Mesilla Traffic and Road Conditions

Mesilla Traffic Map

No Traffic Flow? Zoom in Closer

How to use the Mesilla Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic or no traffic*. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

* In known extreme weather events or accidents, the map provider may still show green lines, even if lanes or the entire road is closed.

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Mesilla Traffic Alerts

Title: Alert, NM 159 from mile marker 4, 4 miles east of US 180 to mile marker 25, Willow Creek Campground.
Description: NM 159 from milepost 4 to milepost 25 (Willow Creek Campground). STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 46 feet in length are PROHIBITED on this section of NM 159. Trucks longer than 30 feet are highly encouraged to utilize a pilot vehicle. Consider using an alternate route - US 180 to NM 12 to NM 435 (NF-141). THIS IS A PERMANENT ALERT.~~~
Post Date: 2022-11-23 07:06:02.0
Update Date: 2024-05-23 07:01:20.0
Expiration Date: unknown
Title: Lane Closure, I 40 eastbound at mile marker 338, 2 miles east of Tucumacari.
Description: Lane Closure - Roads are dry. Visibility is good with clear skies.~~~Maintenance east bound right lane closure, mile marker 338 closed due to construction maintenance personnel and equipment on the roadway performing construction work. construction work will be performed until 5pm. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-05-22 09:24:58.0
Update Date: 2024-05-22 09:24:58.0
Expiration Date: unknown
Title: Roadwork, NM 244 at mile marker 6, 6 miles east of of US 82.
Description: Roadwork~~~Cattleguard repair on NM244 MM6. Stop and go traffic control at location. Motorists are to expect delays or are to seek alternate route. Please reduce speed and follow traffic control signage and flaggers. Watch for NMDOT crews and vehicles on roadway.
Post Date: 2024-05-22 07:19:53.0
Update Date: 2024-05-23 13:51:59.0
Expiration Date: unknown
Title: Roadwork, US 84 from mile marker 198, Chili to mile marker 199, 1 mile north of Chili.
Description: Roadwork~~~Hasse Contracting is performing a bridge rehabilitation project on the bridge over the Rio del Oso. Work will include various improvements to the bridge deck and its supports, rechanneling the Rio del Oso under the center of the bridge, and the widening of U.S. 84 to include a left turn deceleration lane just north of the bridge. THERE IS A 10ft WIDTH RESTRICTION THROUGH THE WORK ZONE IN PLACE UNTIL FURTHER NOTICE. Work is expected to be completed by Fall 2024.
Post Date: 2024-04-17 10:43:36.0
Update Date: 2024-05-15 08:07:17.0
Expiration Date: 2024-09-06 17:01:00.0
Title: Roadwork, NM 532 from mile marker 7 to mile marker 11.
Description: Roadwork~~~NMDOT crews have began pavement overlaying operations on NM 532 from mm 7 to mm 11 (Ski Run Rd). Motorists should expect intermittent lane closures with traffic control. Please use caution, reduce speed, and watch for all personnel and equipment in the area. NMDOT contact is Ernie Trujillo (575) 808-0047.
Post Date: 2024-05-15 14:44:03.0
Update Date: 2024-05-16 11:24:09.0
Expiration Date: unknown
Title: Roadwork, NM 516 from mile marker 2 to mile marker 4.
Description: Roadwork~~~The New Mexico Department of Transportation, along with Cutler Repaving Inc., will begin a pavement rehabilitation project on Monday, May 6, 2024, in the Farmington area. Work will take place on N.M. 516 from 20th Street to English Road. The 1.5-mile project is expected to last 30 working days and will include new pavement and striping. Working hours will be from 6 a.m. until 6 p.m. each day, during which two lanes will be closed while crews are working on the roadway. All lanes will be reopened at the end of each day.
Post Date: 2024-05-15 12:15:16.0
Update Date: 2024-05-15 12:15:16.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 344, 2 miles east of Taiban to mile marker 345, 1 mile west of Tolar. Roadway closed.
Description: Roadwork~~~Bridge deck replacement is taking place on US60/84 from MP 344.479 to MP 344.713. In the workzone the speed limit is reduced to 45MPH expect delays. There is a 10ft width restriction no wide loads or oversized loads aloud must seek alternate route. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. Work is expected to be completed in the Summer of 2024, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-12 06:53:39.0
Update Date: 2024-05-16 10:34:11.0
Expiration Date: unknown
Title: Roadwork, NM 567 eastbound and westbound from mile marker 5, Carson to mile marker 6, 6 miles west of US 570. Roadway closed.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) and Hasse Contracting Co. Inc. will begin a roadway widening project on April 29, 2024, in Carson on N.M. 567 at mile marker 5 for approximately half a mile. This project will consist of the removal of existing hillside, placement of new asphalt pavement, safety enhancements, signing and striping. Starting on May 8, the roadway will be reduced to one lane throughout the construction zone. An electronic signal will be in place for the duration of the project. There will be a 8-foot width restriction in place as well. The contractor will be working Monday through Friday from 8 a.m. to 5 p.m. Motorists can expect delays during this time. Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. Updates on this project will be posted on the New Mexico Department of Transportation’s road advisory website, http://nmroads.com/.
