• Become A Member


Ruidoso Traffic and Road Conditions




Use it here instead?
Instant Free Trial...
Removes our ads too!
All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Ruidoso Traffic Alerts

Title: US 380 at mile marker 43
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. THIS IS A PERMANENT ALERT.
Post Date: 2017-05-17 14:04:16.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: New Mexico 230 from mile marker 0 to mile marker 4
Description: NM 230 - Taos - Road Closed due to culvert replacement. Crews will be working in the area from 9:00 a.m. to 12:00 p.m. on July 31st. Seek alternate route.
Post Date: 2018-07-31 08:50:04.0
Update Date: 2018-08-13 16:42:59.519
Expiration Date: unknown
Title: New Mexico 188 from mile marker 1 to mile marker 2
Description: AUI, Inc. (Contractor) is currently performing roadway reconstruction, utility replacements and lighting/signalization improvements on Valley Drive. Currently the active zone of construction is on Valley Drive from Picacho to Amador. Traffic is currently on the northbound lanes as the southbound lanes are closed for construction. Hadley may be reclosed due to installation of utilities within the next few weeks. If closed an alternate access to businesses will be installed. Construction will be from 7:00 am to 5:00 PM, 5 days a week.
Post Date: 2018-06-26 07:20:39.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: New Mexico 524 at mile marker 7
Description: The Intersection of Standpipe Road and NM 524 (Lea Street) in Carlsbad is CLOSED for construction at the intersection. There will be limited access to the road in this location. Business access will be maintained at all times. A Detour is in place and Motorists are asked to reduce speed and follow all posted construction and detour signs. Please watch for construction personnel and equipment at this location. Completion is expected in the Fall 2018. Contact: J & H Services Inc. 505-896-9428
Post Date: 2018-02-20 10:36:26.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: NM 209 northbound and southbound from mile marker 2 to mile marker 7.
Description: Roadway Rehabilitation and Reconstruction on NM 209 from MP 2.44 to MP 7.14. Motorists please be aware of NMDOT and Contractor personal and equipment on the jobsite as there are multiple operations taking place. All lanes of traffic are open but remaining work may require lane closures in areas. Please follow are posted signage. This Project is 400 working days. Expected completion date is December 2018. K. Barnett & Sons: Deole HIll Superintendent (575) 749-8093. NMDOT: Chris Pacheco Project Manager (575) 840-8853.
Post Date: 2017-09-19 09:16:57.0
Update Date: 2018-08-06 10:44:14.0
Expiration Date: unknown
Title: US 84 at mile marker 165
Description: US 84/285 (St. Francis Drive)Guadalupe Bridge North of Santa Fe. August 7 - US 84/285 (St. Francis Drive) southbound ramp to Guadalupe Street will be CLOSED for two weeks. Traffic will be detoured to Paseo de Peralta for access to Guadalupe Street and local businesses.
Post Date: 2018-07-10 16:33:16.0
Update Date: 2018-08-13 16:42:59.519
Expiration Date: unknown
Title: New Mexico 502 from mile marker 1 Los Alamos to mile marker 8
Description: LANL Pavement Preservation Project - Los Alamos - NM 502 to Tewa Service Station. The USACE is responsible for management of the project. Contractor is Albuquerque Asphalt, Inc. Please contact Sonny Kim, at Sungmin.kim@USACE.army.mil, 505-665-8701 - At about 6 a.m. Friday and Saturday, July 20-21, the ramp that takes eastbound drivers from Main Hill (NM 502) onto NM 4 toward White Rock will close. The ramp will reopen on Sunday. At about 10 a.m. on Friday, July 20, the ramp that takes westbound NM 502 drivers onto NM 4 toward White Rock will close for the day and will also be closed on Saturday, July 21. The ramp will reopen on Sunday. Also on Friday, full reconstruction of a section of NM 502 eastbound begins resulting in closure of one of the eastbound lanes beginning at the bottom of Main Hill Road. Traffic will be diverted from about 1 p.m. to 10 p.m. Monday through Friday to accommodate peak commute times. Traffic will be rerouted as follows: Drivers leaving Los Alamos on Main Hill/502 will shift to one of the westbound lanes on NM 502. Drivers using NM 4 to leave Los Alamos/White Rock will merge onto the only open eastbound lane on NM 502. The NM 4 single-lane hairpin turn at the Y interchange that takes drivers north onto Main Hill/502 will close during peak traffic hours (shown in map as blue). The NM 4 ramp to Santa Fe, shown in map in yellow, is tentatively scheduled to be closed Saturday July 28th.
