Tesuque Traffic and Road Conditions

Tesuque Traffic Map

No Traffic Flow? Zoom in Closer
Get our app on Google Play

How to use the Tesuque Traffic Map

Traffic flow lines: Red/White dashed lines = Closed Road, Grey/White dashed lines = Road Work, Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

Traffic Incidents (beta): Each image represents traffic event or incident such as road construction, closure (red circle with a white dash) or accident.

Tesuque Traffic Alerts

Title: Construction Closure, I 40 eastbound and westbound at mile marker 183, 11 miles west of Moriarity.
Description: I-40 MP 180-185 (Phased) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: AUI Inc Project A302121 NMDOT: TBA
Post Date: 2024-07-31 11:41:57.0
Update Date: 2024-09-18 11:53:17.0
Expiration Date: 2024-12-31 23:59:00.0
Title: Alert, NM 159 from mile marker 4, 4 miles east of US 180 to mile marker 25, Willow Creek Campground.
Description: NM 159 from milepost 4 to milepost 25 (Willow Creek Campground). STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 46 feet in length are PROHIBITED on this section of NM 159. Trucks longer than 30 feet are highly encouraged to utilize a pilot vehicle. Consider using an alternate route - US 180 to NM 12 to NM 435 (NF-141). THIS IS A PERMANENT ALERT.~~~
Post Date: 2022-11-23 07:06:02.0
Update Date: 2024-09-17 10:47:41.0
Expiration Date: unknown
Title: Lane Closure, NM 220 from mile marker 0 to mile marker 2.
Description: Lane Closure~~~NMDOT crews will begin brooming operations on NM 220 from mm 0 to mm 2.5 (Airport Rd). Motorists should expect intermittent lane closures with pilot car operations and flaggers. Please use caution, reduce speed, and watch for all personnel and equipment in the area. NMDOT contact (575) 840-3035.
Post Date: 2024-09-18 08:33:51.0
Update Date: 2024-09-19 08:27:06.0
Expiration Date: unknown
Title: Lane Closure, I 25 northbound and southbound from mile marker 226, (I-40 WB Ramp / Big I) to mile marker 229, (JEFFERSON).
Description: Crews will close I-25 lanes overnight to accommodate construction starting in August 2024 through spring 2027. Lanes will be closed starting at 8 p.m. each night and will be reopened by 6 a.m. as needed for construction activities. Drivers should anticipate delays through the work zone. Visit the project website at i25improved.com for more info. Call the team at 505-785-7623 or email them at info@I25improved.com with any questions. Contractor: AUI Inc. Project Number: A301901 NMDOT: William Rose
Post Date: 2024-08-14 15:00:20.0
Update Date: 2024-09-05 10:35:15.0
Expiration Date: 2024-09-30 23:59:00.0
Title: Roadwork, US 60 from mile marker 344, 2 miles east of Taiban to mile marker 345, 1 mile west of Tolar. Roadway closed.
Description: Roadwork~~~Bridge deck replacement is taking place on US60/84 from MP 344.479 to MP 344.713. In the workzone the speed limit is reduced to 45MPH expect delays. There is a 10ft width restriction no wide loads or oversized loads aloud must seek alternate route. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. Work is expected to be completed in the Summer of 2024, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-12 06:53:39.0
Update Date: 2024-09-13 10:02:27.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 227, (Comanche) to mile marker 228, (MONTGOMERY).
Description: Roadwork~~~Roadwork, I-25 Improved, Comanche to Montgomery (MP 226-229) Drivers should anticipate lane reductions on I-25 and the local streets, and lane closures during off peak hours (outside of typical commute hours and weekends) In order to complete this large project on schedule, crews will be working day and night and up to seven days each week. I-25 travel lanes in the work zone will shift the median in August. Visit the project website at i25improved.com for more info. Call the team with questions at 505-785-7623 or email at info@I25improved.com Contractor: AUI Inc. Project Number: A301901 NMDOT: William Rose
Post Date: 2024-08-07 11:57:32.0
Update Date: 2024-08-07 12:04:16.0
Expiration Date: unknown
Title: Alert, Alert
Description: Alert~~~Low Clearance Structure, CMV's please use I-40 between exits 89 & 96. Height Restriction 13'6".
Post Date: 2024-06-05 10:26:04.0
Update Date: 2024-06-24 11:24:50.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 305, 21 miles north of Santa Fe to mile marker 309, 25 miles north of Santa Fe.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone.