Post Date: 2024-05-08 14:21:36.0
Update Date: 2024-05-08 14:21:36.0
Expiration Date: 2024-07-15 17:01:00.0
Title: Seasonal Closure, NM 159 from mile marker 12, 3 miles east of Mogollon to mile marker 22, 3 miles west of Willow Creek Campground.
Description: Seasonal Closure~~~The New Mexico Department of Transportation has closed the gates on NM 159 “Bursum Rd” for the upcoming winter months. Expected reopening is in June 2024. The lower gate is located at milepost 12.3, just past Mogollon, and the upper gate located at milepost 22.6, Willow Creek Campground. This closure is in place due to winter weather conditions making the roadway impassable. The traveling public is asked to use US 180 to NM 12 (Reserve) to NM 435 (Reserve Beaverhead Road) for access into Willow Creek, Snow Lake, and the Gila National Forrest. The NMDOT will monitor gates.
Post Date: 2024-01-03 09:30:20.0
Update Date: 2024-05-23 07:01:29.0
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 305, 21 miles north of Santa Fe to mile marker 309, 25 miles north of Santa Fe.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone.
Post Date: 2024-05-01 10:35:11.0
Update Date: 2024-05-01 10:35:11.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 149, Las Cruces to mile marker 150, Las Cruces.
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) is continuing a project to make roadway improvements to US 70 North Main Street between Spitz/N. Solano Drive and the intersection of N. Triviz Drive/Elks Drive. Traffic on the east side of US 70 North Main has one lane open from North Solano Drive to North Triviz Drive. Traffic in the area of the Alameda Arroyo is moved to the west side of the road with one lane in each direction. The speed limit is reduced to 35 miles per hour throughout the construction zone. For the safety of the traveling public, the Alameda Arroyo trail crossing remains CLOSED. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours are Monday-Friday 7 a.m.-5 p.m., although the contractor may work longer hours or on weekends if needed. Access will be maintained to all businesses and residences during construction. For more information or to sign up for construction updates, visit www.us70mainstreet.com.
Post Date: 2024-01-30 08:57:27.0
Update Date: 2024-05-23 07:01:46.0
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound at mile marker 44, Coolidge Interchange.
Description: Roadwork~~~Roadwork on I-40, mile marker 44 (Coolidge). Eastbound and Westbound passing lanes are closed. Speed reduced to 55 mph the construction zone. For more information contact El Terrero Construction at (505) 896-3864. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-04-30 13:48:15.0
Update Date: 2024-05-22 12:34:33.0
Expiration Date: unknown
Title: Alert, NM 120 from mile marker 3, 3 miles east of Black Lake to mile marker 12, 5 miles west of Ocate.
Description: Alert~~~Roadway has limited width clearance. Tree cover will produce prolonged icy and snow packed road conditions throughout winter and early spring, four-wheel drive vehicles are recommended.
Post Date: 2024-03-26 10:13:15.0
Update Date: 2024-03-26 10:13:15.0
Expiration Date: unknown
Title: Alert, US 64 from mile marker 273, 13 miles west of Eagle Nest to mile marker 276, 10 miles west of Eagle Nest.
Description: Alert~~~U.S. 64, between mileposts 273 and 276, motorists are advised to use caution and be alert for commercial traffic performing wide turns due to narrow curves.
Post Date: 2024-01-23 07:09:35.0
Update Date: 2024-01-30 11:59:00.0
Expiration Date: unknown
Title: Roadwork, NM 404 from mile marker 1 to mile marker 9.
Description: Mountain States Constructors, Inc. (Contractor), will be finalizing the roadway reconstruction and lighting project on NM 404 from milepost 0.9 (Anthony) to milepost 8.8 (Chaparral). Traffic has been shifted into the correct lanes. The contractor will be finalizing concrete wall barrier, sidewalk, curb and gutter and seeding and rock placement. Intermittent lane closures may be in place as needed for finalizing the project. The speed limit has been reduced to 45 MPH for the safety of the traveling public. The contractor’s regular hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday, some weekends as needed.~~~
Post Date: 2024-04-23 10:55:25.0
Update Date: 2024-05-20 10:14:57.0
Expiration Date: unknown
Title: Roadwork, NM 404 eastbound and westbound from mile marker 1 to mile marker 9.
Description: Mountain States Constructors, Inc. (Contractor), will be finalizing the roadway reconstruction and lighting project on NM 404 from milepost 0.9 (Anthony) to milepost 8.8 (Chaparral). Traffic has been shifted into the correct lanes. The contractor will be finalizing concrete wall barrier, sidewalk, curb and gutter and seeding and rock placement. Intermittent lane closures may be in place as needed for finalizing the project. The speed limit has been reduced to 45 MPH for the safety of the traveling public. The contractor’s regular hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday, some weekends as needed.
Post Date: 2024-04-23 10:55:25.0
Update Date: 2024-04-23 10:55:25.0
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Closure, Closure
Description: Closure~~~The bridge is currently Closed. Motorists are advised to detour through Reilly Rd. to Blue Hole Rd.
Post Date: 2024-03-19 12:01:01.0
Update Date: 2024-03-19 12:01:01.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 151, 19 miles south of Corona to mile marker 163, 7 miles south of Corona.