Post Date: 2018-07-10 12:02:27.0
Update Date: 2018-08-13 16:42:59.519
Expiration Date: unknown
Title: US 84 northbound from mile marker 190 El Guacho to mile marker 195 Hernandez
Description: U.S. 84/285 - North of Espanola - Hernandez- Pavement Preservation . Starting August 7 U.S. 84/285 the northbound lanes will be reduced to one lane. Motorists can expect delays Monday thru Saturday from 7:00 a.m. to 4:30 p.m. Once the northbound lanes are complete, the contractor will move to the southbound lanes. This project is scheduled to be completed August 18; weather permitting
Post Date: 2018-08-07 11:53:48.0
Update Date: 2018-08-13 16:42:59.519
Expiration Date: unknown
Title: US 60 from mile marker 234 to mile marker 238
Description: US 60 - Blade Patching opeations from August 7 - 16, 2018. US 60 will be reduced to one lane with a flagger guiding traffic through the work zone Monday thru Thursday from 6:00 a.m. to 4:30 p.m.
Post Date: 2018-08-07 09:31:38.0
Update Date: 2018-08-07 09:31:38.0
Expiration Date: unknown
Title: US 285 northbound and southbound at mile marker 1
Description: TXDOT - Work on U.S. Highway 285 (Texas) has hit a critical junction that will severely affect traffic patterns between Pecos TX and Orla TX in Reeves County Texas. A bridge-class culvert will be replaced at 4-Mile Draw. Temporary traffic signals will be in operation around the clock at the culvert. Running a red light in this situation could be absolutely catastrophic. The lane will be limited to 11-foot wide loads. The physical structure will be very narrow and will not be wide enough to allow two vehicles to pass or to allow wide loads to cross. The speed limit in the work zone is 45 miles per hour. Delays can be expected. Alternate routes are strongly encouraged if possible. Motorists are reminded that state law requires them to obey pilot cars and warning signs as well as any flaggers encountered in the work zone. This is part of a project to improve about 10.8 miles of Highway 285 between County Road 232 and Orla (RM 652) north of Pecos. Constructors Inc. of Carlsbad, N.M., won the project with a low bid of $12,525,496. A second project is under way just to the south of this project. Two additional projects for U.S. Highway 285 are scheduled for to begin in Summer of 2018. For more information go to www.drivetexas.org or contact Gene Powell at gene.powell@txdot.gov or (432) 498-4746.
Post Date: 2018-04-03 15:49:49.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: New Mexico 456 from mile marker 20 to mile marker 38
Description: Unpaved road -- may be impassable during inclement weather proceeed at your own risk.
Post Date: 2015-06-25 16:19:56.0
Update Date: 2018-08-10 11:28:56.303
Expiration Date: unknown
Title: New Mexico 273 from mile marker 1 to mile marker 3 Sunland Park
Description: Constructors, Inc. (Contractor) will begin with roadway reconstruction, rehabilitation, signalization & lighting along NM 273 "McNutt Rd". Traffic is being diverted from southbound driving lanes to northbound driving lanes to begin the first phase of the project. Temporary lane closures are to be expected throughout the project while preliminary work begins. The contractors hours of operation will be from 6:30 am to 5:30 pm, Monday through Friday. Construction is expected to be completed by fall 2019.
Post Date: 2018-05-24 07:56:38.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: US 60 northbound and southbound from mile marker 380 to mile marker 386.
