Sandia Park Traffic and Road Conditions

Sandia Park Traffic Map

No Traffic Flow? Zoom in Closer

How to use the Sandia Park Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Sandia Park Traffic Alerts

Title: Roadwork, US 54 from mile marker 231, 10 miles south of Santa Rosa to mile marker 242 Newkirk.
Description: Roadwork~~~Crack Seal operation is in place with a pilot car operation. Expect minor delays. This event will update as conditions change.
Post Date: 2021-04-28 09:29:31.0
Update Date: 2021-04-28 09:29:31.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 37, Iyanbito to mile marker 40, Travel Center.
Description: Roadwork~~~Roadwork on I-40 from mile marker 37-40 Ciniza Refinery). I-40 is reduced to one lane in each direction. Westbound traffic is diverted onto the eastbound passing lane via median crossover detour. Speed reduced to 55mph through the work zone. 11' width restriction. PLEASE BE COURTEOUS AND USE ZIPPER MERGE TO REDUCE CONGESTION AND DELAYS. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-03-25 08:01:21.0
Update Date: 2021-04-14 11:29:32.0
Expiration Date: unknown
Title: Alert, US 380 at mile marker 43.
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. THIS IS A PERMANENT ALERT.~~~
Post Date: 2017-05-17 14:04:16.0
Update Date: 2021-05-13 10:28:24.0
Expiration Date: unknown
Title: Roadwork, I 10 at mile marker 162, (ANTHONY).
Description: Roadwork~~~AUI, Inc. (Contractor) has begun roadwork on the replacement of the NM 404 Bridge over I-10 at milepost 162, Anthony exit. Detours for I-10 EB exit/entrance ramps at the Anthony exit are now in operation, so motorists should be on alert for the new traffic pattern at the intersection with NM 404. Traffic should expect lane closures on I-10 eastbound and westbound. Hours of operation will be from 7:00 a.m. until 5:00 p.m., Monday through Friday. Traffic control will remain in place 24/7.
Post Date: 2021-01-13 14:58:54.0
Update Date: 2021-04-09 13:27:50.0
Expiration Date: unknown
Title: Lane Closure, NM 77 from mile marker 0 to mile marker 7.
Description: Lane Closure~~~NMDOT crews will begin brooming on NM 77 from mm 0 to mm 7 (Pleasant Hill area). Motorists should expect delays, intermittent lane closures with pilot car operations and traffic control. Please use caution, reduce speed and watch for all personnel and equipment in the area. NMDOT contacts are Richard Marquez (575) 840-9796 and Robert Canelo (575) 626-2095.
Post Date: 2021-05-12 11:22:31.0
Update Date: 2021-05-14 09:34:07.0
Expiration Date: unknown
Title: Construction Closure, NM 537 northbound and southbound from mile marker 47 to mile marker 55.
Description: Construction Closure~~~One lane will be closed for roadwork until May 20, 2021. A pilot car will be escorting motorists through the work area. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2021-05-12 10:13:16.0
Update Date: 2021-05-12 10:13:16.0
Expiration Date: unknown
Title: Roadwork, NM 211 from mile marker 0 to mile marker 6 Cliff.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations in Grant Co. Speed limits will be reduced, no center stripe with loose gravel on roadway. "Fog Sealing" operations are scheduled to begin in the upcoming weeks. Traffic will encounter lane drops with pilot car and flagging operations.
Post Date: 2021-05-05 08:14:20.0
Update Date: 2021-05-14 09:46:50.0
Expiration Date: unknown
Title: Roadwork, NM 187 from mile marker 16 to mile marker 31.
