San Juan Pueblo Traffic and Road Conditions

San Juan Pueblo Traffic Map

No Traffic Flow? Zoom in Closer

How to use the San Juan Pueblo Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

San Juan Pueblo Traffic Alerts

Title: Roadwork, I 40 from mile marker 37, Iyanbito to mile marker 40, Travel Center.
Description: Roadwork~~~Roadwork on I-40 from mile marker 37-40 Ciniza Refinery). I-40 is reduced to one lane in each direction. Eastbound traffic is diverted onto the westbound passing lane via median crossover detour. Speed reduced to 55mph through the work zone. 11' width restriction. PLEASE BE COURTEOUS AND USE ZIPPER MERGE TO REDUCE CONGESTION AND DELAYS. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-03-25 08:01:21.0
Update Date: 2021-09-02 08:06:51.0
Expiration Date: unknown
Title: Roadwork, NM 39 from mile marker 49 Mosquero to mile marker 68 Roy.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway Motorists can anticipate various lane and shoulder restrictions. Delays are expected.
Post Date: 2021-08-25 12:42:27.0
Update Date: 2021-08-25 12:42:27.0
Expiration Date: unknown
Title: Lane Closure, I 40 from mile marker 218, Clines Corners (CLINES CORNERS/US 285) to mile marker 233, 15 miles east of Clines Corner.
Description: Lane Closure~~~A pavement rehabilitation project is set to begin on June 14th, 2021, along both the eastbound and westbound sides of I40. One 5-mile stretch of roadway will be closed, Monday through Friday, while crews work to rehabilitate the roadway. Travelers can expect delays of 20 to 25 minutes through the construction zone, especially during peak hours between 12pm and 6pm. This project is expected to be completed in November 2021. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2021-07-21 16:53:30.0
Update Date: 2021-07-21 16:53:30.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 364, (WATROUS) to mile marker 370, 18 miles north of Las Vegas.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change
Post Date: 2021-06-16 13:33:22.0
Update Date: 2021-08-05 14:38:56.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~Northbound lanes have been closed and two way traffic has been placed on southbound lanes. Motorist can expect minor delays.
Post Date: 2021-06-16 13:27:31.0
Update Date: 2021-08-05 14:38:42.0
Expiration Date: unknown
Title: Roadwork, US 54 at mile marker 304 Montoya / Tucumcari.
Description: Roadwork~~~US 54 from mile marker 303 to mile marker 305. The New Mexico Department of Transportation District Four will have road construction on U.S. 54 between mile posts 303 to 305. Please drive with caution, reduce speed and obey all posted traffic signs. The traveling public is advised to expect minor delays. (ET Construction)
Post Date: 2021-06-16 13:21:24.0
Update Date: 2021-06-30 10:39:39.0
Expiration Date: unknown
Title: Roadwork, I 10 at mile marker 162, (ANTHONY).
Description: Roadwork~~~AUI, Inc. (Contractor) is continuing with roadwork and replacement of the NM 404 Bridge over I-10 at milepost 162, Anthony exit. Detours for I-10 EB exit/entrance ramps at the Anthony exit are now in operation, motorists should be on alert for the new traffic pattern at the intersection with NM 404. Beginning Wednesday, August 25, I-10 westbound lanes will be closed at 8 p.m. until 6 a.m. and again on Friday, August 27 eastbound lanes from 8 p.m. to 6 a.m. for bridge girder placement. During these closures, traffic will be detoured through the on – off ramps at milepost 162 (NM 404). Daily contractor hours of operation are from 7 a.m. to 5 p.m., Monday through Friday. Traffic control will remain in place 24/7.
Post Date: 2021-01-13 14:58:54.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Roadwork, NM 281 from mile marker 3 to mile marker 6.
Description: Roadwork~~~Shoulder work.
Post Date: 2021-08-11 11:13:25.0
Update Date: 2021-08-11 11:13:25.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 80 to mile marker 88. Left lane closed.