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2023-08-01 12:29:28.0
Expiration Date: unknown
Title: Alert, I 40 from mile marker 40, Travel Center to mile marker 49, 23 miles east of Gallup.
Description: Alert~~~Watch for slow moving or stopped traffic on westbound I-40, mile marker 40-47 (from Continental Divide to West of Ciniza).No Detour Available. Expect Delays. Please drive with caution, reduce speed, and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-04-16 18:28:26.0
Update Date: 2024-05-01 15:04:45.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~There will be intermittent lane closures and traffic switches during this time as construction progresses. This project is scheduled for completion in the fall of 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2024-03-04 14:19:27.0
Expiration Date: unknown
Title: Alert, I 10 at mile marker 61, 20 miles west of Deming.
Description: The Gage Rest Area is closed until further notice.~~~
Post Date: 2024-01-09 12:15:48.0
Update Date: 2024-05-20 10:14:36.0
Expiration Date: unknown
Title: Roadwork, NM 112 from mile marker 31, El Vado to mile marker 45, at US 64.
Description: Roadwork~~~One lane will be closed in either direction from 7a.m. until 6p.m. each day while crews work on repairing and expanding the shoulders of the roadway. The roadway will be reopened at the end of each workday. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-04-09 12:54:25.0
Update Date: 2024-04-09 12:54:25.0
Expiration Date: unknown
Title: Roadwork, NM 434 northbound and southbound from mile marker 21, 5 miles south of Black Lake to mile marker 24, 2 miles south of Black Lake.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone.
Post Date: 2024-05-07 07:42:17.0
Update Date: 2024-05-07 07:42:17.0
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone.
Post Date: 2024-05-07 07:37:27.0
Update Date: 2024-05-07 07:37:27.0
Expiration Date: unknown
Title: Alert, US 82 at mile marker 16 Cloudcroft.
Description: Alert~~~US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles. STEEP GRADES, NUMEROUS TIGHT TURNS, AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route. US 62/180 or US 70. THIS IS A PERMANENT ALERT.
Post Date: 2023-12-05 13:16:41.0
Update Date: 2024-05-23 13:51:44.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 17, 1 mile north of Malaga. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Title: Construction Closure, NM 109 northbound and southbound at mile marker 5, 1 mile north of Jarales.
Description: NM 109 MP 5.7 (thru 11/30) The New Mexico Department of Transportation will have a continuous road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: NetoRey Terrazas
Post Date: 2024-03-28 10:58:59.0
Update Date: 2024-05-16 12:31:55.0
Expiration Date: 2024-11-30 23:59:00.0
Title: Construction Closure, NM 14 northbound and southbound and eastbound and westbound at mile marker 1, San Antonio.
Description: ALERT---NM 14, Crest Rd, Frost Rd MP 6 (thru 7/24 Phase 1A) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: Star Paving NMDOT: Jeremy Maestas
Post Date: 2024-03-28 10:48:46.0
Update Date: 2024-05-16 12:27:37.0
Expiration Date: 2024-07-31 23:59:00.0
Title: Roadwork, I 25 from mile marker 150, (SOCORRO NORTH) to mile marker 161, Chamizal.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) has completed the roadway rehabilitation project on Interstate 25 from milepost 150 (Socorro North) to milepost 161 (Chamizal). No traffic impacts at this time. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2024-04-25 10:22:18.0
Update Date: 2024-04-26 14:55:28.0
Expiration Date: unknown
Title: Roadwork, NM 338 from mile marker 11, at NM 14511 to mile marker 24, Animas.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be performing “fog Sealing operations along NM 338, the pavement markings are temporary and permanent striping is scheduled to take place in June. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-04-25 10:21:08.0
Update Date: 2024-05-13 07:09:26.0
Expiration Date: unknown
Title: Roadwork, NM 145 from mile marker 0, at NM 80 to mile marker 3, 3 miles east of NM 80.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be performing “fog Sealing operations along NM 145, the pavement markings are temporary and permanent striping is scheduled to take place in June. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-04-25 10:20:22.0
Update Date: 2024-05-21 07:14:53.0
Expiration Date: unknown
Title: Weather Advisory exists in the Vaughn area.
Description: Weather Advisory - High Winds - High profile vehicles use extreme caution. Blowing dust may cause limited visibility.~~~Motorists please be advised of high winds in the Vaughn Patrol area. Roads include US 54, US 60, and US 285. Please use caution and reduce speed.
Post Date: 2024-05-23 13:41:27.0
Update Date: 2024-05-24 11:13:28.0
Expiration Date: unknown
Title: Roadwork, NM 41 from mile marker 56, Galisteo to mile marker 62, Lamy.
Description: Roadwork~~~NM 41 Phase III Improvements – Milepost 56.6 to US 84/285 ***A new traffic pattern has been put in place for the duration of the project. One lane will be open in each direction and the speed limit will be reduced to 35 mph in the construction zone for the duration of the project. ***
Post Date: 2022-07-21 14:43:17.0
Update Date: 2022-11-08 07:58:18.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 173, 2 miles south of Ramon to mile marker 183, 8 miles north of Ramon.