Description: Roadwork~~~FNF Construction, Inc. (Contractor) has begun the replacement of Bridges located in Arrey and Caballo. Expect shoulder work operations for detour placement at milepost 31. This project has 6 structures that will get replaced, three of them bridges (Trujillo Canyon MP 17.1, Seco Creek MP 26.6, and King Canyon MP 30.8) additionally three others are concrete box replacements at milepost 19.52, 22.24 & 22.76. As demolition gets closer detours will be put in place onto I-25 from EXIT 59 (Caballo) to EXIT 63 (Hillsboro) and where it allows a shoo-fly style detour around the structure. Box replacement has begun at milepost 22.2. Traffic will need to utilize I-25 exit 63 and 59 to access locations on NM 187 for both sides of the bridge. A shoo-fly diversion is in place at King Canyon (MP 30.8), Seco Creek (MP 26.6) as well as Trujillo Canyon (MP 17.1). Contractor’s hours of operation will be from 7:00 am to 5:00 pm Monday to Friday.
Post Date: 2021-01-19 08:04:32.0
Update Date: 2021-04-09 13:21:40.0
Expiration Date: unknown
Title: Roadwork, NM 68 northbound and southbound from mile marker 6 to mile marker 10.
Description: Roadwork~~~One lane will be closed for roadwork in each direction from 7:00 AM to 7:00 PM, Monday through Friday. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2020-09-15 10:02:28.0
Expiration Date: unknown
Title: Alert, NM 124 from mile marker 0 to mile marker 8.
Description: Alert~~~NM 124 HAS A PERMANENT HEIGHT RESTRICTION IN PLACE. All CMV's and high profile vehicles are PROHIBITED on NM 124, from mile marker 0-8 (from Skyway at Exit 89 to McCartys at Exit 96) due to a low 13' clearance of a concrete box culvert and no turn-around space. This event will be updated as conditions change.
Post Date: 2020-01-14 15:29:13.0
Update Date: 2020-06-09 08:13:14.0
Expiration Date: unknown
Title: Alert, US 70 at mile marker 184.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: 2020-07-07 08:59:37.0
Update Date: 2021-05-13 10:28:56.0
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound from mile marker 112, 27 miles east of Grants to mile marker 117, Mesita Interchange.
Description: Roadwork~~~Roadwork on I-40,mile marker 112-117 (from Laguna to Mesita). Two lanes are open to westbound traffic and one lane for eastbound traffic. Eastbound on and off ramps are closed at Exit 114. There is a 12’ width restriction in place Speed reduced to 55mph through the work zone. All work will be performed Monday through Friday 7am-6pm. DURING BACKUPS, PLEASE USE BOTH LANES AND TAKE TURNS MERGING AT CONSTRUCTION ZONE. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-09-01 09:18:42.0
Update Date: 2021-04-20 14:27:01.0
Expiration Date: unknown
Title: Roadwork, US 180 from mile marker 121 Santa Clara to mile marker 122.
Description: Roadwork~~~James Hamilton Construction Company (Contractor) will be continuing the installation of the pedestrian trail which includes lighting, signing and pedestrian facilities. US 180 will have a lane closures on the eastbound and westbound right driving lanes with a reduced speed to 35 mph during working hours; traffic control will be in place for the safety of our construction workers. Contractor hours of operation will be Monday through Friday from 7:00 a.m. till 5:00 p.m. This project is estimated to be completed by spring 2021.
Post Date: 2020-07-30 10:56:22.0
Update Date: 2021-04-09 13:25:02.0
Expiration Date: unknown
Title: Alert, US 82 at mile marker 16 Cloudcroft.
Description: Alert~~~US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles! STEEP GRADES, NUMEROUS TIGHT TURNS AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route- US 62/180 or US 70. THIS IS A PERMANENT ALERT.
Post Date: 2021-01-28 09:43:06.0
Update Date: 2021-05-13 10:28:51.0
Expiration Date: unknown
Title: Roadwork, NM 48 from mile marker 2 to mile marker 3 Ruidoso.