Description: Roadwork~~~Roadwork consisting of milling and overlaying has started on both North and Southbound lanes of US 285 from mm 80 to mm 88 (North of Artesia). Motorists should expect intermittent left lane closures throughout the work zone. Speed limit has been reduced to 50MPH. Estimated completion is 40 days (weather permitting). Brasier Asphalt Superintendent: Gilbert Clemente; 575-494-6311. NMDOT Project Manager: Zusset Nieto; 575-500-2344.
Post Date: 2021-08-31 14:14:21.0
Update Date: 2021-09-01 09:03:26.0
Expiration Date: unknown
Title: Roadwork, NM 170 at mile marker 19.
Description: Roadwork~~~Blade Patching On NM-170, Mile Post 19.3, We will have Traffic Control In Place, with Flag Men, Work will Begin on the Road at 9:00 am
Post Date: 2021-08-31 08:49:51.0
Update Date: 2021-08-31 08:49:51.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 44, 19 miles east of Lordsburg to mile marker 55, (QUINCY).
Description: Roadwork~~~Mountain States Construction, Inc. (Contractor) are excited to announce the upcoming roadway rehabilitation project on Interstate 10 from milepost 45 working eastbound to milepost 55 (Quincy). Drivers can expect various daytime lane closures on the right lanes as well as overnight lane closures as needed. Contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday. Construction is expected to be completed fall of 2021.
Post Date: 2021-08-24 14:25:36.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Roadwork, NM 187 from mile marker 16 to mile marker 31.
Description: Roadwork~~~FNF Construction, Inc. (Contractor) is continuing with replacement of Bridges located in Arrey and Caballo. A shoo-fly diversion is in place at King Canyon (MP 20) and at Seco Creek (MP 26.6). NM 187 is completely open to traffic. Contractor’s hours of operation will be from 7:00 am to 5:00 pm Monday to Friday.
Post Date: 2021-01-19 08:04:32.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Roadwork, NM 68 northbound and southbound from mile marker 6 to mile marker 10.
Description: Roadwork~~~One lane will be closed for roadwork in each direction from 7:00 AM to 7:00 PM, Monday through Friday. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2020-09-15 10:02:28.0
Expiration Date: unknown
Title: Alert, NM 124 from mile marker 0 to mile marker 8.
Description: Alert~~~NM 124 HAS A PERMANENT HEIGHT RESTRICTION IN PLACE. All CMV's and high profile vehicles are PROHIBITED on NM 124, from mile marker 0-8 (from Skyway at Exit 89 to McCartys at Exit 96) due to a low 13' clearance of a concrete box culvert and no turn-around space. This event will be updated as conditions change.
Post Date: 2020-01-14 15:29:13.0
Update Date: 2021-09-02 08:03:55.0
Expiration Date: unknown
Title: Closure, NM 281 at mile marker 2.
Description: Closure~~~Access to County Road C22R is closed
Post Date: 2021-09-07 21:15:58.0
Update Date: 2021-09-07 21:15:58.0
Expiration Date: unknown
Title: Roadwork, NM 15 from mile marker 43 to mile marker 0.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be performing “Chip Sealing and Brooming” operations in Grant Co. Speed limits will be reduced, no center stripe with loose gravel on roadway. Traffic will encounter lane drops with pilot car and flagging operations.
Post Date: 2021-08-03 07:52:28.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 112, 27 miles east of Grants to mile marker 117, Mesita Interchange.
Description: Roadwork~~~Roadwork on I-40,mile marker 112-117 (from Laguna to Mesita). Two lanes are open to westbound traffic and one lane for eastbound traffic. Eastbound on and off ramps are closed at Exit 114. There is a 12’ width restriction in place Speed reduced to 55mph through the work zone. All work will be performed Monday through Friday 7am-6pm. DURING BACKUPS, PLEASE USE BOTH LANES AND TAKE TURNS MERGING AT CONSTRUCTION ZONE. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-09-01 09:18:42.0
Update Date: 2021-09-02 08:03:38.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 34, 7 miles south of Hatch to mile marker 39, 2 miles south of Hatch.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) has begun a roadway reconstruction project on I-25 north of Las Cruces. A detour crossover will be in place, all traffic will be shifted into the southbound lanes utilizing crossover detour and barrier wall separation. The Rincon, exit 35 northbound on and off ramps will be closed, southbound exit is open, follow detour signage. This closure is expected for the next three months. Hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday. Traffic control will remain in place 24/7.
