supervisor-Don Foreman (575) 706-0325. NMDOT Project Manager-Patrick Lopez (575) 626-9872, ETSII-John Lara (575) 575-9625. Emergency Contact List for Lovington 2103100 Constructors Inc. Project Manager- Gabriel Ortega (575) 496-9397 Superintendent- Dave Sampson (623) 249-0070 Traffic Control Supervisor- Don Foreman (575) 706-0325 Project Safety Office- Tami Mandel (505) 697-1787- Project RRO Officer- Kelly Hicks (575) 302-8408- NMDOT Patrick Lopez (575) 626-9872 John Lara (575) 840-9625
Post Date: 2019-11-07 09:36:10.0
Update Date: 2020-06-03 07:09:32.499
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 107 Artesia to mile marker 139. , right shoulder, and left shoulder
Description: Roadwork~~~Roadwork~~Roadway Construction is underway East of Artesia on US 82 between MP 107.65 to MP 139.07. Motorists can expect a one lane closure with pilot car between MP 114 and MP 120 for work on drainage structures and utilities; from MP 123 to MP 132 for earthwork operations; Utility work on the shoulder between MP 117 and MP 130. Motorists should expect delays-one lane of traffic controlled by pilot car during the day. Junction of NM 529 and US 82 Construction re-alignment posted speeds are 35 throughout this intersection. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Speed Limit through the Work Zones will be REDUCED to 35 MPH. The Maximum Posted Speed Limit during construction will be 55 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 540 working days. Expected completion date is to be determined at a future date. Contractor has returned from winter suspension. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Randy Lueras (575) 626-8938.
Post Date: 2020-01-02 12:39:45.0
Update Date: 2020-06-03 07:09:32.499
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 55 to mile marker 62. Right lane closed.
Description: Roadwork~~~Guardrail replacement is underway between mm 55 and 62 between Omlee and Valmont on US 54. This is a safety improvement project consisting of guardrail upgrades. Motorists should expect a right lane closure in the Northbound lane during the entirety of the project. The Speed Limit is reduced to 45 MPH with DOUBLE FINE ZONE applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in August of 2020. Arron Clark NMDOT Project Manager 575-626-9817; Contractor Villalobos Construction Co. Inc. 575-993-3930; Traffic Control Supervisor Marvin Clements 575-993-3931.
Post Date: 2019-08-01 16:06:56.0
Update Date: 2020-03-26 07:40:38.0
Expiration Date: unknown
Title: Weather Alert, US 64 eastbound and westbound from mile marker 350 to mile marker 430 Clayton.
Description: Weather Advisory - High Winds - High profile vehicles use extreme caution.~~~US 64 eastbound and westbound from mile marker 350 to mile marker 430 Clayton. Weather Advisory - High Winds - High profile vehicles use extreme caution. Please reduce speed and drive with caution. This event will be updated as conditions change.
Post Date: 2020-06-06 09:55:57.0
Update Date: 2020-06-06 09:55:57.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 1, (UNIV PARK/NMSU) to mile marker 2, 2 miles north of I10/I25.
Description: Roadwork~~~La Calerita Construction, LLC (Contractor) will be continuing roadwork on I-25 and University. Through about June 2, 2020, the northbound I-25 off-ramp to University Ave. is CLOSED. I-25 northbound traffic is detoured to E. Lohman to exit I-25. Eastbound and westbound traffic on I-10 is detoured to the I-10 University exit to access University Ave. The right lane of northbound I-25 remains closed from Geothermal Drive to the northbound I-25 loop ramp. Traffic on University Ave. between Don Roser and the northbound I-25 off-ramp is reduced to one lane in east direction (eastbound and westbound). The free righthand turn lane from the southbound I-25 off-ramp to westbound University Avenue is PERMANENTLY CLOSED, access is provided at the traffic signal at the intersection of the ramp and University Ave. Regular work hours will be Monday through Friday from 7:00 am to 5:30 pm, traffic control will remain in place 24/7. Questions or concerns: visit www.i25-university.com.