Description: Roadwork~~~Roadwork mill and fill operations is scheduled to start on Monday, May 20, 2024 on the northbound lanes of US 285 between MP 173.6 to MP 183.46 (between Roswell and Vaughn). Motorists can expect a one-lane closure and a reduced speed limit of 45 MPH through the work zone. WIDTH RESTRICTION of Eleven Feet (11') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. Please proceed with caution, obey all posted signs, and watch for all personnel and equipment. This Project is 160 working days. The expected completion is early January 2025, weather permitting. Contractor Mountain States Constructors, Inc.- Superintendent, Brian Wanner (505) 506-4386; Traffic Control Supervisor- Toby Patton (505) 934-2460; NMDOT Project Manager- Donna Gililland (575) 626-4857; Supervisor Colleen Price (575)315-6581.
Post Date: 2024-05-16 23:06:08.0
Update Date: 2024-05-20 08:45:49.0
Expiration Date: unknown
Title: Construction Closure, NM 45 at mile marker 0, at NM 314.
Description: NM 45, NM 314, NM 317 realignment MP 0 @ (5/20 thru 8/20 Phase 1) There will be continuous lane and shoulder restrictions. Work is being performed for highway reconstruction. Motorists should anticipate delays. Contractor: AUI Inc Project A301088 NMDOT: Tim Chavez
Post Date: 2024-05-16 12:40:14.0
Update Date: 2024-05-16 12:40:14.0
Expiration Date: 2024-08-20 23:59:00.0
Title: Construction Closure, I 25 at mile marker 234, (TRAMWAY).
Description: I-25 NB & SB MP 233-235 (5/20-6/21)-night work The New Mexico Department of Transportation will have lane and shoulder restrictions. Interstate will be down to 1 lane at times with on and off ramp closures and detours. Work is being performed for interstate maintenance. Motorists should anticipate delays. Contractor: Albuquerque Asphalt NMDOT: Barry Lytle
Post Date: 2024-05-16 12:38:44.0
Update Date: 2024-05-16 12:38:44.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 124, 1 mile north of Carrizozo.
Description: Roadwork~~~FULL SUSPENSION-Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Temporary Traffic Signals have been installed at the intersection of US 54 & US 380, all directions are down to one lane through the intersection, Motorist should obey Traffic Signals at all times. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667
Post Date: 2022-09-15 14:35:30.0
Update Date: 2023-08-01 12:25:03.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2023-08-01 12:08:40.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 0, Texas State Line to mile marker 8, 8 miles south of Malaga.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2020-08-13 14:51:47.0
Update Date: 2023-08-01 11:59:19.0
Expiration Date: unknown
Title: Alert, NM 104 eastbound and westbound from mile marker 70, 1 mile east of Mesa Rica to mile marker 90, 15 miles east of Conchas. Roadway closed.
Description: Alert~~~Bridge NO. 5995 at mile marker 71.5, Bridge No. 5254 at mile marker 81.8 and Bridge No. 5257 at mile marker 87.2 all have weight restrictions of 25 tons. Please seek alternate route.
Post Date: 2024-01-11 10:09:46.0
Update Date: 2024-01-11 10:09:46.0
Expiration Date: unknown
Title: Construction Closure,
Description: BL0013 NB & SB MP 2.6 @ Picard (thru 5/31) There will be continuous lane and shoulder restrictions in both directions. Work is being performed for commercial development. Motorists should anticipate delays. Contractor: TLC
Post Date: 2024-05-09 18:07:30.0
Update Date: 2024-05-16 12:31:44.0
Expiration Date: 2024-05-31 20:07:00.0
Title: Construction Closure, NM 500 eastbound and westbound at mile marker 2.
Description: NM 500 EB & WB MP 10-11 Diversion Channal to 2nd St (thru 1/31/25) There will be various shoulder and lane restrictions. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: H.O Construction Project A300945 Bernalillo County
Post Date: 2024-05-09 18:01:05.0
Update Date: 2024-05-16 12:29:57.0
Expiration Date: 2025-01-31 23:59:00.0
Title: Construction Closure, NM 47 northbound and southbound at mile marker 47, San Jose.
Description: NM 47 NB & SB MP 46 (thru 7/2) There will be phased right lane and shoulder restrictions. Work is being performed for commercial development. Motorists should anticipate delays. Contractor: Bradbury Stamm
Post Date: 2024-04-04 07:05:40.0
Update Date: 2024-05-16 12:29:15.0
Expiration Date: 2024-07-02 15:00:00.0
Title: Alert, US 380 at mile marker 43, 13 miles east of Bingham.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 or 575-678-2222 for daily information on possible closure dates and times for firings. THIS IS A PERMANENT ALERT.
Post Date: 2021-07-01 08:53:50.0
Update Date: 2024-05-24 11:13:51.0
Expiration Date: unknown
Title: Closure, NM 118 eastbound and westbound from mile marker 1, 1 mile east of AZ State Line to mile marker 4, 1 mile west of Manuelito.
Description: Closure~~~NM 118 is closed to all traffic in both directions at mile marker 0-4 (West of Manuelito to the Arizona State Line). NO DETOUR AVAILABLE. SEEK ALTERNATE ROUTE. This event will be updated as conditions change.