Post Date: 2021-06-01 11:23:40.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Alert, US 82 at mile marker 16 Cloudcroft.
Description: Alert~~~US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles! STEEP GRADES, NUMEROUS TIGHT TURNS AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route- US 62/180 or US 70. THIS IS A PERMANENT ALERT.
Post Date: Thu Jan 28 09:43:06 MST 2021
Update Date: 2021-09-23 10:25:05.0
Expiration Date: unknown
Title: Closure, I 40 at mile marker 26, Gallup East Interchange.
Description: Closure~~~Westbound I-40 is closed and Eastbound passing lane closed on I-40, mile marker 26.3 (East Gallup Interchange) due to a crash. All westbound traffic is being diverted onto NM 118 at Exit 26. Follow detour. WATCH FOR SLOW MOVING TRAFFIC AND EMERGENCY RESPONSE PERSONNEL AND VEHICLES. Please reduce speed in the area. This event will be updated as conditions change.
Post Date: Thu Sep 23 09:40:35 MDT 2021
Update Date: 2021-09-23 10:03:28.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 81, West Grants (McDonald’s/San Rafael) Interchange to mile marker 82, Grants.
Description: Roadwork~~~I-40 is reduced to one lane in both directions at Exit 81 (San Rafael) due to bridge work. Speed reduced to 55mph through the work zone. NM 53 is also reduced to one lane. Follow detour signs. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-08-19 14:03:09.0
Update Date: 2021-09-02 08:04:12.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 275 to mile marker 285 Hondo.
Description: Roadwork~~~Project on US70 between Mile Marker 275 and Mile Marker 285, west of Roswell, NM. Expect one lane closures. Motorists should obey all posted speed limits and construction signage. Also watch for personnel and equipment in this area. Completion is expected Winter 2021. Contractor: Fisher Sand and Gravel Fisher Project Manager: Frank Lozano 575-249-9390 Fisher Project Superintendent: Shane Quimby 928-242-9780 Fisher Traffic Control: Terry Werito 505-249-1978 NMDOT Project Manager: Donna Gililland 575-626-4857
Post Date: Thu Aug 19 09:36:40 MDT 2021
Update Date: 2021-09-23 09:37:41.0
Expiration Date: unknown
Title: Roadwork, US 380 from mile marker 72 to mile marker 74.
Description: Roadwork~~~Bridge Reconstructions is underway between MP 27 and MP 74 on US 380. The Speed Limit is reduced to 45 MPH applying to the Work Zones and a temporary detour bridge is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2022. Aaron Clark NMDOT Project Manager 575-626-9817; Contractor; Tony Sam, FNF Construction Project Manager 480-209-3636; Bill Moss, FNF Construction Traffic Control Supervisor 505-350-7409
Post Date: 2021-07-15 13:52:16.0
Update Date: 2021-08-27 10:20:39.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16 @ Malaga to mile marker 18.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Willie McCray Jr. (575) 626-9882.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2021-03-05 11:50:38.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 0 to mile marker 8.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Willie McCray Jr. (575) 626-9882.
Post Date: 2020-08-13 14:51:47.0
Update Date: 2021-01-28 10:37:37.0
Expiration Date: unknown
Title: Alert, NM 104 from mile marker 70 to mile marker 90.
Description: Alert~~~NMDOT has set a weight limit of 25 tons on this roadway as well as a reduced speed of 30 MPH. This event will update as conditions change
Post Date: 2021-05-06 13:27:36.0
Update Date: 2021-05-06 13:27:36.0
Expiration Date: unknown
Title: Roadwork, NM 128 from mile marker 12 to mile marker 29. Roadway closed.