Post Date: 2024-05-01 10:35:11.0
Update Date: 2024-08-30 07:16:49.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 149, Las Cruces to mile marker 150, Las Cruces.
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) is continuing a project to make roadway improvements to US 70 North Main Street between Spitz/N. Solano Drive and the intersection of N. Triviz Drive/Elks Drive. Traffic has been placed on the west side of US 70 and the eastbound lanes will be closed for construction. The speed limit is reduced to 35 miles per hour throughout the construction zone. For the safety of the traveling public, the Alameda Arroyo trail crossing remains CLOSED. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours are Monday-Friday 7 a.m.-5 p.m., although the contractor may work longer hours or on weekends if needed. Access will be maintained to all businesses and residences during construction. For more information or to sign up for construction updates, visit www.us70mainstreet.com.
Post Date: 2024-01-30 08:57:27.0
Update Date: 2024-09-13 14:48:31.0
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound at mile marker 44, Coolidge Interchange.
Description: Roadwork~~~Roadwork on I-40, mile marker 44 (Coolidge). Eastbound and Westbound passing lanes are closed. Speed reduced to 55 mph the construction zone. For more information contact El Terrero Construction at (505) 896-3864. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-04-30 13:48:15.0
Update Date: 2024-05-22 12:34:33.0
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 273, 13 miles west of Eagle Nest to mile marker 276, 10 miles west of Eagle Nest. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 10ft width and 55 length (bumper to bumper) restriction is in place for this phase of construction. Motorist can anticipate delays.
Post Date: 2024-06-25 11:01:43.0
Update Date: 2024-08-30 07:14:12.0
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 151, 19 miles south of Corona to mile marker 163, 7 miles south of Corona.
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2024-07-12 10:30:03.0
Expiration Date: unknown
Title: Closure, US 550 northbound at mile marker 48, 16 miles south of Cuba.
Description: Closure~~~Northbound US 550 is closed at mile marker 48 (South of Cuba) due to a crash. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-09-17 17:14:55.0
Update Date: 2024-09-17 17:14:55.0
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 7, 2 miles west of High Rolls to mile marker 8, 1 mile west of High Rolls.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) District Two in cooperation with Prestigious Paving, LLC (Contractor) will begin cleaning and painting of the U.S. 82 tunnel on Tuesday, September 17, 2024, as part of its yearly maintenance. The hours of operation are from 9 a.m. to 3 p.m., Tuesday through Friday. This is an estimated 4-day work project, weather permitting. Drivers can expect a single-lane closure with a pilot car operation throughout the duration of the project and working hours. Drivers are encouraged to plan accordingly and expect some delays.
Post Date: 2024-09-17 09:11:21.0
Update Date: 2024-09-19 08:26:59.0
Expiration Date: unknown
Title: Alert, I 40 from mile marker 40, Travel Center to mile marker 49, 23 miles east of Gallup.
Description: Alert~~~Watch for slow moving or stopped traffic on westbound I-40, mile marker 40-47 (from Continental Divide to West of Ciniza).No Detour Available. Expect Delays. Please drive with caution, reduce speed, and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-04-16 18:28:26.0
Update Date: 2024-05-01 15:04:45.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~There will be intermittent lane closures and traffic switches during this time as construction progresses. This project is scheduled for completion in the fall of 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2024-03-04 14:19:27.0
Expiration Date: unknown
Title: Alert, I 40 eastbound at mile marker 300, (NEWKIRK).
Description: Alert~~~Between the hours of 7 pm and 7 am, Monday thru Thursday, Interstate 40 will divert traffic through Exit 300 (Newkirk) for the placement of bridge girders on N.M. 129.
Post Date: 2024-08-13 13:53:00.0
Update Date: 2024-08-13 13:53:00.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 140, 7 miles south of Socorro to mile marker 150, (SOCORRO NORTH).
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) will be continuing the roadway rehabilitation project on Interstate 25 from milepost 140 (Socorro South) to milepost 150 (Socorro North). Milling and paving operations are now in place with multiple lanes closures in the work zone. Please use caution for large slow-moving equipment exiting and entering the roadway. The subcontractors are continuing with the replacement of guardrail throughout the project, overnight lane closures may remain in place as needed. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2024-06-11 16:55:55.0
Update Date: 2024-09-13 14:47:38.0
Expiration Date: unknown
Title: Alert, I 10 at mile marker 61, 20 miles west of Deming.
Description: The Gage Rest Area is closed until further notice.~~~
Post Date: 2024-01-09 12:15:48.0
Update Date: 2024-08-26 08:44:39.0
Expiration Date: unknown
Title: Roadwork, NM 112 from mile marker 31, El Vado to mile marker 45, at US 64.