Post Date: 2024-04-28 10:22:30.0
Update Date: 2024-04-28 13:15:05.0
Expiration Date: unknown
Title: Weather Advisory exists in the Roswell area.
Description: Weather Advisory - High Winds - High profile vehicles use extreme caution. Blowing dust may cause limited visibility.~~~Motorists, please be advised that there are high winds with blowing dust in the Roswell Patrol area. Roads included are US 285, US70, US 380, Roswell Relief Route, and NM 2. Please use extreme caution.
Post Date: 2024-05-25 16:09:05.0
Update Date: 2024-05-25 16:09:05.0
Expiration Date: unknown
Title: Alert, US 70 at mile marker 184, 22 miles west of Holloman AFB.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: 2022-06-27 10:28:09.0
Update Date: 2024-05-24 11:13:39.0
Expiration Date: unknown
Title: Alert, US 82 from mile marker 17, 1 mile east of Cloudcroft to mile marker 21, 3 miles west of Wimsatt.
Description: Alert~~~US82 speed limit has been reduced between mile markers 17 to 21. Forest fire is still active in area. Motorists are advised to follow speed limit and proceed with caution.
Post Date: 2024-05-20 18:31:05.0
Update Date: 2024-05-23 13:51:37.0
Expiration Date: unknown
Title: Roadwork, NM 221 northbound and southbound from mile marker 0 Cebolla to mile marker 4.
Description: Roadwork~~~One lane will be closed for a repaving project, and a pilot car will be on hand to guide motorists through the roadwork zone. Work is expected to last 2 weeks. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-05-20 13:43:57.0
Update Date: 2024-05-20 13:43:57.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~Construction Closure, North Grand Ave Las Vegas mile marker 2.8 to mile marker 3 Center lanes closed due to construction maintenance personnel and equipment on the roadway performing construction work. construction work will be performed until 5pm. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-05-20 11:07:29.0
Update Date: 2024-05-20 11:07:29.0
Expiration Date: unknown
Title: Lane Closure, US 84 from mile marker 173, Tesuque Pueblo to mile marker 178, Cuyamungue.
Description: Lane Closure~~~Repaving project on US 84/285 starting 5/21/2024. Work will take place from mile marker 173 to 178 and is expected to last 20 working days. Crews will be working six days a week, Monday through Saturday, from 8 a.m. until 5 p.m. One lane will be closed during working hours, and the speed limit will be reduced to 45 mph through the work zone. At the end of each workday, all traffic control devices will be removed, and the roadway reopened to motorists. Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit.
Post Date: 2024-05-20 08:31:12.0
Update Date: 2024-05-20 09:34:03.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 62, 4 miles east of Tres Lagunas to mile marker 92, 5 miles west of Alamo.
Description: Roadwork~~~Eastbound and westbound US 60 will have multiple lane closures from mile marker 62-92 (from east of Tres Lagunas to west of Alamo) due to roadwork. Speed is reduced to 45mph in work zone. A flagger operation will be utilized. Please watch for pilot car. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-05-20 08:03:24.0
Update Date: 2024-05-20 08:04:08.0
Expiration Date: 2024-06-28 16:00:00.0
Title: Construction Closure, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Construction Closure~~~Construction continues on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. . Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. *** One lane will be closed for the duration of the project, and flaggers and a pilot car will be on hand to guide motorists through the construction zone 24 hours a day, 7 days a week until the end of the project. *** Please obey all traffic control personnel and proceed with caution through the roadwork zone. *** PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!***
Post Date: 2022-04-18 07:33:36.0
Update Date: 2023-06-29 11:39:06.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 387, 1 mile west of Clovis to mile marker 389, eastside of Clovis. Roadway closed.
Description: Roadwork~~~Road Reconstruction project on US60/84 from MP 387.800 to MP 389.120. Eastbound lanes of US 60 will be closed and reconstructed between the intersections of Main and Ash St. Prince Street will also be completely closed between the intersection of US 60 and E. McDonald. Traffic will be reduced to one lane in each direction on the existing Westbound Lanes. Traffic will follow posted detour signage and there is a 12ft width restriction, oversized or wide loads must use the designated truck bypass off of Hall St. Please follow all posted signage be aware of personnel and equipment in the workzone. Project expected completion date is Summer of 2025 depending on weather and delays. Contractor - AUI, Inc.- John Hale 505-974-1613 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-17 15:32:10.0
Update Date: 2024-05-16 10:33:38.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 75, Williamsburg (T OR C SOUTH).
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) will be continuing construction to replace the bridge at I-25 milepost 75, Broadway Street and NM 187 in Williamsburg. Traffic has been shifted into the northbound lanes with the on/off ramps open, access to the southbound on/off ramps is still closed. Currently crews are working on installation of southbound on/off ramps, bridge painting, and drainage structures. Regular work hours will be 7 a.m.-5:30 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed. Access will be maintained to all businesses and residences during construction.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2024-05-15 06:39:32.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2022-11-08 07:57:24.0
Expiration Date: unknown
Title: Alert, Alert
Description: Alert~~~North Atkinson from College Blvd. to Cherry St. will be closed from January 8th to July 4th due to reconstruction of roadway. Motorists are to follow detour signs for alternate route. If you have any questions concerning the reconstruction of North Atkinson, please contact Thomas McAlister at 575-416-1841.