Description: Roadway Rehabilitation, Signalization, and ITS Project on US 60/84 from MP 380.400 to MP 385.500. All four lanes of traffic are open with lanes closure where work is taking place. Speed limit reduced to 45 MPH and speeding fines double in Construction Zone signs are posted. Please follow all posted construction signs. Also please be aware of personal and equipment working in the work zone. The Expected Completion date is August 2018. K. Barnett & Sons: Bryce Kidd Superintendent (575)762-4407. NMDOT: Chris Pacheco Project Manager (575) 840-8853.
Post Date: 2017-12-21 15:16:34.0
Update Date: 2018-08-06 10:48:26.0
Expiration Date: unknown
Title: New Mexico 187 from mile marker 24 to mile marker 36 Williamsburg
Description: The New Mexico Department of Transportation (NMDOT) will be performing "Chip Sealing" with Brooming and Fog Sealing operations in Dona Ana Co. Speed limit will be reduced, no center stripe and loose gravel on roadway. Traffic will encounter lane drops with pilot car and flagging operations. Hours of operation will be from 8:00 am till 5:30 pm, Monday through Friday.
Post Date: 2018-05-17 14:44:18.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: Signal Light and Drainage work
Description: Morrow Enterprises, Inc. (Contractor) will begin signal light and drainage work along the northbound shoulder of N. Main St. at Camino Del Rex. Traffic may encounter a lane drop and shoulder work in the area. Hours of operation will be from 8:30 am to 5:00 pm.
Post Date: 2018-05-17 14:40:10.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: US 54 from mile marker 69 to mile marker 79 Tularosa.
Description: Construction is underway between MP 69.56 and 78.16 between Alamogordo and Tularosa on US 54/70. Construction will consist of roadway reconstruction, concrete box culvert reconstruction and channel erosion mitigation. Work will be done various locations with in the project limits. Traffic is down to one lane in multiple areas. Detours are in place with traffic being switched to the North Bound lanes around the area of Dog Ranch Road MP 75 and Alamorosa MP 76 11 FOOT WIDTH RESTRICTIONS are in place for the traffic detour. The Speed Limit is reduced to 45 MPH with DOUBLE FINE ZONE applying to the Construction Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. A 12 FOOT WIDTH RESTRICTION is in place for the entire project and all Wide and Oversized Loads should seek an alternate route. Project is scheduled to be finished in the Fall of 2019. Brian J Torres NMDOT Project Manager 575-585-2090/575-626-4278 Bruce Bogard Mountain States Constructors 505-350-5752
Post Date: 2018-04-12 08:22:13.0
Update Date: 2018-08-09 09:12:12.464
Expiration Date: unknown
Title: Interstate 10 from mile marker 2 (Vinton) to mile marker 22 (LORDSBURG)
Description: MWI, Inc. (Contractor) will continue installation of the Intelligent Transportation System (ITS). Traffic can expect intermittent lane closures with median and shoulder work in the area from milepost 6 to 9. Hours of operation will be from 7:00 am to 5:30 pm, Monday through Thursday. Construction is expected to be completed by fall 2018.
Post Date: 2018-06-07 12:57:07.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: Interstate 10 at mile marker 85 (DEMING EAST)
Description: MWI, Inc. (Contractor) will continue installation of the lighting project along Pine Street to exit 85 ramp. Traffic can expect intermittent lane closures and shoulder work in the area milepost .84 to .86. Hours of operation will be from 7:00 am to 5:30 pm, Monday through Thursday. Construction is expected to be completed by fall 2018.
Post Date: 2018-07-05 15:20:55.0
Update Date: 2018-07-30 08:05:05.0
Expiration Date: unknown
Title: US 70 eastbound and westbound from mile marker 169 to mile marker 172
Description: Villalobos Construction (Contractor) will be replacing the metal guardrail in Dona Ana County. Traffic will encounter lane closures on the driving (right) lanes with a reduced speed limit. Construction hours will be Monday through Friday from 7:00 am to 5:30 pm and is expected to be completed by October 2018.
Post Date: 2018-08-02 13:39:29.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: US 82 at mile marker 16 Cloudcroft
Description: US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles! STEEP GRADES, NUMEROUS TIGHT TURNS AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route - US 62/180 or US 70. THIS IS A PERMANENT ALERT. (lc).