Description: Roadwork~~~Construction for Highway 128 between 11.8 miles east of the NM128/NM31 Junction and will continue for 17.345 miles until milepost 28.838. Expect delays, obey traffic and speed signs, and use caution while driving. There will be a restriction of 11 feet in width on the project. The intent of this project is a Full Depth Reclamation of the travel lanes, overlay of the travel lanes and shoulders, mill of transitions at the BOP and EOP, Traffic Control During Construction, Permanent Signing and striping, and removal and replacement of rumble strips. Emergency Contact List for the 2104340 project: Contractor: Constructors, Inc., Project Manager- Gabriel Ortega (575) 496-9397, Superintendent-Dave Simpson (623) 249-0070. Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938, Project Safety Office- Tami Mandel (505) 697-1787- Project RRO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2020-11-05 10:45:02.0
Update Date: 2021-09-17 09:06:01.0
Expiration Date: unknown
Title: Lane Closure, US 64 at mile marker 145, 9 miles east of Dulce.
Description: Lane Closure~~~Meridian Contracting has begun rehabilitation work on the bridge at Mile Marker 144.73 in Rio Arriba County. The project is expected to last 120 working days and will include the replacement of the bridge joint seals, slope stabilization, drainage improvements and the installation of an epoxy urethane deck overlay, among many other improvements. Traffic will be reduced to one lane across the bridge, and mobile traffic control devices will be in operation 24 hours a day to allow the public to safely proceed through the work zone. Motorists are advised to expect delays through the area and to plan accordingly.
Post Date: 2021-08-05 07:42:14.0
Update Date: 2021-08-05 07:42:14.0
Expiration Date: unknown
Title: Roadwork, NM 152 from mile marker 43 to mile marker 47.
Description: Roadwork~~~The Federal Highway Administration ? Central Federal Lands Highway Division (FHWA?CFLHD) has started replacement of truss bridges project on NM 152. The two existing bridges on NM 152 are between Hillsboro and Kingston, milepost 46 and 43. The contractor is currently building the new bridges. Watch for roadway reconstruction and large trucks turning. A shoo-fly style detour as well as temporary traffic signals will be in place 24/7 for traffic control. Contractor’s hours are Monday through Friday from 7:00 a.m. until 5:00 p.m.
Post Date: 2021-02-04 11:18:30.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Lane Closure, I 40 from mile marker 17, Mentmore to mile marker 40, Travel Center.
Description: Lane Closure~~~Eastbound and westbound I-40 will be reduced to one lane at various locations from mile marker 17-40 (from Gallup to Ciniza Refinery) due to guardrail work. Speed is reduced to 55mph through the work zone. There is a 12' width restriction in place. All work will be performed Monday-Friday 7am-7pm until work is complete. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-09-03 09:58:27.0
Update Date: 2021-09-02 08:07:06.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~Work has begun on the realignment of the southbound exit ramp from NM 599 to US 84/285. The project will include realignment of the NM 599 southbound on-ramp to US 84/285, addition of a 1,200-foot acceleration lane, installation of median wall barrier to replace the aging/sub-standard median wall barrier between NM 599 and the Guadalupe St. exit, and the closure of Viento Drive access to/from US 84/285. Access to Viento Drive would still be available from Calle Mejia. Work is expected to be completed in November 2021. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2021-06-03 12:28:18.0
Update Date: 2021-06-03 12:28:18.0
Expiration Date: unknown
Title: Lane Closure, NM 502 eastbound and westbound from mile marker 3 to mile marker 4.
Description: Lane Closure~~~One lane will be closed in each direction for construction of the Canyon Rim Trail underpass. Construction is expected to be completed by October, 2021. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2021-06-03 08:39:37.0
Update Date: 2021-06-03 08:39:37.0
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 107 Artesia to mile marker 139. , right shoulder, and left shoulder
Description: Roadwork~~~Roadwork~~Roadway Construction on US 82 between MP 107.65 to MP 139.07 has been completed. No speed restrictions. Seeding and cleanup throughout project are still ongoing. Expected completion date is October 15. Contractor: Fisher Sand and Gravel- Superintendent, Shane Quimby (928) 242-9780; Traffic Control Supervisor- Raymond Reeves (505) 373-7314; NMDOT Project Manager- Donna Gililland (575) 626-4857.
Post Date: 2020-01-02 12:39:45.0
Update Date: 2021-09-17 09:06:39.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 145 Ancho to mile marker 152, 18 miles south of Corona.