Post Date: 2024-01-08 06:56:27.0
Update Date: 2024-05-24 11:14:00.0
Expiration Date: 2024-07-04 08:00:00.0
Title: Roadwork, NM 48 from mile marker 0, Hollywood to mile marker 3, Ruidoso.
Description: Roadwork~~~Roadway striping operations will begin on Wednesday, May 8, 2024, on NM 48 from mm 0 (Hollywood) to mm 3.3. Motorists should expect rolling traffic control and some delay. Striping should be complete by Friday, May 10, weather permitting. Please use caution for all workers and equipment in the area. NMDOT contact: Aaron Clark, Project Manager (575) 626-9817; Contractor is San Bar Construction.
Post Date: 2024-04-08 14:40:41.0
Update Date: 2024-05-16 11:24:18.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 162 Organ to mile marker 150, Las Cruces.
Description: Roadwork~~~Mesa Verde Enterprises, Inc. (Contractor) will be continuing the roadway rehabilitation project on US 70 from Del Rey Blvd. to Nasa Rd. just east of Las Cruces. Crews are removing and replacing outdated guardrail, curb & gutter from Nasa Rd., working west towards Las Cruces. Working hours will be from 8 p.m. to 9 a.m., Sunday through Friday. Once complete, crews will then shift into paving operations and will begin the mill and inlay process. Working nighttime hours will be from 8 p.m. to 6 a.m., Sunday to Friday. Traffic control and lanes closures will be in place for the safety of our crews and the traveling public during working hours.
Post Date: 2024-04-08 07:13:01.0
Update Date: 2024-05-21 07:13:22.0
Expiration Date: unknown
Title: Alert, US 64 from mile marker 6, 6 miles east of Arizona State Line to mile marker 9, 9 miles east of Arizona State Line.
Description: Alert~~~Beginning Monday March 11th, one lane will be closed from 6a.m. until 6p.m. each day, Monday through Friday. The remaining lane will have a width restrict in place of 9' during working hours. Work is expected to be completed by November 20th, 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-03-04 14:17:10.0
Update Date: 2024-03-16 01:20:37.0
Expiration Date: unknown
Title: Roadwork, US 380 at mile marker 65, Carrizozo.
Description: Roadwork~~~Project is in Full Suspension-Dynamic Message signs are being installed throughout Lincoln and Otero Counties. US 380, MP 65 to MP 66, US 70 at MP 259 in Lincoln County and US 70 at MP 231 in Otero County. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Aaron Clark, NMDOT Project Manager (575)840-3566; Contractor; Erin Millwood, Bixby Electric, Construction Project Manager (505)263-3421 ; Russell Critchell, Bixby Electric, Construction Traffic Control Supervisor (505)238-3595
Post Date: 2023-05-01 09:30:41.0
Update Date: 2023-08-01 12:27:39.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 0, Arizona State Line to mile marker 15, (GARY).
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) is continuing with the roadway rehabilitation project on Interstate 10 from milepost 0 (Arizona Stateline) to milepost 15 (Gary) in Hidalgo County. Drivers can expect various daytime lane closures on both the eastbound and westbound lanes as needed for milling and paving operations. Overnight lane closure may be in place for the placement of the concrete wall barrier and guardrail installations. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday. Overnight lanes closures may be in place for the replacement of the guardrail and concrete wall barrier.
Post Date: 2024-03-29 14:18:05.0
Update Date: 2024-05-21 07:14:45.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Roadwork, I 10 at mile marker 164, Anthony.
Description: Roadwork~~~I-10 Widening West Monday, May 13, through Saturday, May 18 9 a.m. to 4 p.m. • I-10 East and West will be intermittently reduced to one lane between Vinton Road and Transmountain Road. Crews will be constructing a retaining wall. The following closures and detours will continue until further notice: • The westbound mainlanes of I-10 are detoured onto North Desert Boulevard at Los Mochis Drive. • The eastbound mainlanes of I-10 are detoured onto South Desert Boulevard at Los Mochis Drive. • South Desert Boulevard is closed to all traffic south of Spur 37 (Vinton Road). • I-10 West is reduced to one land from Redd Road to north of Transmountain Road. • Both turnarounds at Redd Road are closed. • The onramp from South Desert Boulevard to I-10 East at Redd Road is closed. • Alternating nighttime lane closures are possible on I-10 East and West between Redd Road and Anthony, Texas. • Alternating daytime lane closures are possible on North Desert Boulevard and South Desert Boulevard between Redd Road and Anthony, Texas.
Post Date: 2024-04-26 15:48:41.0
Update Date: 2024-05-21 07:13:51.0
Expiration Date: unknown
Title: Roadwork, NM 35 northbound and southbound from mile marker 0, at NM 152 to mile marker 27, 0.5 miles south of NM 15.
Description: Roadwork~~~Highland Enterprise Inc. (Contractor) will be continuing a maintenance operation project to place “chip seal” pavement on NM 152, NM 35, and NM 15 in Grant County. Crews will be finishing on NM 152 and moving to NM 35 working from milepost 0 (Mimbres) to milepost 27 (NM35/NM15 intersection) then to NM 15 working from milepost 30 to 12. Working hours will be seven days a week from 7 a.m. until 5 p.m. Motorists should expect intermittent lane closures, and reduced speeds in the work zone, please expect minor delays. Use caution for workers and equipment in the area. Center lane stripping will not be present in construction zones.