Post Date: 2019-12-30 11:22:17.0
Update Date: 2020-06-05 08:49:04.641
Expiration Date: unknown
Title: US 60 eastbound and westbound from mile marker 385 to mile marker 387
Description: Roadway Rehabilitation, Signalization, and Lighting project on US 60/84 from MP 385.500 to MP 386.560. K Barnett and Sons will be performing Mill and Inlay on US60/84 as well as Waterline Utility work in conjunction with EPCOR. Westbound Lanes will be closed with traffic being shifted to the Eastbound Lanes. Will have one Eastbound Lane and one Westbound Lane. There will be a 12ft width restriction and traffic will be reduced to 25 MPH. Wide and Oversized Loads please seek alternate route and expect delays. Please aware of personal/equipment in the roadway and follow posted signs. Expected Completion Fall of 2020. Contractor: K Barnett & Sons Superintendent Deole Hill (575)749-8093 NMDOT: Project Manager Thomas McAlister (575)840-8853
Post Date: 2020-01-27 16:22:02.0
Update Date: 2020-05-22 13:03:24.0
Expiration Date: unknown
Title: New Mexico 108 southbound and westbound from mile marker 7 to mile marker 18
Description: Bridge Replacement and Roadway Reconstruction NM 108 on Bridges located at MP 7.64 and MP 18.168. Bridge at MP 18.168 will be restricted to one 12ft drive lane with temporary Traffic Signals in place so wide or oversized loads please seek alternate route. Speed Limit also reduced to 35 MPH. Bridge at MP 7.64 will be closed to all traffic during construction. Please follow posted detour route and expect delays. Please be aware of personal and equipment near/around the work zone and follow posted construction signs. Work on bridges is expected to be completed in December 2020. Contractor: EL Terrero Construction Superintendent Matt Villalobos (505)896-3864 Traffic Control Supervisor Mark Martinez (505)796-2674 NMDOT: Project Manager Thomas McAlister (575)840-8853
Post Date: 2020-01-27 15:57:03.0
Update Date: 2020-05-22 13:03:35.0
Expiration Date: unknown
Title: Alert, NM 513 at mile marker 0.
Description: Alert~~~Closure The New Mexico Department of Health (NMDOH) has detected community spread in the state. Salinas National Park is CLOSED DUE TO COVID-19.
Post Date: 2020-03-23 13:40:40.0
Update Date: 2020-03-23 13:40:40.0
Expiration Date: unknown
Title: Lane Closure, NM 502 westbound from mile marker 1 Los Alamos to mile marker 2.
Description: Lane Closure~~~Westbound Trinity Drive (NM 502) will have one lane closed from DP Drive to Knecht Street. Construction is scheduled to start on 5/18/2020 and last for four weeks. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2020-05-18 07:21:12.0
Update Date: 2020-05-18 07:21:12.0
Expiration Date: unknown
Title: Roadwork, I 10 at mile marker 50, 25 miles east of Lordsburg.
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will be continuing bridge replacement and roadway reconstruction on NM 146 “Hatchita Bridge” at I-10 milepost 49. The Bridge is CLOSED, detour will be in place on the frontage road, Separ exit 42 and frontage road, Quincy exit 55. Traffic is switched into the westbound lanes at this time. An 11 foot width restriction will be in place. Contractor’s hours of operation will be from 7:00 am to 5:00 pm Monday to Friday; lane closures and traffic control shall remain in place 24 hours a day 7 days a week.
Post Date: 2020-03-16 09:16:45.0
Update Date: 2020-06-05 08:49:04.641
Expiration Date: unknown
Title: Closure, Closure
Description: Closure~~~SANTO DOMINGO PUEBLO WILL BE CLOSED FOR EVERYONE WHO IS NOT RESIDENTIAL. Be advised the ONLY entrance open to residents, which will be monitored by law enforcement. (ONLY TRIBAL RESIDENTS). Safety precautions during the COVID-19
Post Date: 2020-04-13 16:26:37.0
Update Date: 2020-04-13 16:26:37.0
Expiration Date: unknown
Title: Roadwork, NM 68 southbound from mile marker 44 to mile marker 43.
Description: Roadwork~~~ROADWORK IN THE SOUTHBOUND LANE WILL TRANSITION INTO TURNING LANE
Post Date: 2020-04-13 07:53:05.0
Update Date: 2020-04-13 07:53:05.0
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 269, La Bajada to mile marker 277, 1 mile south of Santa Fe.
Description: Roadwork~~~Through November 13, 2020, I-25 northbound and southbound from La Bajada to just South of Cerrillos road will have intermittent lane closures for a Mill and Overlay project. Two Lanes of traffic will be open on I-25 northbound between the hours of 7:00 AM to 9:00 AM and southbound between the hours of 4:00-6:00 pm to accommodate peak commute times. Contractor: Albuquerque Asphalt Project Manager: Jared Rodriguez
Post Date: 2020-03-09 10:32:23.0
Update Date: 2020-03-09 10:32:23.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~I-40 eastbound on-ramp 333. The New Mexico Department of Transportation - District Four will have road construction on I-40 on-ramp 333 starting on April 6th. Ramp to access I-40 is still accessible, the traveling public is advised to expect minor delays and obey all posted road signs.