Description: Roadwork~~~Roadway Reconstruction is underway between MP 145 and MP 152 on US 54. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2021. Aaron Clark NMDOT Project Manager 575-626-9817; Contractor; James Houston, Superintendent, MSCI 505-681-9761
Post Date: 2019-08-01 16:06:56.0
Update Date: 2021-02-23 13:12:13.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 8 PORT ENTRY DEFIANCE/MANUELITO Interchange to mile marker 16, GALLUP WEST Interchange.
Description: Roadwork~~~Roadwork at various location on I-40, mile marker 8-16 (from the Port of Entry to West Gallup Interchange) for guardrail installation. Lane closures at various locations. 12' width restriction in place. Speed reduced to 55mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-04-01 08:48:07.0
Update Date: 2021-09-02 08:02:57.0
Expiration Date: unknown
Title: Lane Closure, US 70 from mile marker 166 to mile marker 169.
Description: Lane Closure~~~The New Mexico Department of Transportation (NMDOT) will be performing roadway repairs due to recent flooding on US 70 from milepost 166 to 168. Lane closures will be in place in both the eastbound and westbound lanes as needed, speed limits will be reduced to 45 mph. Closures will be in place Monday through Thursday from 8: 00 until 4:30 pm.
Post Date: 2021-08-14 20:53:12.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Alert, I 10 eastbound at mile marker 54, 27 miles west of Deming.
Description: Alert~~~Yucca Rest area is closed due to no power. The NMDOT will remove once reopened.
Post Date: 2021-09-11 11:58:31.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 274 Glencoe to mile marker 287.
Description: Roadwork~~~Hasse Contracting will be working on Bridge Preservation of Bridges #9295, #9298, #9300, #9313 and #9293. To include deck and approach slab concrete repair, resealing deck and bridge joints, overlaying bridge deck and approach slabs. Traffic Control during construction, permanent striping and miscellaneous construction. Hasse's Project Superintendent is Bryant Millwee Cell # 480-272-2617 Hasse's Traffic Control Supervisor is Reyes Pinto Cell # 505-382-9171 NMDOT Project Manager Donna Gililland Cell # 575-626-4857.
Post Date: 2021-04-26 15:56:03.0
Update Date: 2021-09-09 16:34:43.0
Expiration Date: unknown
Title: Alert, NM 513 at mile marker 0.
Description: Alert~~~Closure The New Mexico Department of Health (NMDOH) has detected community spread in the state. Salinas National Park is CLOSED DUE TO COVID-19.
Post Date: 2020-03-23 13:40:40.0
Update Date: 2020-03-23 13:40:40.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 144, (I-10/I-25) to mile marker 164, Anthony.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) District One will be continuing a nighttime crack sealing operation on I-10 from Las Cruces to the Texas Stateline. Motorists can expect lane closures on various lanes from milepost 144 to 164(Texas Stateline), one lane of traffic will remain open. Starting Friday, crews will begin working in the westbound lanes, the Port of Entry will be closed over the weekend. These closures will be from 7 p.m. until 5 a.m. daily. Speed limits will be reduced. Project is expected to be completed by the end of September.
Post Date: 2021-08-23 20:35:19.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Construction Closure, Construction Closure
Description: Construction Closure~~~I-40 EB & WB milepost 177 at Zuzax (Project A301345) I-40 and NM 333 at Sedillo Hill Road will have various lane and shoulder restrictions daily, through September 30th. Work is being performed for bridge construction. Motorists should anticipate delays. Contractor: AUI Inc. NMDOT PM: Jeremy Maestas
Post Date: 2021-08-23 13:45:34.0
Update Date: 2021-09-10 13:54:21.0
Expiration Date: 2021-09-30 23:59:00.0
Title: Lane Closure, I 25 northbound and southbound from mile marker 290, (US 285) to mile marker 291, Eldorado.
Description: Lane Closure~~~One lane will be closed in each direction on I25 for bridge rehabilitation work beginning 11/16/2020 at 8:00 AM. Work is expected to be completed by 1/29/2021, weather permitting. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2020-11-16 07:25:22.0
Update Date: 2020-11-16 07:25:22.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 413, Springer to mile marker 414, (SPRINGER NORTH).