Description: Roadwork~~~A Mountain Professional Contracting will be removing and replacing sidewalk in the Village of Ruidoso on Sudderth Street. The work will be on the south side of the street from Pine St to Center St. Construction will be ongoing from March 1, 2021 to May 27, 2021. There will be lane drops with a width restriction of 11'. Motorist and Pedestrians are asked to adhere to construction signing. Be on the lookout for Construction crews at work. A Mountain Professional Contracting Traffic Control Supervisor is Bobby Spedalieri, 575-650-5950. NMDOT Project Manager, Donna Gililland, 575-626-4857.
Post Date: 2021-02-25 14:32:58.0
Update Date: 2021-05-13 08:22:36.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16 @ Malaga to mile marker 18.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Willie McCray Jr. (575) 626-9882.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2021-03-05 11:50:38.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 0 to mile marker 8.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Willie McCray Jr. (575) 626-9882.
Post Date: 2020-08-13 14:51:47.0
Update Date: 2021-01-28 10:37:37.0
Expiration Date: unknown
Title: Alert, NM 104 from mile marker 86 to mile marker 88.
Description: Alert~~~NMDOT has set a weight limit of 25 tons on this roadway as well as a reduced speed of 30 MPH. This event will update as conditions change
Post Date: 2021-04-08 17:16:48.0
Update Date: 2021-04-08 17:17:44.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 264 to mile marker 275. Roadway closed.
Description: Roadwork~~~A Rehabilitation roadwork on US 70 from MP 264 to MP 275 - east of Ruidoso Downs to just east of Glenco, NM. This will result in lane drops, with reduced speed to 45 MPH through the work zones east and west bound. There will be an eleven foot width restriction throughout the construction. Construction is scheduled through the end of September 2021. Contractor: Mesa Verde Enterprises. Superintendent: Bryan Bennett, 575-415-5261. Traffic Control Supervisor: John Nappier, 575-430-3230. NMDOT Project Manager: Donna Gililland, 575-626-4857
Post Date: 2021-01-07 10:04:22.0
Update Date: 2021-05-13 08:22:06.0
Expiration Date: 2021-10-01 09:50:00.0
Title: Alert, NM 104 from mile marker 70 to mile marker 90.
Description: Alert~~~NMDOT has set a weight limit of 25 tons on this roadway as well as a reduced speed of 30 MPH. This event will update as conditions change
Post Date: 2021-05-06 13:27:36.0
Update Date: 2021-05-06 13:27:36.0
Expiration Date: unknown
Title: Roadwork, NM 128 from mile marker 12 to mile marker 29. Roadway closed.
Description: Roadwork~~~Construction for Highway 128 between 11.8 miles east of the NM128/NM31 Junction and will continue for 17.345 miles until milepost 28.838. Expect delays, obey traffic and speed signs, and use caution while driving. There will be a restriction of 11 feet in width on the project. The intent of this project is a Full Depth Reclamation of the travel lanes, overlay of the travel lanes and shoulders, mill of transitions at the BOP and EOP, Traffic Control During Construction, Permanent Signing and striping, and removal and replacement of rumble strips. Emergency Contact List for the 2104340 project: Contractor: Constructors, Inc., Project Manager- Gabriel Ortega (575) 496-9397, Superintendent-Dave Simpson (623) 249-0070. Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938, Project Safety Office- Tami Mandel (505) 697-1787- Project RRO Officer- Kelly Hicks (575) 302-8408 NMDOT ETSII-John Lara (575) 575-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2020-11-05 10:45:02.0
Update Date: 2021-05-14 14:46:16.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 88, 9 miles north of Tularosa to mile marker 118, 5 miles south of Carrizozo.
Description: Roadwork~~~ Roadworkis underway between MP 88 and MP 118 on US 54. Motorists should expect a right lane closure during the entirety of the project. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Spring of 2021. Aaron Clark NMDOT Project Manager 575-626-9817; Contractor, MSCI Mike Brown (505)-681-9168
Post Date: 2020-11-05 09:36:40.0
Update Date: 2021-03-21 18:15:35.0
Expiration Date: unknown
Title: Roadwork, NM 152 from mile marker 43 to mile marker 47.