Description: Roadwork~~~One lane will be closed in either direction from 7a.m. until 6p.m. each day while crews work on repairing and expanding the shoulders of the roadway. The roadway will be reopened at the end of each workday. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-04-09 12:54:25.0
Update Date: 2024-04-09 12:54:25.0
Expiration Date: unknown
Title: Roadwork, NM 434 from mile marker 21, 5 miles south of Black Lake to mile marker 24, 2 miles south of Black Lake.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions along with a reduced speed throughout the construction zone. A 10ft width and 55ft length restriction is in place for this project.
Post Date: 2024-05-07 07:42:17.0
Update Date: 2024-08-30 07:16:08.0
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. A 12 ft. width restriction is in place and speed has been reduced to 55 mph. Motorists can anticipate minor delays.
Post Date: 2024-05-07 07:37:27.0
Update Date: 2024-08-30 07:12:27.0
Expiration Date: unknown
Title: Alert, NM 42 from mile marker 0 , Corona to mile marker 35 , Willard.
Description: Alert~~~N.M. 42 will be closed intermittently to allow vehicles carrying wind turbine blades to safely access the roadway. Expect delays and use caution while travelling through the area.
Post Date: 2024-08-06 07:34:33.0
Update Date: 2024-08-06 07:34:33.0
Expiration Date: unknown
Title: Alert, US 82 at mile marker 16 Cloudcroft.
Description: Alert~~~US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles. STEEP GRADES, NUMEROUS TIGHT TURNS, AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route. US 62/180 or US 70. THIS IS A PERMANENT ALERT.
Post Date: 2023-12-05 13:16:41.0
Update Date: 2024-09-19 08:26:51.0
Expiration Date: unknown
Title: Roadwork, NM 1 northbound and southbound from mile marker 61, Socorro to mile marker 53, 1 mile north of San Antonio.
Description: Roadwork~~~BSNF Railroad will be making repairs to the railroad rails and ties at all roadway crossings working south from LaJoya to San Antonio. Starting daily at 6 a.m. various locations will be closed with a detour in place as crews work their way south. Roadway crossing locations will remain closed until repairs are complete. This project is expected to be completed by September 28, 2024. Closures are subject to weather conditions.
Post Date: 2024-09-03 14:43:59.0
Update Date: 2024-09-03 14:43:59.0
Expiration Date: 2024-09-28 17:00:00.0
Title: Roadwork, NM 408 northbound and southbound from mile marker 0 to mile marker 6 Chamizal.
Description: Roadwork~~~Starting Tuesday, September 3, 2024, BSNF Railroad will be making repairs to the railroad rails and ties at all roadway crossings working south from LaJoya to San Antonio. Starting daily at 6 a.m. various locations will be closed with a detour in place as crews work their way south. Roadway crossing locations will remain closed until repairs are complete. This project is expected to be completed by September 28, 2024. Closures are subject to weather conditions.
Post Date: 2024-09-03 14:40:17.0
Update Date: 2024-09-03 14:40:17.0
Expiration Date: 2024-09-28 17:00:00.0
Title: Roadwork, NM 442 from mile marker 0, La Cueva to mile marker 13, 1 mile north of Ojo Flez. Left lane and left shoulder closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Motorists can anticipate minor delays.
Post Date: 2024-07-02 07:35:10.0
Update Date: 2024-07-02 07:35:10.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 17, 1 mile north of Malaga. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Title: Construction Closure, NM 109 northbound and southbound at mile marker 5, 1 mile north of Jarales.
Description: NM 109 MP 5.7 (thru 11/30) The New Mexico Department of Transportation will have a continuous road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: NetoRey Terrazas
Post Date: 2024-03-28 10:58:59.0
Update Date: 2024-09-18 11:50:40.0
Expiration Date: 2024-11-30 23:59:00.0
Title: Construction Closure, NM 14 northbound and southbound and eastbound and westbound at mile marker 6, Sandia Crest Rd..
Description: NM 14, Crest Rd, Frost Rd MP 6 (Phased) There will be continuous lane and shoulder closures. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: Star Paving NMDOT: Jeremy Maestas
Post Date: 2024-03-28 10:48:46.0
Update Date: 2024-09-18 11:53:42.0
Expiration Date: 2024-12-31 23:59:00.0
Title: Closure, US 60 eastbound and westbound at mile marker 192, 5 miles west of Abo.