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-03-15 08:50:16.0
Update Date: 2021-08-05 14:37:28.0
Expiration Date: unknown
Title: Lane Closure, US 64 westbound from mile marker 52, Farmington E Elm St to mile marker 53, Farmington Bloomfield Hwy.
Description: Lane Closure~~~Oldcastle SW Group will begin a pavement preservation project on Monday, September 13 2021 on US 64 (East Broadway). Westbound traffic will be reduced to one lane from 7:00am until 6:00pm each day. Left hand turn from the eastbound traffic lanes may be detoured to Malta Avenue, depending on the traffic control configuration each day. Work is expected to be completed by October 8, 2021. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2021-09-13 10:51:12.0
Update Date: 2021-09-13 10:51:12.0
Expiration Date: 2021-10-08 18:00:00.0
Title: Roadwork, US 84 northbound and southbound from mile marker 195 Hernandez to mile marker 198 Chili.
Description: Roadwork~~~Cutler Repaving has started a pavement preservation project on US 84 in both directions, from mile marker 195 to 198. One lane will be closed in each direction from 7:30am until 6:30pm, Monday through Saturday. Work is expected to be completed by October 1, 2021.
Post Date: 2021-09-13 10:00:24.0
Update Date: 2021-09-13 10:00:24.0
Expiration Date: 2021-10-01 17:10:00.0
Title: Closure, Closure
Description: Closure~~~SANTO DOMINGO PUEBLO WILL BE CLOSED FOR EVERYONE WHO IS NOT RESIDENTIAL. Be advised the ONLY entrance open to residents, which will be monitored by law enforcement. (ONLY TRIBAL RESIDENTS). Safety precautions during the COVID-19
Post Date: 2020-04-13 16:26:37.0
Update Date: 2020-04-13 16:26:37.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44 to mile marker 45.
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2021-04-30 08:17:27.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 458, 3 miles south of CO to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~I-25 northbound and southbound from mile marker 458, 3 miles south of CO to mile marker 460, (RATON PASS/PORT OF ENTRY). The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-07-06 15:04:02.0
Update Date: 2021-08-05 14:38:35.0
Expiration Date: unknown
Title: Roadwork, NM 176 from mile marker 10 to mile marker 26. Roadway closed.
Description: Roadwork~~~Road Construction is ongoing for Highway 176 between milepost 10 and milepost 26.3 for 16.3 miles. Expect delays. Construction will include roadway rehabilitation, widening of roadway and shoulders. There is a width restriction of 10 feet on this highway. There will be several detours throughout the construction zone where the speed limit will be 35 MPH. May encounter pilot car operations. Contact Information Supervisor Curtis Been- 575-538-1613. Project Manager Jason Stailey- 575-388-1546 extension 2735. Traffic Control Supervisor Harry Hatter- 970-529-3500. NMDOT: Project Manager John Lara- 575-840-9625.
Post Date: 2020-10-05 10:31:06.0
Update Date: 2021-09-17 09:06:11.0
Expiration Date: unknown
Title: Lane Closure, NM 96 eastbound and westbound from mile marker 31 Arroyo del Agua to mile marker 32. Roadway closed.
Description: Lane Closure~~~One lane closed for bridge and road repairs. A pilot car is on hand to guide travelers through the construction zone. THERE IS A 12' WIDTH RESTRICTION IN PLACE UNTIL FURTHER NOTICE. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-10-05 07:54:09.0
Update Date: 2020-10-05 07:54:09.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 21, Shakespeare to mile marker 25, Lordsburg.
Description: Roadwork~~~AUI, Inc. (Contractor) is currently working on the bridge deck on the eastbound lanes. All traffic is currently shifted to the westbound lanes. The Exit 22 on ramp will be closed but Exit 22 off ramps will remain open, local traffic only. All oversized loads will need to utilize Exit 20, eastbound port of entry is open for all CMV traffic. Detour signs will be in place to direct traffic towards alternate routes. Animas St. will be unaffected and can be utilized in place of Main St. Daily hours of operation are 7 a.m. to 5 p.m., Monday through Friday. Traffic control will remain in place 24/7.
Post Date: 2021-05-03 11:47:42.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Lane Closure, I 25 at mile marker 41, (NM 26/HATCH).