Description: Roadwork~~~The Federal Highway Administration-Central Federal Lands Highway Division (FHWA-CFLHD) has started replacement of truss bridges project on NM 152. The two existing bridges on NM 152 are between Hillsboro and Kingston. The bridges are located five (MP 46) and seven (MP43) miles west of Hillsboro within Sierra County. The contractor has begun constructing detours on NM 152. Slow down and use caution in the area. Watch for shoulder work and large trucks turning on the roadway. Crews have closed the bridge near milepost 43. A shoo-fly style detour as well as temporary traffic signals will be in place 24/7 for traffic control. Contractor’s hours are Monday through Friday from 7:00 a.m. until 5:00 p.m.
Post Date: 2021-02-04 11:18:30.0
Update Date: 2021-05-12 13:49:55.0
Expiration Date: unknown
Title: Roadwork, NM 4 from mile marker 18 to mile marker 19.
Description: Roadwork~~~NM 4 is reduced to one lane in both directions from mile marker 18.5-19 (Jemez Springs) due to bridge construction. Traffic lights will guide traffic through the work zone. Expect minor delays. 11' width restriction in place. Speed reduced to 25mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-09-03 10:04:38.0
Update Date: 2020-09-25 12:15:46.0
Expiration Date: unknown
Title: Lane Closure, I 40 from mile marker 17, Mentmore to mile marker 40, Travel Center.
Description: Lane Closure~~~Eastbound and westbound I-40 will be reduced to one lane at various locations from mile marker 17-40 (from Gallup to Ciniza Refinery) due to guardrail work. Speed is reduced to 55mph through the work zone. There is a 12' width restriction in place. All work will be performed Monday-Friday 7am-7pm until work is complete. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-09-03 09:58:27.0
Update Date: 2021-04-01 08:24:34.0
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 107 Artesia to mile marker 139. , right shoulder, and left shoulder
Description: Roadwork~~~Roadwork~~Roadway Construction is underway East of Artesia on US 82 between MP 107.65 to MP 139.07. Motorists can expect a one lane closure with pilot car at various locations throughout the project due to construction activities with ROGFC, drainage structures and utilities, earthwork operations, and Utility work on the shoulders. Junction of NM 529 and US 82 Construction re-alignment posted speeds are 35 throughout this intersection. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Speed Limit through the Work Zones will be REDUCED to 35 MPH. The Maximum Posted Speed Limit during construction will be 55 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 842 working days. Expected completion date is June 2021. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Shane Quimby (928) 242-9780; Traffic Control Supervisor- Raymond Reeves (505) 373-7314; NMDOT Project Manager- Donna Gililland (575) 626-4857.
Post Date: 2020-01-02 12:39:45.0
Update Date: 2021-05-14 14:45:27.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 145 Ancho to mile marker 152, 18 miles south of Corona.
Description: Roadwork~~~Roadway Reconstruction is underway between MP 145 and MP 152 on US 54. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2021. Aaron Clark NMDOT Project Manager 575-626-9817; Contractor; James Houston, Superintendent, MSCI 505-681-9761
Post Date: 2019-08-01 16:06:56.0
Update Date: 2021-02-23 13:12:13.0
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound from mile marker 8 PORT ENTRY DEFIANCE/MANUELITO Interchange to mile marker 16, GALLUP WEST Interchange.
Description: Roadwork~~~Roadwork at various location on I-40, mile marker 8-16 (from the Port of Entry to West Gallup Interchange) for guardrail installation. Lane closures at various locations. 12' width restriction in place. Speed reduced to 55mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-04-01 08:48:07.0
Update Date: 2021-04-01 08:48:07.0
Expiration Date: unknown
Title: Roadwork, NM 456 at mile marker 44. Roadway closed.