Post Date: 2015-10-25 15:29:32.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: New Mexico 466 at mile marker 3
Description: Old Pecos Trail --Bridge Work - Old Pecos trail will be reduced to one lane from 7:00 a.m. to 5:00 p.m. Monday thru Friday. Motorists can expect minor delays.
Post Date: 2018-07-22 19:13:28.0
Update Date: 2018-07-24 17:13:58.0
Expiration Date: unknown
Title: New Mexico 136 from mile marker 1 to mile marker 9
Description: FNF Construction, INC. (Contractor) continues with roadway reconstruction, roadway rehabilitation, bridge rehabilitation, signalization & lighting along NM 136 the Pete V Domenici Intl. Hwy. Traffic will encounter lane closures as well as detours with an 11 width restriction in effect throughout the project. Northbound and southbound traffic will be on the northbound lanes with single lanes in both directions divided by temporary concrete wall barrier. They will remain in this configuration until the next phase change in July. Contractors hours of operation will be from 7:00 am to 5:00 pm Monday to Friday; lane closures and traffic control shall remain in place 24 hours a day 7 days a week.
Post Date: 2017-10-30 08:54:19.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: New Mexico 502 eastbound and westbound at mile marker 11
Description: NM 502 - Otowi bridge rehabilitation work between Pojoaque and Los Alamos. - On Monday August 6th NM 502 concrete wall barrier will be placed through the work zone. Traffic will be switched over to the westbound lanes. There will be one lane of travel in each direction. This project is scheduled to be completed end of September 2018. Motorists can expect delays during this time. Drivers are urged to watch for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. Updates on this project will be posted on the New Mexico Department of Transportations road advisory website, http://nmroads.com/.
Post Date: 2018-07-30 15:06:02.0
Update Date: 2018-08-13 16:42:59.519
Expiration Date: unknown
Title: US 380 at mile marker 231
Description: Motorists please be advised that trucks will be loading and hauling chips for the chip seal on US 380 at mm 231 (East of Tatum). Please use caution, reduce speed and watch for all personnel and equipment in the area.
Post Date: 2018-07-30 08:30:55.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: NM 193 from mile marker 21 to mile marker 41.
Description: Unpaved road -- may be impassable during inclement weather proceeed at your own risk.
Post Date: 2017-11-27 11:29:34.0
Update Date: 2018-06-25 09:54:08.0
Expiration Date: unknown
Title: New Mexico 15 from mile marker 0 to mile marker 2
Description: TLC Construction (Contractor) will be reconstructing the roadway, installing curb and gutter, sidewalk and bike lanes. NM 15 from HWY 180 to the 32nd street interchange will have one-way traffic only. Pine Road is closed to through traffic at Pine/PA Road intersection while the contractor is reconstructing the intersection. Detours will be in place and traffic is asked to reduce speed and use caution seek an alternate route if possible. Contractor's hours of operation will be from 7:00 a.m. to 5:00 p.m. Monday through Friday; closures and traffic control shall remain in place 24 hours a day 7 days a week. Construction is scheduled to be completed by spring of 2019.
Post Date: 2018-03-26 07:37:34.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: US 64 westbound at mile marker 399.
Description: Alert - Grenville area -- driving lane closed -- please observe all traffic control in place. Please reduce speed and use caution in area.
Post Date: 2018-06-25 10:00:51.0
Update Date: 2018-08-10 11:28:56.303
Expiration Date: unknown
Title: New Mexico 90 from mile marker 0 to mile marker 22
Description: Speed limit is reduced, traffic will encounter no center stripe and there may be loose gravel on roadway. Next phase of construction is scheduled to begin on August 20th.
Post Date: 2018-06-25 09:36:18.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: New Mexico 502 eastbound and westbound at mile marker 11
Description: US 84/285 - OTOWII BRIDGE - Hasse contractor working on bridge repairs from 8:30 a.m. to 5:30 p.m. Monday thru Friday. Traffic has been switched to the west side. There is one lane of travel in each direction. Lane closures are in effect 24 hours a day seven days a week.. Project scheduled to be completed end of October 2018.