Description: Lane Closure~~~I-25 northbound driving right lane is closed due to roadway repairs, this lane closure will be in place until roadway repairs can be made. The bridge at Exit 41(Hatch) will have a 15 ton weight limit in the westbound lanes, detour signage will be in place for heavier loads. Motorists are asked to reduce speed, obey posted signs, and watch for emergency personnel, use extreme caution. Please expect delays, seek an alternate route.
Post Date: 2021-08-02 12:52:23.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: Lane Closure, NM 50 at mile marker 1.
Description: Lane Closure~~~One lane is closed at mile marker 1 for a bridge replacement project. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: Mon Aug 02 08:59:53 MDT 2021
Update Date: 2021-09-20 10:18:54.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 57, South Chaves to mile marker 60, 20 miles west of Grants.
Description: Roadwork~~~Roadwork on I-40, mile marker 57-60 (between Thoreau and Prewitt). I-40 is reduced to one lane in each direction. Westbound traffic is diverted onto the eastbound passing lane via median crossover detour. Speed reduced to 55mph through the work zone. 12' width restriction. Work hours are Monday-Friday from 7am to 5pm daily. PLEASE USE BOTH LANES AND TAKE TURNS MERGING AT CONSTRUCTION ZONE. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-03-01 09:26:20.0
Update Date: 2021-09-02 08:06:27.0
Expiration Date: unknown
Title: Roadwork, US 180 at mile marker 115.
Description: Roadwork~~~James Hamilton Construction Company (Contractor) will be continuing roadwork on US 180. Traffic can expect a lane closure on the eastbound and westbound lanes as well as shoulder work throughout the intersection on US 180 and 32nd Street to Ranch Club Rd. Paving is currently in process and RT Electric is continuing installation of new traffic signals. Contractor hours of operation will be Monday through Friday from 7:00 a.m. till 5:00 p.m. This project is estimated to be completed by end of summer 2021.
Post Date: 2021-01-29 13:28:37.0
Update Date: 2021-09-23 08:22:25.288
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Alert, Alert
Description: Alert~~~I-40 EB & WB milepost 139 will have various lane and shoulder restrictions nightly, starting September 27th through October 31st from 8pm to 5am. for interstate maintenance and improvements. Contractor: Uretek USA
Post Date: 2021-09-10 13:51:37.0
Update Date: 2021-09-15 12:13:14.0
Expiration Date: 2021-10-31 23:59:00.0
Title: Roadwork, US 60 from mile marker 360 to mile marker 369.
Description: Roadwork~~~Mill and Inlay on US60/84 from MP 360.15 to MP 368.75. Traffic will be reduced to one lane with pilot car operations. Speed limit will also be reduced to 45 MPH with expected delays. Please follow all posted signage and be aware of all personnel/equipment in the work zone. Expected completion date weather permitting is fall of 2021. Cutler Repaving – Marcus Jacobs (785)766-2408 NMDOT – Thomas McAlister (575)840-8853.
Post Date: 2021-08-06 10:33:49.0
Update Date: 2021-09-17 07:30:13.0
Expiration Date: unknown
Title: Roadwork, NM 83 from mile marker 0 Lovington to mile marker 1. Roadway closed.
Description: Roadwork~~~Construction for NM83/ NM82/ and NM18 in the Coty of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Expect delays, obey all traffic and speed signs, and use caution while driving. Once detours are set up for the road work there will be a restriction of 11 feet in width on the project. Construction for the project is scheduled to last 410 working days. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drivepads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2104340 project: Contractor: Constructors, Inc., Project Manager- Gabriel Ortega (575) 496-9397, Superintendent-James King (575) 885-8838. Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938, Project Safety Office- Tami Mandel (505) 697-1787- Project RRO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2021-09-17 09:06:25.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Fair 63°F
30.30in
Barometer
28%
Humidity
North 0.0mph
Wind
Fair

More Local Information

Bookmark and Share

Traffic Nearby

Go Ad Free - Become a Member

San Juan Pueblo weather and traffic updates by locals

Write your own San Juan Pueblo, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the San Juan Pueblo, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate San Juan Pueblo, NM report and/or forecast will be removed by a moderator.