Description: Roadwork~~~NM 456 at mile marker 44. Roadway closed due to severe flooding. A Detour is available with a width restriction of 16ft is in place for local traffic. This event will be updated as conditions change.
Post Date: 2020-08-29 23:56:04.0
Update Date: 2020-12-14 09:14:18.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 274 Glencoe to mile marker 287.
Description: Roadwork~~~Hasse Contracting will be working on Bridge Preservation of Bridges #9295, #9298, #9300, #9313 and #9293. To include deck and approach slab concrete repair, resealing deck and bridge joints, overlaying bridge deck and approach slabs. Traffic Control during construction, permanent striping and miscellaneous construction. Hasse's Project Superintendent is Bryant Millwee Cell # 480-272-2617 Hasse's Traffic Control Supervisor is Reyes Pinto Cell # 505-382-9171 NMDOT Project Manager Donna Gililland Cell # 575-626-4857.
Post Date: 2021-04-26 15:56:03.0
Update Date: 2021-05-13 08:21:35.0
Expiration Date: unknown
Title: Lane Closure, NM 48 at mile marker 1.
Description: Lane Closure~~~NMDOT crews will begin bridge repairs starting April 26th, 2021 on NM 48 at mm 1.62 (Ruidoso). Motorists should expect a lane closure at the intersection of NM 48 and Carrizo Creek. Working hours will be from 7:00 AM to 5:00 PM Monday through Friday. This project estimated completion will be 6-8 weeks from the starting date, weather permitting. Please use caution, reduce speed and watch for all personnel and equipment in the area. NMDOT contact is Daniel Davis (575) 626-7867.
Post Date: 2021-04-26 12:49:16.0
Update Date: 2021-05-13 10:28:46.0
Expiration Date: unknown
Title: Alert, NM 513 at mile marker 0.
Description: Alert~~~Closure The New Mexico Department of Health (NMDOH) has detected community spread in the state. Salinas National Park is CLOSED DUE TO COVID-19.
Post Date: 2020-03-23 13:40:40.0
Update Date: 2020-03-23 13:40:40.0
Expiration Date: unknown
Title: Roadwork, NM 371 from mile marker 75 to mile marker 82.
Description: Roadwork~~~Oldcastle SW Group, Inc. will reconstruct seven miles of NM 371 about 24 miles south of Farmington starting Monday, April 5, 2021. The area being improved is from milepost 82 on the north to milepost 75 on the south. Construction is expected to last about three months, through July 2021. Regular work hours will be Monday-Friday 7 a.m.-7 p.m., although the contractor may work extra hours or weekends if needed. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2021-04-19 09:59:26.0
Update Date: 2021-04-19 10:00:10.0
Expiration Date: unknown
Title: Roadwork, US 56 eastbound and westbound from mile marker 0 Springer to mile marker 20 Abbott.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway Motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed to 55 MPH and obey all posted traffic signs.
Post Date: 2021-04-19 08:12:03.0
Update Date: 2021-04-19 08:12:03.0
Expiration Date: unknown
Title: Roadwork, I 25 northbound from mile marker 319, (SANDS) to mile marker 330, (BERNAL).
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway Motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed to 55 MPH and obey all posted traffic signs.
Post Date: 2021-04-19 07:31:11.0
Update Date: 2021-04-19 07:31:11.0
Expiration Date: unknown
Title: Lane Closure, I 25 northbound and southbound from mile marker 290, (US 285) to mile marker 291, Eldorado.
Description: Lane Closure~~~One lane will be closed in each direction on I25 for bridge rehabilitation work beginning 11/16/2020 at 8:00 AM. Work is expected to be completed by 1/29/2021, weather permitting. Please obey all traffic control personnel and proceed with caution through the roadwork zone.
Post Date: 2020-11-16 07:25:22.0
Update Date: 2020-11-16 07:25:22.0
Expiration Date: unknown
Title: Alert, NM 502 from mile marker 2 to mile marker 1 Los Alamos.