Description: Closure~~~U.S. 60 is closed in both directions due to a commercial vehicle crash. Emergency services are on the scene and working to clear the crash scene as soon as possible.
Post Date: 2024-09-19 01:13:00.0
Update Date: 2024-09-19 01:13:00.0
Expiration Date: unknown
Title: Roadwork, US 60 northbound and southbound from mile marker 186, 5 miles east of Cannon AFB to mile marker 188, 7 miles east of Cannon AFB.
Description: Roadwork~~~The NMDOT and FNF Construction will begin a bridge replacement project on U.S. 60 south of Mountainair on April 24, 2023. The project will be in Socorro County between mile post 186.92 and 187.73. Motorists traveling on this section of US 60 should expect delays and allow extra time to reach their destinations. They should also use extreme caution in the construction zone and obey any posted speed limits.
Post Date: 2024-07-18 12:53:53.0
Update Date: 2024-07-18 12:53:53.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2024-07-12 10:41:28.0
Expiration Date: unknown
Title: Alert, NM 104 from mile marker 70, 1 mile east of Mesa Rica to mile marker 90, 15 miles east of Conchas. Roadway closed.
Description: Alert~~~Bridge NO. 5995 at mile marker 71.5, Bridge No. 5254 at mile marker 81.8 and Bridge No. 5257 at mile marker 87.2 all have weight restrictions of 25 tons. Please seek alternate route.
Post Date: 2024-01-11 10:09:46.0
Update Date: 2024-08-30 07:16:57.0
Expiration Date: unknown
Title: Construction Closure, NM 500 eastbound and westbound at mile marker 2.
Description: NM 500 EB & WB MP 10-11 Diversion Channal to 2nd St (thru 1/31/25) There will be various shoulder and lane restrictions. Work is being performed for highway construction. Motorists should anticipate delays. Contractor: H.O Construction Project A300945 Bernalillo County
Post Date: 2024-05-09 18:01:05.0
Update Date: 2024-09-18 11:52:15.0
Expiration Date: 2025-01-31 23:59:00.0
Title: Roadwork, US 64 from mile marker 323, 13 miles west of Raton to mile marker 330, 16 miles west of Raton. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-08-08 08:52:25.0
Update Date: 2024-08-30 07:14:19.0
Expiration Date: unknown
Title: Roadwork, NM 113 from mile marker 0, at NM 9 to mile marker 10, 10 miles north of NM 9.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations on NM 113 in and around Animas and Hachita. Crews will begin Fog Sealing operations within the next month. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-06-06 07:54:15.0
Update Date: 2024-09-13 09:19:51.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 344, 8 miles east of Tucumacari to mile marker 350, 14 miles east of Tucumacari.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced and motorists can anticipate minor delays.
Post Date: 2024-06-06 07:27:00.0
Update Date: 2024-08-30 07:14:32.0
Expiration Date: unknown
Title: Alert, US 380 at mile marker 43, 13 miles east of Bingham.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 or 575-678-2222 for daily information on possible closure dates and times for firings. THIS IS A PERMANENT ALERT.
Post Date: 2021-07-01 08:53:50.0
Update Date: 2024-09-19 08:27:18.0
Expiration Date: unknown
Title: Closure, NM 475 from mile marker 9 to mile marker 15.
Description: Closure~~~The New Mexico Department of Transportation along with Cutler Repaving Inc. will begin Phase Two of a 7-mile pavement rehabilitation project that will include new pavement and striping on Monday, September 9, 2024, on N.M. 475 (Hyde Park Rd.). *** Phase Two will begin on Monday, September 9, 2024. Crews will be working six days a week, Monday through Saturday, from 8 a.m. until 7 p.m. In an effort to expedite the project, the contractor will be forced to close the road to all vehicular traffic, including bicycles, Monday through Saturday. The road will be reopened to all traffic on Sundays only. *** Work will take place from mile marker 9 to 16 and is expected to last approximately 30 working days, weather permitting. *** The contractor will be starting at mile marker 9 and working their way up to Santa Fe Ski at mile marker 16. As they complete each portion of the roadway it will be completely reopened to traffic. The exact timing of each section being reopened cannot be determined in advance, so please check back each week for updates.
Post Date: 2024-09-08 16:28:52.0
Update Date: 2024-09-08 16:28:52.0
Expiration Date: unknown
Title: Roadwork, NM 532 from mile marker 2 to mile marker 3.