Post Date: 2024-05-24 23:24:09.0
Update Date: 2024-05-24 23:24:09.0
Expiration Date: unknown
Title: Roadwork, NM 15 northbound and southbound from mile marker 0, Silver City to mile marker 25, 14 miles south of Gila Hot Springs.
Description: Roadwork~~~Highland Enterprise Inc. (Contractor) will be continuing a maintenance operation project to place “chip seal” pavement on NM 152, NM 35, and NM 15 in Grant County. Crews will be finishing on NM 152 and moving to NM 35 working from milepost 0 (Mimbres) to milepost 27 (NM35/NM15 intersection) then to NM 15 working from milepost 30 to 12. Working hours will be seven days a week from 7 a.m. until 5 p.m. Motorists should expect intermittent lane closures, and reduced speeds in the work zone, please expect minor delays. Use caution for workers and equipment in the area. Center lane stripping will not be present in construction zones.
Post Date: 2024-05-24 23:23:32.0
Update Date: 2024-05-24 23:23:32.0
Expiration Date: unknown
Title: Roadwork, NM 152 eastbound and westbound from mile marker 0, Santa Clara to mile marker 15, San Lorenzo.
Description: Roadwork~~~Highland Enterprise Inc. (Contractor) will be continuing a maintenance operation project to place “chip seal” pavement on NM 152, NM 35, and NM 15 in Grant County. Crews will be finishing on NM 152 and moving to NM 35 working from milepost 0 (Mimbres) to milepost 27 (NM35/NM15 intersection) then to NM 15 working from milepost 30 to 12. Working hours will be seven days a week from 7 a.m. until 5 p.m. Motorists should expect intermittent lane closures, and reduced speeds in the work zone, please expect minor delays. Use caution for workers and equipment in the area. Center lane stripping will not be present in construction zones.
Post Date: 2024-05-24 23:22:40.0
Update Date: 2024-05-24 23:22:40.0
Expiration Date: unknown
Title: Alert, US 84 from mile marker 215, 2 miles north of Buena Vista to mile marker 241, 2 miles north of Canjilon.
Description: Alert~~~Smoky conditions exist in the area and will cause low visibility. Proceed with caution through the area.
Post Date: 2024-05-24 10:17:51.0
Update Date: 2024-05-24 10:17:51.0
Expiration Date: 2024-06-10 10:08:00.0
Title: Roadwork, NM 566 northbound and southbound from mile marker 6, 6 miles north of I-40 to mile marker 7, 7 miles north of I-40.
Description: Roadwork~~~Roadwork on NM 566, mile marker 6-7 (north of Church Rock) due to a bridge replacement project. All traffic has been shifted onto the detour pavement. Speed reduced to 35mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-12-22 09:19:16.0
Update Date: 2023-12-22 09:19:16.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 123, Carrizozo. , right shoulder, and left shoulder
Description: Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667~~~
Post Date: 2022-02-18 11:01:42.0
Update Date: 2022-07-22 09:47:34.0
Expiration Date: unknown
Title: Alert, NM 14 from mile marker 28, 1 mile south of Madrid to mile marker 29, Madrid.
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2024-02-10 19:05:15.0
Expiration Date: unknown
Title: Lane Closure, I 25 from mile marker 171, 19 miles south of Belen to mile marker 170, La Joya.
Description: Lane Closure~~~J-H Supply, Co. (Contractor) will be continuing a guardrail and end treatment project along I-25 in Socorro County from milepost 159 to 175. Motorists can expect lane closures in the southbound lane from milepost 170-171 and northbound passing left lane from milepost 160-161. Overnight lane closures should be expected. The hours of operation are from 7 a.m. to 5 p.m., Monday through Friday. Construction is expected to be completed by Spring 2024.
Post Date: 2023-02-17 14:06:00.0
Update Date: 2024-05-20 10:15:17.0
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound at mile marker 0, Church Rock (I-40).
Description: Roadwork~~~Bridge Replacement work on NM 566, mile marker 0 - 0.866 (Church Rock). All traffic has been shifted to the detour pavement. Watch for equipment. This event will be updated as conditions change.
Post Date: 2023-10-13 15:46:41.0
Update Date: 2023-10-13 15:46:41.0
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound from mile marker 321, (PALOMAS) to mile marker 327, 1 mile west of Tucumcari.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone.
Post Date: 2024-04-12 10:46:23.0
Update Date: 2024-04-12 10:46:23.0
Expiration Date: unknown
Title: Alert, NM 475 from mile marker 1 to mile marker 5.
Description: Alert~~~Beginning Monday, September 11, 2023, PNM will begin a project to upgrade the electrical service to residents on N.M. 475. One lane will be closed in various spots between mile marker 2.5 to 4.5 until the project is completed. *** For more information, please contact the PNM Electric Hotline @ 1-833-910-3670 ***
Post Date: 2023-09-08 12:37:39.0
Update Date: 2024-03-08 08:32:34.0
Expiration Date: unknown
Title: Alert, US 380 at mile marker 66, Carrizozo.