Description: Alert~~~The following changes have been made to the traffic pattern in Los Alamos: *** East bound NM 502 traffic will be moved onto the east bound segment of NM 502 upon completion of the paving operations. *** West bound NM 502 traffic will remain in the current traffic lanes being used. *** Residents exiting and entering Arroyo Lane are advised to exercise caution crossing the east bound lane to access west bound NM 502. Please pay attention to traffic control signing in place. *** Expect delays and use caution while travelling through the area.
Post Date: 2020-11-16 07:08:09.0
Update Date: 2021-05-12 11:14:01.0
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 413, Springer to mile marker 414, (SPRINGER NORTH).
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-03-15 08:50:16.0
Update Date: 2021-03-15 08:50:16.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 415, 1 mile north of Springer to mile marker 421, 7 miles north of Springer.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-03-15 08:39:39.0
Update Date: 2021-03-15 08:41:07.0
Expiration Date: unknown
Title: Roadwork, I 10 at mile marker 132, 3 miles west of Las Cruces.
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) has completed construction on Crawford Boulevard over Interstate 10 exit, milepost 132, all lanes are now open on the bridge. Traffic on I-10 can expect various daytime lane closures on both eastbound and westbound lanes as needed for Bridge abutment painting. Contractor’s hours of operation will be from 7:00 am to 5:00 pm Monday to Friday.
Post Date: 2021-03-15 07:49:54.0
Update Date: 2021-05-06 08:31:01.0
Expiration Date: unknown
Title: Seasonal Closure, NM 72 eastbound and westbound from mile marker 0 to mile marker 36. Roadway closed.
Description: Seasonal Closure - Roads are snow packed and icy.~~~NM 72 Closed during the winter as it is impassable
Post Date: 2021-02-15 16:46:34.0
Update Date: 2021-02-15 16:46:34.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 149, Socorro to mile marker 151, 1 mile north of Socorro.
Description: Roadwork~~~Structures Inc., (Contractor) will be continuing with construction on the I-25 Business Loop in Socorro. The Socorro northbound off ramp exit 150 remains closed, the northbound on ramp is open and traffic is utilizing a detour style cross-over. Please follow construction detour signage. Lane closures can be expected on I-25 northbound and southbound throughout the week. Contractor’s hours of operation will be from 6:00 am to 6:00 pm Monday to Friday.
Post Date: 2020-07-13 08:20:22.0
Update Date: 2021-04-09 13:22:56.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44 to mile marker 45.
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2021-04-30 08:17:27.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 352 to mile marker 360.
Description: Roadwork~~~Mill and Inlay on Eastbound and Westbound Drive Lanes and Shoulders on US60/84 from MP 352.00 to MP 359.75. Traffic will be reduced to one lane with pilot car operations so expect delays. Speed limit will also be reduced to 45 MPH. Please follow all posted signage and be aware of personnel and equipment in the work zone. Weather permitting estimated completion date is the summer of 2021. Cutler Repaving: Superintendent Demarcus Jacobs (785)766-2408 NMDOT: Project Manager Thomas McAlister (575)840-8853
Post Date: 2021-04-12 11:35:17.0
Update Date: 2021-05-07 08:17:28.0
Expiration Date: unknown
Title: Roadwork, NM 371 northbound and southbound from mile marker 57 to mile marker 61.
Description: Roadwork~~~NM 371 will be reduced to one lane in both directions from mile marker 57.8-61 (Little Water) due to roadwork. A pilot vehicle will guide traffic through the work zone. Expect minor delays. All work will be performed Monday-Friday 7am-6pm. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-05-10 09:21:17.0
Update Date: 2021-05-10 09:21:17.0
Expiration Date: 2021-06-04 18:00:00.0
Title: Roadwork, US 64 eastbound from mile marker 418, 12 west of Clayton to mile marker 429, 1 west of Clayton. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway Motorists can anticipate various lane and shoulder restrictions. Minor delays are expected
Post Date: 2021-05-10 08:02:33.0
Update Date: 2021-05-10 08:02:33.0
Expiration Date: unknown
Title: Roadwork, NM 293 from mile marker 0 to mile marker 4.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be performing “Chip Sealing and Brooming” operations in Grant Co. Speed limits will be reduced, no center stripe with loose gravel on roadway. Traffic will encounter lane drops with pilot car and flagging operations.