Description: Roadwork~~~NMDOT crews will be conducting maintenance repairs on NM 532 from mm 2 to mm 3.3 (Ski Run Rd). Motorists should expect intermittent lane closures with flagging operations and traffic control Monday through Thursday. Motorists are advised to reduce speed, use caution for flash flooding, debris in the roadway, and narrow shoulders, and to watch for all personnel and equipment in the area.
Post Date: 2024-07-29 17:23:52.0
Update Date: 2024-09-18 08:31:47.0
Expiration Date: unknown
Title: Alert, US 70 at mile marker 184, 22 miles west of Holloman AFB.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: 2022-06-27 10:28:09.0
Update Date: 2024-09-19 08:26:45.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 39, 3 miles south of Ranchos de Taos to mile marker 42, Ranchos de Taos.
Description: Roadwork~~~The New Mexico Department of Transportation and Cutler Inc. will begin a 3-mile pavement rehabilitation project that will include new pavement and striping on Monday August 26, 2024, on N.M. 68. *** Work will take place from mile marker 39 to 41.8. *** Crews will be working four days a week, Monday through Thursday, from 7 a.m. until 7 p.m. One lane will be closed during working hours, there will be a 12-foot width restriction in place, and a pilot car will be on hand to guide motorists through the work zone. At the end of each workday, all traffic control devices will be removed, and the roadway reopened to motorists. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit.
Post Date: 2024-08-26 14:18:58.0
Update Date: 2024-08-27 11:17:18.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 397, 12 miles south of CO State Line to mile marker 408,1 mile south of Colorado State Line.
Description: Roadwork~~~The New Mexico Department of Transportation and Dustrol Inc. will begin a 12-mile pavement rehabilitation project that will include new pavement and striping on Monday August 26, 2024, on U.S. 285. *** Work will take place from mile marker 397 to 408.8 (Colorado State Line). *** Crews will be working six days a week, Monday through Saturday, from 7 a.m. until 7 p.m. One lane will be closed during working hours, there will be a 12-foot width restriction in place, and a pilot car will be on hand to guide motorists through the work zone. At the end of each workday, all traffic control devices will be removed, and the roadway reopened to motorists. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit.
Post Date: 2024-08-26 14:14:57.0
Update Date: 2024-08-26 14:20:20.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 387, 1 mile west of Clovis to mile marker 389, eastside of Clovis. Roadway closed.
Description: Roadwork~~~Road Reconstruction project on US60/84 from MP 387.800 to MP 389.120. Eastbound lanes of US 60 will be closed and reconstructed between the intersections of Main and Ash St. Prince Street will also be completely closed between the intersection of US 60 and E. McDonald. Traffic will be reduced to one lane in each direction on the existing Westbound Lanes. Traffic will follow posted detour signage and there is a 12ft width restriction, oversized or wide loads must use the designated truck bypass off of Hall St. Please follow all posted signage be aware of personnel and equipment in the workzone. Project expected completion date is Summer of 2025 depending on weather and delays. Contractor - AUI, Inc.- John Hale 505-974-1613 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-17 15:32:10.0
Update Date: 2024-09-13 10:02:53.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 75, Williamsburg (T OR C SOUTH).
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) will be continuing construction to replace the bridge at I-25 milepost 75, Broadway Street and NM 187 in Williamsburg. ALL traffic on northbound I-25 will be exited off at the I-25 off-ramp at Exit 75 so the bridge can be finalized with painting and finish electrical lighting on the bridge overhang. During this work northbound motorists on I-25 can access the on-ramp to re-enter I-25 or turn right or left on Broadway Blvd. This closure is expected to be in place until late October. Regular work hours are 7 a.m.-5 p.m. Monday-Friday. Motorists should expect delays and allow extra time to reach their destinations. Motorists should also use extra caution in the construction area. Access will be maintained to all businesses and residences.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2024-09-13 14:43:38.0
Expiration Date: unknown
Title: Roadwork, US 285 northbound and southbound from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Roadwork~~~Construction has begun on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. One lane will be closed for the duration of the project and there is a 24-hour flagging operation in place. Please obey all traffic control personnel and proceed with caution through the roadwork zone. **PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!**
Post Date: 2024-07-15 10:25:56.0
Update Date: 2024-07-15 10:25:56.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~ONGOING: Due to unforeseen issues at Martyr’s Lane, Phase 3 construction and the closure of Martyr’s Lane at Paseo del Pueblo have been extended through mid-August, 2024. The following traffic impact will remain in place: • Southbound motorists can use Camino de la Placita to Civic Plaza Drive, Bent Street, or North Plaza as a detour. ACCESS WILL BE MAINTAINED TO ALL BUSINESSES. Regular work hours are Monday-Friday, 7 a.m.-5:30 p.m., although the contractor may work longer hours or on weekends if needed. Crews will be working Monday, July 1-Wednesday, July 3. They will not be working Thursday, July 4 or Friday, July in observance of Independence Day. Barricades will remain in place for safety. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2024-08-08 14:28:04.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 162 Organ to mile marker 150, Las Cruces.