Post Date: Mon Jul 23 08:37:00 MDT 2018
Update Date: 2018-08-14 16:36:30.0
Expiration Date: unknown
Title: US 285 northbound from mile marker 55 Lakewood to mile marker 64 Atoka
Description: Roadwork Pavement Rehabilitation has been suspended on US 285 between mm 63.25 and mm 55 (between Artesia and Carlsbad) until further notice Personnel and Equipment in this area. Contractor: Cutler Repaving ; NMDOT Project Manager: Michael Vigil 505-231-0868.
Post Date: 2018-05-21 09:57:29.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: US 285 southbound from mile marker 158 to mile marker 146.
Description: Roadwork Pavement Rehabilitation will begin Monday, June 25, 2018 on US 285 southbound lanes between mm 158 and mm 146 (between Vaughn and Roswell). Motorists can expect a one lane closure for paving operations where traffic will be diverted into one southbound lane. Work is expected to be completed 8/16/18 - weather permitting. Please obey all posted signage, reduce your speed and watch for Personnel and Equipment in this area. Contractor: Cutler Repaving ; NMDOT Project Manager: Michael Vigil 505-231-0868.
Post Date: 2018-06-18 09:04:20.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: New Mexico 273 at mile marker 1
Description: The Texas Department of Transportation has closed McNutt Road at the Rio Grande in Anapra/Sunland Park until further notice due to the Loop 375 construction project. Please follow detour signs to Racetrack Drive then onto Doniphan Drive.
Post Date: 2015-11-16 08:13:18.0
Update Date: 2018-07-25 13:16:55.0
Expiration Date: unknown
Title: I 25 at mile marker 214.
Description: I-25 southbound milepost 214 Project A301344: ALERT---August 24th through August 27th from 9 PM to 5 AM various lane restrictions Thursday night. Continuous lane restrictions starting Friday night at 9 PM through Monday morning at 5 AM. Work is being performed for bridge maintenance. Contractor: Truesdell Corp NMDOT Project Manager Interim: Josh Gallegos
Post Date: Mon Aug 13 09:06:00 MDT 2018
Update Date: 2018-08-13 09:06:03.0
Expiration Date: Tue Aug 28 06:00:00 MDT 2018
Title: US 60 eastbound and westbound from mile marker 342 Taiban to mile marker 355
Description: Roadwork Pavement Rehabilitation has begun on the Westbound lane of US 60/84 from mm 342 (Taiban) to mm 355. Motorists should expect some delays with intermittent lane closures with pilot car operations for Westbound traffic to be diverted onto the Eastbound lane. SPEED LIMIT HAS BE REDUCED TO 45 MPH IN THE WORK ZONE. Work is to be completed in 42 days weather permitting. Please use caution, reduce speed, obey all posted signage, and watch for all personnel and equipment in the area. Contractor: Cutler Repaving; NMDOT Project Manager : Chris Pacheco 575-840-9625.
Post Date: 2018-07-09 12:55:01.0
Update Date: 2018-08-07 08:52:35.0
Expiration Date: unknown
Title: Interstate 25 from mile marker 154 to mile marker 157
Description: Mountain States Constructors, Inc. (Contractor) is continuing with bridge replacement and roadway reconstruction on Interstate 25 in Socorro Co. Traffic is being diverted from southbound driving lanes to northbound driving lanes to begin the next phase of the project. A 12 width restriction will be in effect throughout the project. Hours of operation will be from 6:30 am to 6:00 pm, Monday through Friday. Construction is expected to be completed by winter 2018.
Post Date: 2017-11-06 09:57:39.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: US 70 at mile marker 184
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: 2016-06-06 10:05:20.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: Interstate 40 eastbound and westbound from mile marker 37 Iyanbito to mile marker 42
Description: East and westbound passing lanes on I-40 will be closed from mile marker 37-42 (east of Iyanbito to west of Coolidge) due to work in the median for upcoming construction project. Work will also be performed on ramps at Exit 39 (Ciniza Refinery). Speed reduced to 55 mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2018-08-06 14:59:08.0
Update Date: 2018-08-14 07:59:32.214
Expiration Date: unknown
Title: US 70 northbound and southbound from mile marker 440 to mile marker 441 Clovis.