Post Date: 2021-05-10 06:49:03.0
Update Date: 2021-05-10 06:49:03.0
Expiration Date: unknown
Title: Roadwork, NM 153 from mile marker 0 Gila to mile marker 3.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations in Grant Co. Speed limits will be reduced, no center stripe with loose gravel on roadway. "Fog Sealing" operations are scheduled to begin in the upcoming weeks. Traffic will encounter lane drops with pilot car and flagging operations.
Post Date: 2021-05-10 06:48:34.0
Update Date: 2021-05-14 09:46:37.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 458, 3 miles south of CO to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~I-25 northbound and southbound from mile marker 458, 3 miles south of CO to mile marker 460, (RATON PASS/PORT OF ENTRY). The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-07-06 15:04:02.0
Update Date: 2020-08-31 09:19:10.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~US 54 from mile marker 302 to mile marker 304. The New Mexico Department of Transportation - District Four will have road construction on U.S. 54 between mile posts 302 to 304 (Tucumcari Interchange) starting on April 6th. Please drive with caution, reduce speed and obey all posted traffic signs. The traveling public is advised to expect minor delays.
Post Date: 2020-04-06 08:59:14.0
Update Date: 2020-09-22 08:43:08.0
Expiration Date: unknown
Title: Roadwork, NM 176 from mile marker 10 to mile marker 26. Roadway closed.
Description: Roadwork~~~Road Construction is ongoing for Highway 176 between milepost 10 and milepost 26.3 for 16.3 miles. Expect delays. Construction will include roadway rehabilitation, widening of roadway and shoulders. There is a width restriction of 10 feet on this highway. There will be several detours throughout the construction zone where the speed limit will be 35 MPH. May encounter pilot car operations. Contact Information Supervisor Curtis Been- 575-538-1613. Project Manager Jason Stailey- 575-388-1546 extension 2735. Traffic Control Supervisor Harry Hatter- 970-529-3500. NMDOT: Acting Project Manager John Lara- 575-840-9625.
Post Date: 2020-10-05 10:31:06.0
Update Date: 2021-05-14 14:45:36.0
Expiration Date: unknown
Title: Lane Closure, NM 96 eastbound and westbound from mile marker 31 Arroyo del Agua to mile marker 32. Roadway closed.
Description: Lane Closure~~~One lane closed for bridge and road repairs. A pilot car is on hand to guide travelers through the construction zone. THERE IS A 12' WIDTH RESTRICTION IN PLACE UNTIL FURTHER NOTICE. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-10-05 07:54:09.0
Update Date: 2020-10-05 07:54:09.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 21, Shakespeare to mile marker 25, Lordsburg.
Description: Roadwork~~~AUI, Inc. (Contractor) has begun work on I-10 in Lordsburg from milepost 21 to 25. Detours are currently under construction in the median. Traffic can expect lane closures in the eastbound and westbound inside lanes during working hours. Hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday. Traffic control will remain in place 24/7.
Post Date: 2021-05-03 11:47:42.0
Update Date: 2021-05-10 06:45:22.0
Expiration Date: unknown
Title: Roadwork, US 550 from mile marker 63 to mile marker 64 Cuba.
Description: Roadwork~~~Bridge work on US 550, mile marker 63-64 (Cuba). US 550 will be reduced to one lane in each direction. Southbound traffic is diverted onto the northbound passing lane. There is an 11' width restriction in place. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-03-01 09:35:42.0
Update Date: 2021-04-14 11:31:32.0
Expiration Date: unknown
Title: Roadwork, US 491 from mile marker 61 to mile marker 68 Little Water.