Description: Roadwork~~~Mesa Verde Enterprises, Inc. (Contractor) will be continuing the nighttime roadway rehabilitation project on US 70 from Del Rey Blvd. to Nasa Rd. just east of Las Cruces. Crews will be milling and paving from the town of Organ to Sonoma Ranch Exit, the driving lane and right shoulder will be closed. During the milling and paving operations, the on/off ramps will have intermitted closures. Working hours will be from 6 p.m. to 6 a.m., Sunday through Friday. Traffic control devices for lanes closures and off/on ramp closures will be in place for the safety of our crews and the traveling public during working hours.
Post Date: 2024-04-08 07:13:01.0
Update Date: 2024-08-30 13:02:10.0
Expiration Date: unknown
Title: Alert, US 64 from mile marker 6, 6 miles east of Arizona State Line to mile marker 9, 9 miles east of Arizona State Line.
Description: Alert~~~Beginning Monday March 11th, one lane will be closed from 6a.m. until 6p.m. each day, Monday through Friday. The remaining lane will have a width restrict in place of 9' during working hours. Work is expected to be completed by November 20th, 2024. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2024-03-04 14:17:10.0
Update Date: 2024-03-16 01:20:37.0
Expiration Date: unknown
Title: Alert, I 10 at mile marker 20, (LORDSBURG WEST).
Description: Alert~~~The Lordsburg welcome Center and Rest area will be closed until September 2024 for much needed upgrades to the main building, landscaping and restrooms.
Post Date: 2024-06-03 10:54:47.0
Update Date: 2024-08-26 08:44:45.0
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 0, Arizona State Line to mile marker 3 Beclabito.
Description: Roadwork~~~One lane road Use caution when driving through construction area watch for flagmen.
Post Date: 2024-07-01 08:22:39.0
Update Date: 2024-07-08 17:01:51.0
Expiration Date: unknown
Title: Construction Closure,
Description: NM 45, NM 314, NM 317 realignment MP 0 @ (thru 10/31 Phased) There will be continuous lane and shoulder restrictions. Work is being performed for highway reconstruction. Motorists should anticipate delays. Contractor: AUI Inc Project A301088 NMDOT: Tim Chavez
Post Date: 2024-08-30 09:29:37.0
Update Date: 2024-09-18 11:51:14.0
Expiration Date: 2024-12-31 23:59:00.0
Title: Roadwork, US 54 from mile marker 327 Logan to mile marker 333, 7 miles north of Logan.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Motorists can anticipate minor delays.
Post Date: 2024-08-30 07:09:06.0
Update Date: 2024-08-30 07:09:06.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 0, Arizona State Line to mile marker 15, (GARY).
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) has completed with the roadway rehabilitation project on Interstate 10 from milepost 0 (Arizona Stateline) to milepost 15 (Gary) in Hidalgo County. Subcontractors are currently placing roadway striping and raised pavement markers, lane closure may be in place for the safety of the traveling public and crew. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2024-03-29 14:18:05.0
Update Date: 2024-09-13 14:48:05.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Roadwork, I 10 at mile marker 164, Anthony.
Description: Roadwork~~~I-10 Widening West Sunday, September 15, through Thursday, September 19, 8 p.m. to 5 a.m. and Monday, September 16, through Saturday, September 21, 9 a.m. to 4 p.m. • I-10 East and West will be reduced to one lane between Vinton Road and Transmountain Road as needed. Crews will be working on retaining walls. Monday, September 16, through Saturday, September 21, 9 a.m. to 4 p.m. • Alternating lane closures on Redd Road between North Desert Boulevard and South Desert Boulevard. Crews will be conducting electrical work. Wednesday, September 18, 9 p.m. to 4 a.m. • I-10 East will be reduced to one lane between Vinton Road and Los Mochis Drive. Crews will be working on concrete paving TXDOT Roadway Closures can be found at www.drivetexas.com.
Post Date: 2024-04-26 15:48:41.0
Update Date: 2024-09-16 07:06:23.0
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound from mile marker 6, 6 miles north of I-40 to mile marker 7, 7 miles north of I-40.