Description: Roadway Reconstruction, Bridge Rehabilitation, and Lighting Project taking place on US 70 from MP 440.900 to MP 441.207 and US 60/60/84 from MP 389.00 to MP 390.500. All four Traffic Lanes and the Pedestrian walk ways will be closed on the Prince St Bridge from E 1st St to E Brady Ave during construction and there will be lane closure in areas on E 1st St/Mabry Dr from Prince St to N Norris St during street light installation. Expect delays and seek alternate route as traffic will be detoured to Hall St Overpass and Norris St. This Project is 290 working days. Expected start date is August 2018. El Terrero Construction: Jose Coral-Estrada Superintendent (575)977-1703. NMDOT: Chris Pacheco Project Manager (575) 840-8853.
Post Date: 2018-08-06 11:41:29.0
Update Date: 2018-08-06 11:41:29.0
Expiration Date: unknown
Title: Alert
Description: Alert-- Las Vegas north Grand -- Gallegos mobile home park -- utility repairs Monday to Friday from August 5 to September 6 -- 7:00 a.m. to 5:30 p.m. Please reduce speed and use cation in area.
Post Date: 2018-08-06 10:28:32.0
Update Date: 2018-08-06 10:28:32.0
Expiration Date: 2018-09-06 05:30:00.0
Title: Interstate 10 eastbound from mile marker 130 to mile marker 132
Description: MWI, Inc. (Contractor) will begin installation of the Intelligent Transportation System (ITS). Traffic can expect intermittent lane closures and shoulder work in the area. Hours of operation will be from 7:00 am to 5:30 pm, Monday through Thursday. Construction is expected to be completed by fall 2018.
Post Date: 2018-06-29 08:48:39.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
Title: US 285 southbound from mile marker 39 to mile marker 45
Description: Pavement Rehabilitation is underway on US 285 southbound lanes between mm 39 and mm 45 (North of Carlsbad). Motorists can expect a one lane closure for paving operations where traffic will be diverted into one southbound lane. Work is expected to be completed 8/16/18 - weather permitting. Please obey all posted signage, reduce your speed and watch for Personnel and Equipment in this area. Contractor: Brasier Asphalt Inc.; NMDOT Contact: Donna Gililland 575-626-4857
Post Date: 2018-07-27 12:09:31.0
Update Date: 2018-08-07 08:51:04.0
Expiration Date: unknown
Title: US 380 from mile marker 156 to mile marker 229
Description: Roadwork-Chip Sealing of US 380 from mm 156 (East of Roswell) to mm 229 (Tatum) will begin Monday July 30th, 2018 and is expected to be completed by August 27th, 2018 weather permitting. Working hours will be from 6:00 AM to 5:00 PM Monday through Thursday and end early on Friday at 12:00 PM. Speed limit has been reduced to 45 MPH within the work zone area. Motorists should expect some delays with lane closures both East and Westbound, pilot car operations, flaggers and traffic control. Please use caution, reduce speed, obey all posted signage and message boards and watch for all personnel and equipment in the area. Contractor: FNF Construction Inc., Tracy Turner (575) 313-2323, Project Manager; NMDOT Project Manager Richard Marquez (575) 840-9796.
Post Date: 2018-07-27 11:07:08.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: New Mexico 498 at mile marker 0
Description: Hasse Contracting Co., Inc. (Contractor) will continue with bridge replacement and roadway reconstruction. NM 498 will be closed from McNutt to Futurity Drive; detour is in place on Sunland Park Drive. The Contractors hours of operation will be from 7:00 am to 5:00 pm Monday to Friday. Construction is scheduled to be completed by winter 2018.
Post Date: 2017-10-20 13:04:26.0
Update Date: 2018-06-26 07:21:49.0
Expiration Date: unknown
Title: US 380 at mile marker 107 Hondo.