Description: Roadwork~~~Roadwork on US 491, mile marker 61-68(Newcomb to Little Water). Traffic is reduced to one lane in both directions. Northbound traffic is diverted onto the southbound passing lane via median crossover detour. 11' width restriction in place. Speed reduced to 55mph through the work zone. Work hours are Monday-Friday from 7am to 5pm daily. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-03-01 09:31:17.0
Update Date: 2021-04-14 11:28:58.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 57, South Chaves to mile marker 60, 20 miles west of Grants.
Description: Roadwork~~~Roadwork on I-40, mile marker 57-60 (between Thoreau and Prewitt). I-40 is reduced to one lane in each direction. Eastbound traffic is diverted onto the westbound passing lane via median crossover detour. Speed reduced to 55mph through the work zone. 12' width restriction. Work hours are Monday-Friday from 7am to 5pm daily. PLEASE USE BOTH LANES AND TAKE TURNS MERGING AT CONSTRUCTION ZONE. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-03-01 09:26:20.0
Update Date: 2021-04-14 11:30:08.0
Expiration Date: unknown
Title: Roadwork, US 180 at mile marker 115.
Description: Roadwork~~~James Hamilton Construction Company (Contractor) has begun roadwork on US 180. Traffic can expect a lane closure on the eastbound and westbound lanes as well as shoulder work throughout the intersection on US 180 and 32nd Street. Contractor hours of operation will be Monday through Friday from 7:00 a.m. till 5:00 p.m. This project is estimated to be completed by summer 2021.
Post Date: 2021-01-29 13:28:37.0
Update Date: 2021-05-14 09:38:14.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Construction Closure, Construction Closure
Description: Construction Closure~~~I-40 EB & WB milepost 177 at Zuzax (Project A301345) I-40 and NM 333 at Sedillo Hill Road will have various lane and shoulder restrictions daily through July 1st.
Work is being performed for bridge construction. Motorists should anticipate delays.
Contractor: AUI Inc.
NMDOT P.M: Jeremy Maestas

Post Date: 2021-04-23 10:09:30.0
Update Date: 2021-05-14 13:48:11.0
Expiration Date: 2021-07-01 23:59:00.0
Title: Closure, Closure
Description: Closure~~~Zuni Pueblo is closed to all non-residents due to COVID-19 precautions and orders issued by Zuni Pueblo. Please use I-40 or US 180 as alternate routes. To avoid non-residential travel, traffic will be diverted onto NM 602, NM 53 or NM 36.
Post Date: 2020-04-10 10:15:40.0
Update Date: 2021-04-14 11:27:59.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 324 to mile marker 326 Logan.
Description: Roadwork~~~Bridge and Roadway Construction beginning November 8th 2019 continuing through December 31st 2020. All work will be performed 7am to 5pm. Reduce Speed through the work zone. Please drive with caution and obey all posted traffic signs. This event will be updated as conditions change. Follow all posted traffic signs.
Post Date: 2019-11-08 15:55:26.0
Update Date: 2020-08-31 09:19:56.0
Expiration Date: unknown
Title: Alert, US 380 at mile marker 66 Carrizozo.
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.~~~
Post Date: 2017-01-06 12:52:40.0
Update Date: 2021-05-13 10:28:30.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Mostly Cloudy and Breezy 68°F
29.84in
Barometer
27%
Humidity
North 24.2mph
Wind
Mostly Cloudy and Breezy

More Local Information

Bookmark and Share

Traffic Nearby

Go Ad Free - Become a Member

Sandia Park weather and traffic updates by locals

Write your own Sandia Park, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Sandia Park, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Sandia Park, NM report and/or forecast will be removed by a moderator.