Post Date: 2020-04-06 08:47:58.0
Update Date: 2020-05-26 11:37:44.0
Expiration Date: unknown
Title: Lane Closure, US 64 eastbound and westbound from mile marker 185 to mile marker 194.
Description: Lane Closure~~~Repaving work will require one lane to be closed between MM 185 through to MM 194. A pilot car will be in place to escort vehicles through the roadwork zone. Roadwork will be occurring between 7 am and 7 pm each day, weather permitting. This project is expected to be completed June 30th.
Post Date: 2020-05-29 13:37:32.0
Update Date: 2020-05-29 13:37:32.0
Expiration Date: unknown
Title: Lane Closure, NM 502 eastbound and westbound from mile marker 0 to mile marker 1 Los Alamos.
Description: Lane Closure~~~The left lanes will be closed in each direction (including the center turning lane) from Diamond Drive to Knecht Street for repaving. Once these lanes are completed they will be reopened and the repaving will begin on the right lanes. This project is expected to be completed by June 5, weather permitting.
Post Date: 2020-05-29 13:32:34.0
Update Date: 2020-05-29 13:32:34.0
Expiration Date: unknown
Title: Roadwork, US 54 northbound and southbound from mile marker 118 to mile marker 124.
Description: Roadwork~~~Construction is underway between MP 118 to MP 224 near Carrizozo on US 84. Construction will consist of Bridge Rehabilitation.The Speed Limit is reduced to 45 MPH applying to the Construction Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in the Fall of 2020. NMDOT Project Office 575-840-3566; Aaron Clark NMDOT Project Manager 575-626-9817; Marvin Clements Villalobos Construction 575-993-3931.
Post Date: 2020-05-29 07:43:18.0
Update Date: 2020-05-29 07:43:18.0
Expiration Date: unknown
Title: Roadwork, NM 187 from mile marker 0 Hatch to mile marker 6.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) has completed paving operations. Lanes closure will be in place for guardrail installation along NM 187 “El Camino Real” from milepost o.9 to milepost 6. Traffic can expect a pilot car operation during working hours. An 11 foot with restriction is in place. Contractor’s hours of operation will be from 7:00 am to 5:00 pm Monday to Friday.
Post Date: 2020-02-28 13:16:21.0
Update Date: 2020-06-05 08:49:04.641
Expiration Date: unknown
Title: Roadwork, NM 187 from mile marker 15 to mile marker 16.
Description: Roadwork~~~Hasse Contacting Company, Inc. (Contractor) has begun the replacement of Bridges located in Arrey. The first bridge is located at milepost 15.4 near the Caballo Dairy; the second bridge is located at milepost 16.09 near Agua Fria Road over the Montoya Arroyo. Both bridges have a detoured bypass at their locations; a 12 foot width restriction will be in place. Contractor’s hours of operation will be from 7:00 am to 5:00 pm Monday to Friday; lane closures and traffic control shall remain in place 24 hours a day 7 days a week.
Post Date: 2020-03-27 15:21:04.0
Update Date: 2020-06-05 08:49:04.641
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 175, Bernardo (US 60/MOUNTAINAIR) to mile marker 19, (NM 157/RADIUM SPRINGS).
Description: Roadwork~~~San Bar Construction Corp. (Contractor) will begin replacing signage along I-25. Traffic can expect shoulder work as needed. Contractor’s hours of operation will be from 7:00 am to 5:00 pm Monday to Friday. Construction is expected to be completed by fall 2020.
Post Date: 2020-03-27 15:12:08.0
Update Date: 2020-06-05 08:49:04.641
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: US 70 from mile marker 427 to mile marker 440
Description: Roadwork~~~US 70 Pavement Resurfacing from MP 427.7-440.6. Cutler is performing mill and inlay on Southbound Lanes with traffic being reduced to one lane in workzone area. Speed limit is also reduced in workzone so expect delays. Please follow all posted signs and be aware of personal/equipmetn in work area. Please be cautious as there is minimal striping or tabs dividing lanes. NMDOT Portales Project Manager Thomas McAlister (575)840-8853 or Cutler Superintendent Shane Crawford (785)766-6957.