Description: Trucks over 65 foot are prohibited on US 380 between Hondo and Carrizozo. This is a PERMANENT ALERT.
Post Date: 2017-02-17 08:17:49.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: I 25 at mile marker 364 (WATROUS).
Description: Crash -- Watrous -- passing lane is closed due to an accident. Please reduce speed and use caution in area. Event will be updated as condition changes. ‚Äč
Post Date: Fri Aug 17 00:46:32 MDT 2018
Update Date: 2018-08-17 00:46:39.0
Expiration Date: unknown
Title: New Mexico 124 eastbound and westbound from mile marker 0 to mile marker 8
Description: NM 124 HAS A PERMANENT HEIGHT RESTRICTION INPLACE. All CMV's and high profile vehicles are PROHIBITED on NM 124, from mile marker 0-8 (from Skyway at Exit 89 to McCartys at Exit 96) due to a low 13" clearance of a concrete box culvert and no turn-around space. This event will be updated as conditions change.
Post Date: 2018-06-15 07:58:27.0
Update Date: 2018-08-14 07:59:32.214
Expiration Date: unknown
Title: US 550 northbound and southbound from mile marker 115 to mile marker 143
Description: US 550 - There will be various lane closures due to pavement preservation work. Work is scheduled to be completed Mid- August, 2018. Dismuke Construction is the contractor. Drivers are advised to use caution and observe traffic control signing.
Post Date: 2018-07-13 09:36:34.0
Update Date: 2018-07-13 09:36:34.0
Expiration Date: unknown
Title: I 25 from mile marker 450 (RATON SOUTH) to mile marker 454.
Description: Roadwork (Raton Port of Entry) north/southbound driving lanes are closed. Speed reduced to 45 mph. Drivers should proceed through the work zone with caution, slow down and watch for construction personnel and equipment. Event will be updated as condition changes.
Post Date: Fri Aug 10 11:29:39 MDT 2018
Update Date: 2018-08-10 11:29:50.0
Expiration Date: unknown
Title: NM 518 from mile marker 1 to mile marker 4.
Description: Lane Closure -- Legion Avenue to Storrie Lake -- roadwork with lane closure from 6:00 a.m. to 8:00 p.m. Please reduce speed and use caution in area. Schedule may change due to weather condition. Event will be updated as condition changes.
Post Date: Fri Aug 10 10:59:18 MDT 2018
Update Date: 2018-08-10 10:59:50.0
Expiration Date: unknown
Title: US 380 at mile marker 66 Carrizozo.
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.
Post Date: 2017-01-06 12:52:40.0
Update Date: 2018-08-16 14:52:24.366
Expiration Date: unknown
Title: New Mexico 120 from mile marker 4 to mile marker 12
Description: (Black Lake to Ocate) Unpaved road -- may be impassable during inclement weather proceeed at your own risk.
Post Date: 2018-01-05 21:28:02.0
Update Date: 2018-08-10 11:28:56.303
Expiration Date: unknown
Title: Interstate 10 eastbound and westbound at mile marker 85 (DEMING EAST)
Description: The New Mexico Department of Transportation will have maintainers on the roadway for bridge deck repairs. Traffic will encounter lane closures on both eastbound and westbound lanes. Speed limits will be reduced to 55 mph, closures and traffic control shall remain in place 24 hours a day 7 days a week. Motorists are asked to reduce speed, obey posted signs, and use extreme caution, as well as continue to be cautious of heavy equipment and construction personnel in the area. Construction hours will be Monday through Thursday from 7:00 am to 5:30 pm and is expected to be completed by September 2018.
Post Date: 2018-08-03 10:05:04.0
Update Date: 2018-08-13 07:41:54.042
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Traffic Nearby

More Local Information

Bookmark and Share

Ruidoso weather and traffic updates by locals

Write your own Ruidoso, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read the Terms of Service and the Ruidoso, NM report and/or forecast you are posting is in compliance with such terms. Be respectful. An inappropriate Ruidoso, NM report and/or forecast will be removed by a moderator.
Click for Free 5 Minute membership Trial