Description: Roadwork~~~Roadwork on NM 566, mile marker 6-7 (north of Church Rock) due to a bridge replacement project. All traffic has been shifted onto the detour pavement. Speed reduced to 35mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-12-22 09:19:16.0
Update Date: 2023-12-22 09:19:16.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 139, San Antonio (US 380/SAN ANTONIO).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin working on the bridge on I-25 San Antonio (Walnut Creek milepost 139). This project consists of bridge rehabilitation, erosion control and drainage. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:32:05.0
Update Date: 2024-08-26 08:44:53.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 63, (NM 152/HILLSBORO).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will be continuing with work on the bridge at I-25 Caballo (Green Horn milepost 63) Starting Monday, September 16, 2024, the crew at milepost 63 will have daytime lane closures in place for median repairs. The passing left lane will be closed in both the northbound and southbound lanes during working hours. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-06-21 13:31:27.0
Update Date: 2024-09-13 14:47:07.0
Expiration Date: unknown
Title: Alert, NM 14 from mile marker 28, 1 mile south of Madrid to mile marker 29, Madrid.
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2024-02-10 19:05:15.0
Expiration Date: unknown
Title: Roadwork, NM 126 from mile marker 9, 9 miles east of Cuba to mile marker 10, 10 miles east of Cuba.
Description: Roadwork~~~Roadwork on NM 126, mile marker 9-10 (east of Cuba) due to a bridge replacement project. Traffic is down to one lane controlled by traffic signals throughout the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-06-14 09:39:31.0
Update Date: 2024-06-14 09:41:02.0
Expiration Date: unknown
Title: Roadwork, NM 146 northbound and southbound from mile marker 0, Hachita to mile marker 19, at I-10.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will begin “Chip Sealing and Brooming” operations on NM 146. Speed limits will be reduced, no center stripe with loose gravel on roadway. Please expect delays and a pilot car operation.
Post Date: 2024-09-13 09:21:12.0
Update Date: 2024-09-13 09:21:12.0
Expiration Date: unknown
Title: Construction Closure, NM 313 northbound and southbound at mile marker 10 Chical.
Description: NM 313 MP 8-17 (thru 9/20) There will be lane and shoulder restrictions vehicles will be controlled by flagging. Work is being performed for highway maintenance. Motorists should anticipate delays. Contractor: Brazer Asphalt NMDOT: Barry Lytle--
Post Date: 2024-09-13 06:50:32.0
Update Date: 2024-09-18 11:56:15.0
Expiration Date: 2024-09-20 15:00:00.0
Title: Construction Closure, NM 16 eastbound and westbound at mile marker 5, 3 miles north of I-25.
Description: NM 16 MP 0-10 (thru 9/26) There will be lane and shoulder restrictions vehicles will be controlled by flagging. Work is being performed for highway maintenance. Motorists should anticipate delays. Contractor: Dustrol Inc NMDOT: Barry Lytle--
Post Date: 2024-09-13 06:48:58.0
Update Date: 2024-09-18 11:56:32.0
Expiration Date: 2024-09-26 15:00:00.0
Title: Construction Closure, NM 556 eastbound and westbound at mile marker 2, at I-25.
Description: I/25-NM 556 Tramway Blvd MP 3-9 (thru 11/10) There will be lane and shoulder restrictions . Work is being performed for highway maintenance. Motorists should anticipate delays. Contractor: Albuquerque Asphalt NMDOT: Barry Lytle--
Post Date: 2024-09-13 06:47:33.0
Update Date: 2024-09-18 11:55:49.0
Expiration Date: 2024-11-10 23:59:00.0
Title: Roadwork, NM 566 northbound and southbound at mile marker 0, Church Rock (I-40).
Description: Roadwork~~~Bridge Replacement work on NM 566, mile marker 0 - 0.866 (Church Rock). All traffic has been shifted to the detour pavement. Watch for equipment. This event will be updated as conditions change.
Post Date: 2023-10-13 15:46:41.0
Update Date: 2023-10-13 15:46:41.0
Expiration Date: unknown
Title: Roadwork, NM 81 from mile marker 0, Antelope Wells to mile marker 45, Hachita.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations on NM 81 in and around Animas and Hachita. Crews will begin Fog Sealing operations within the next month. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-07-12 14:09:53.0
Update Date: 2024-09-13 09:19:18.0
Expiration Date: unknown
Title: Alert, NM 475 from mile marker 1 to mile marker 5.