Post Date: 2019-07-26 11:45:46.0
Update Date: 2020-05-22 13:03:30.0
Expiration Date: unknown
Title: US 70 westbound from mile marker 359 to mile marker 348
Description: Braiser Asphalt will be performing Nova Chip Mill and Inlay on Westbound Lanes. Traffic will be reduced to one lane in the workzone and speed limit will be reduced to 50MPH so expect delays. Please follow all posted signage. Maintain awareness of all personal and equipment in the work area. Expected completion date depending on weather is end of June 2020. Braiser Asphalt - Joe Mendoza (505)977-3811 NMDOT Project Manager - Thomas McAlister (575)840-8853
Post Date: 2020-05-22 13:02:55.0
Update Date: 2020-05-22 13:02:55.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 68 to mile marker 70.
Description: Roadwork~~~Project on US 285 between MP 68.1 to 70.4 - Richey to Hermosa Street. Expect one lane closures throughout the ADA project on both the south bound and north bound lanes. There will be a detour at the intersection of Hermosa and US 285 once the installation of the new traffic signal begins. CONTACT INFORMATION: Project Manager - Gabe Ortega 575-496-9397 Traffic Control Supervisor - James Atkinson 575-937-4667 NMDOT Project Manager - Donna Gililland 575-626-4857
Post Date: 2020-01-17 11:10:49.0
Update Date: 2020-05-21 08:07:24.0
Expiration Date: unknown
Title: Roadwork, NM 6563 from mile marker 0 to mile marker 15 Sunspot.
Description: Roadwork~~~New sign installations are underway on NM 6563 between mm 0 to mm 14.88 (Sunspot). Motorists can expect lane drops on the curves with pilot car operations. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. This Project is 60 working days. Expected completion is summer 2020. Contractor: Highway Supply; Traffic Control Supervisor- Juan Ocana (505) 415-2902; NMDOT Project Manager- Brian Torres (575) 626-4278.
Post Date: 2020-04-17 15:54:58.0
Update Date: 2020-04-17 15:54:58.0
Expiration Date: unknown
Title: Alert, US 82 at mile marker 16 Cloudcroft.
Description: Alert~~~US 82 between Cloudcroft and Alamogordo descends 5000 feet in 16 miles! STEEP GRADES, NUMEROUS TIGHT TURNS AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82.Consider using and alternate route- US 62/180 or US 70. THIS IS A PERMANENT ALERT. (lc).
Post Date: Fri Jan 10 08:17:34 MST 2020
Update Date: 2020-06-05 08:48:03.63
Expiration Date: unknown
Title: Closure, Closure
Description: Closure~~~Jemez Pueblo is CLOSED TO ALL NON-RESIDENTS due to COVID-19 precautions and orders issued by Jemez Pueblo.
Post Date: Fri Apr 10 09:58:50 MDT 2020
Update Date: 2020-06-02 09:58:25.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 324 to mile marker 326 Logan.
Description: Roadwork~~~Bridge and Roadway Construction beginning November 8th 2019 continuing through May 31st 2020. All work will be performed 7am to 5pm. Reduce Speed through the work zone. Please drive with caution and obey all posted traffic signs. This event will be updated as conditions change. Follow all posted traffic signs.
Post Date: 2019-11-08 15:55:26.0
Update Date: 2020-05-26 11:38:13.0
Expiration Date: unknown
Title: Roadwork, NM 229 from mile marker 5 to mile marker 6.
Description: Roadwork~~~There will be construction of a concrete box culvert at the south side of the intersection of US. 82 and 229 Haldeman. The Intersection will be closed. Detour around using CR 59 (Bolton) or CR 58 (Vogel) to CR 57 (Hermosa). The intersection will be closed until the completion of the concrete box culvert. Contractor Contacts. Felipe Tenorio (505-249-5138), Raymond Reeves (505-373-7314). NMDOT Contacts. Ernest Lueras (575-626-8938), John Lara (575-840-9625)
Post Date: 2020-05-01 08:15:35.0
Update Date: 2020-06-03 07:09:32.499
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Mostly Cloudy 58°F
30.18in
Barometer
81%
Humidity
North 0.0mph
Wind
Mostly Cloudy

More Local Information

Bookmark and Share

Traffic Nearby

Go Ad Free - Become a Member

Los Alamos weather and traffic updates by locals

Write your own Los Alamos, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Los Alamos, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Los Alamos, NM report and/or forecast will be removed by a moderator.