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.~~~
Post Date: 2017-01-06 12:52:40.0
Update Date: 2024-05-24 11:13:46.0
Expiration Date: unknown
Title: Roadwork, NM 359 at mile marker 2.
Description: Roadwork~~~AUI, Inc. (Contractor) will continue the bridge rehabilitation project on NM 359 at milepost 1.90 over the Rio Grande. The majority of the work will take place under and around the bridge, with no traffic impacts expected. Drivers are asked to please obey traffic control devices if placed and be on the lookout for workers and/or equipment entering and exiting the roadway. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-01-05 13:48:00.0
Update Date: 2024-05-21 07:13:43.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 3, (LOHMAN) to mile marker 4, 4 Las Cruces.
Description: Roadwork~~~Grass Masters LLC (Contractor) is continuing a landscaping, curb and gutter, miscellaneous construction, and paving project along I-25 from milepost 3 to milepost 3.7 near Lohman Ave in Las Cruces. Crews will be working on the wall foundations and wall footing along the I-25 northbound interchange and on/off ramp. Most construction will be on the shoulders with little impact to travelers. The contractor’s hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday.
Post Date: 2024-01-05 13:42:31.0
Update Date: 2024-05-21 07:13:36.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 384, 2 miles east of Cannon AFB to mile marker 385, 3 miles east of Cannon AFB. Roadway closed.
Description: Roadwork~~~Intersection Improvements at Intersection of US 60/84 & HWY 467 MP 384.312 to MP 384.596. US60/84 Westbound Lanes are closed with traffic reduced to one lane in each direction using existing Eastbound Lanes expect delays. NM467 will be closed to thru traffic from Brady to US 60/84 please follow posted detour routes and signage in the workzone. There is 11ft width restriction wide and oversized loads please seek alternate route. Work is expected to be completed summer of 2024 depending on weather and delays. Contractor – K Barnett & Sons Project Manager – Hunter McLemore (214)693-3588 K Barnett & Sons TCS – Hector Guerrero (575)309-5299 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2024-04-05 15:23:47.0
Update Date: 2024-05-16 10:33:55.0
Expiration Date: unknown
Title: Roadwork, NM 83 from mile marker 0, Lovington to mile marker 1, 1 mile east of Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US82 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. The intersection of NM 83/82 has been reopened for east, west, and southbound traffic. Northbound traffic is closed from the intersection to Central. Use posted detour signs to navigate through construction. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 499 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on US 82 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drive pads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2101381R2 project: Contractor: Constructors, Inc., Project Manager- Darin Coslin (575) 626-1140, Superintendent- Hector Sicre (915)316-7732. Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938, Project Safety Office- Tami Mandel (505) 697-1787- Project EEO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2024-03-21 08:25:24.0
Expiration Date: unknown
Title: Roadwork, NM 9 from mile marker 0, 1 mile east of AZ State Line to mile marker 28, 8 miles east of Antelope.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be performing “fog Sealing operations along NM 9, the pavement markings are temporary and permanent striping is scheduled to take place in June. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-05-03 15:02:44.0
Update Date: 2024-05-21 07:15:01.0
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 150, (SOCORRO NORTH) to mile marker 161, Chamizal.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) will be finalizing the roadway rehabilitation project on Interstate 25 from milepost 150 (Socorro North) to milepost 161 (Chamizal). Drivers can expect various daytime lane closures on both the northbound and southbound lanes as needed. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2024-05-03 15:01:45.0
Update Date: 2024-05-03 15:01:45.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 117, 30 miles south of Socorro to mile marker 121, 26 miles south of Socorro.
Description: Roadwork~~~Hasse Contracting Co. will be finalizing repairs to the bridges on I-25 at milepost 117 and milepost 121. Traffic can expect lane closures on I-25 on the southbound lanes until the bridge deck repairs are complete, one lane will remain open. Contractor working hours are Monday through Friday from 7 a.m. to 5 p.m. Use caution for workers and equipment in the area. Repairs are expected to be completed by the end of May 2024.
Post Date: 2024-05-03 15:00:12.0
Update Date: 2024-05-15 06:39:46.0
Expiration Date: unknown
Title: Alert, NM 152 from mile marker 15, San Lorenzo to mile marker 49, 1 mile east of Hillsboro.
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2023-03-03 14:03:42.0
Update Date: 2024-05-17 13:46:02.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 17, 1 mile north of Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2023-08-01 12:00:45.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 35, (RINCON).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin work on erosion control along I-25 between Rincon and Hatch. The contractor will be working on the southbound off ramp and Rincon (exit 35) and near milepost 43, I-25 may be reduced to a single lane depending on the work location, drivers should be vigilant for construction signing. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-02-02 15:08:46.0
Update Date: 2024-04-25 10:18:14.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Fair and Breezy 90°F
30.00in
Barometer
7%
Humidity
West 20.7mph
Wind
Fair and Breezy

More Local Information

Bookmark and Share

Traffic Nearby

Mesilla weather and traffic updates by locals

Write your own Mesilla, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Mesilla, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Mesilla, NM report and/or forecast will be removed by a moderator.