Description: Alert~~~Beginning Monday, September 11, 2023, PNM will begin a project to upgrade the electrical service to residents on N.M. 475. One lane will be closed in various spots between mile marker 2.5 to 4.5 until the project is completed. *** For more information, please contact the PNM Electric Hotline @ 1-833-910-3670 ***
Post Date: 2023-09-08 12:37:39.0
Update Date: 2024-03-08 08:32:34.0
Expiration Date: unknown
Title: Roadwork, NM 41 from mile marker 28 to mile marker 38, 1 mile south of Stanley.
Description: Roadwork~~~The New Mexico Department of Transportation along with Brasier Asphalt Inc. will begin a 10-mile pavement rehabilitation project that will include new pavement and striping on Wednesday, September 4, 2024, on N.M. 41 between Moriarty and Stanley. Work will take place from mile marker 28 to 38 and is expected to last 15 working days. Crews will be working six days a week, Monday through Saturday, from 7 a.m. until 7 p.m. One lane will be closed during working hours, there will be a 12-foot width restriction in place, the speed limit will be reduced to 35 miles per hour through the work zone and a pilot car will be in place to guide motorists through the construction zone. At the end of each workday, all traffic control devices will be removed, and the roadway reopened to motorists.
Post Date: 2024-09-06 19:57:34.0
Update Date: 2024-09-06 19:57:34.0
Expiration Date: unknown
Title: Alert, US 380 at mile marker 66, Carrizozo.
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.~~~
Post Date: 2017-01-06 12:52:40.0
Update Date: 2024-09-19 08:27:11.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 384, 2 miles east of Cannon AFB to mile marker 385, 3 miles east of Cannon AFB. Roadway closed.
Description: Roadwork~~~Intersection Improvements at Intersection of US 60/84 & HWY 467 MP 384.312 to MP 384.596. US60/84 Eastbound Lanes are closed with traffic reduced to one lane in each direction using Westbound Lanes expect delays. NM467 will be closed to thru traffic from Brady to US 60/84 please follow posted detour routes and signage in the work zone. There is 11ft width restriction wide and oversized loads please seek alternate route. Work is expected to be completed summer of 2024 depending on weather and delays. Contractor – K Barnett & Sons Project Manager – Hunter McLemore (214)693-3588 K Barnett & Sons TCS – Hector Guerrero (575)309-5299 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2024-04-05 15:23:47.0
Update Date: 2024-09-13 10:02:38.0
Expiration Date: unknown
Title: Roadwork, US 82 from mile marker 171 Lovington to mile marker 172, Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US82 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. The intersection of NM 83/82 has been reopened for east, west, and southbound traffic. Northbound traffic is closed from the intersection to Central. Use posted detour signs to navigate through construction. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 499 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on US 82 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drive pads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2101381R2 project: Contractor: Constructors, Inc., Project Manager- Darin Coslin (575) 626-1140, Superintendent- Hector Sicre (915)316-7732. Traffic Control Supervisor- Javier Cannon (915) 888-7144, Project Safety Office- Tami Mandel (505) 697-1787- Project EEO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2024-06-26 13:01:26.0
Expiration Date: unknown
Title: Roadwork, NM 9 from mile marker 8, 5 miles west of Animas to mile marker 44, Hachita.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) has completed “Chip Sealing and Brooming” operations on NM 9 in and around Animas and Hachita. Crews will begin Fog Sealing operations within the next month. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2024-05-03 15:02:44.0
Update Date: 2024-09-13 09:18:43.0
Expiration Date: unknown
Title: Alert, NM 152 from mile marker 15, San Lorenzo to mile marker 49, 1 mile east of Hillsboro.
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2023-03-03 14:03:42.0
Update Date: 2024-09-17 10:47:54.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 17, 1 mile north of Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2024-07-12 10:37:42.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 35, (RINCON).
Description: Roadwork~~~Kimo Constructors, Inc. (Contractor) will begin work on erosion control along I-25 between Rincon and Hatch. The contractor will be working on the southbound off ramp and Rincon (exit 35) and near milepost 43, I-25 may be reduced to a single lane depending on the work location, drivers should be vigilant for construction signing. The contractor’s hours of operation are 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-02-02 15:08:46.0
Update Date: 2024-06-06 07:19:16.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Fair 73°F
30.06in
Barometer
44%
Humidity
Southeast 18.4mph
Wind
Fair

More Local Information

Bookmark and Share

Traffic Nearby

Tesuque weather and traffic updates by locals

Write your own Tesuque, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Tesuque, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Tesuque, NM report and/or forecast will be removed by a moderator.