Yatahey Traffic and Road Conditions
×
Warning! Do not attempt to use any of these features while driving a vehicle.
Yatahey Traffic Map
No Traffic Flow? Zoom in Closer
How to use the Yatahey Traffic Map
Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic or no traffic*. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.
* In known extreme weather events or accidents, the map provider may still show green lines, even if lanes or the entire road is closed.
Traffic Alert

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Tips
- Click or touch the map to move in different directions.
- If you do not see any markers on the map, try zooming in one or two levels using "+" on the top left side. However, they are not always available.
- Click an incident icon on the map to get more information.
FAQs
Q) How often is the map updated?
A) The traffic flow is updated at loadtime and upon movement outside the initial map view, or upon refresh of the page. Any incident markers are checked for updates approximately every 5-10 minutes, but you need to reload the page to load any new updates; the data provided may still be the same status/view as before. Information shown is as only reliable as how it is reported to us.
Q) The roads are backed up or closed, but the map does not show the reason why, what's the deal?A) Municipal traffic monitors or GPS trackers may not be available, could be offline, or reports and alerts are not syndicated to media outside of the area to use on the map. This is especially true for rural areas. You are encouraged to leave a road conditions report to help others.
Q) I see traffic alerts in the box below for the state, but they aren't related to the area I'm in? A) We attempt to display alerts as specific to the area as possible, however in some cases the data we receive will only allow us to provide it by county or even statewide.
Q) Are you an official source of traffic information? A) We are not an official source of traffic or real-time data. We have contracts and licenses to display certain up-to-date information that comes direct from some DOTs in various states, and the traffic flow on the maps is provided by Google or MapQuest. However, the data shown here should only be used for light informational and reference purposes and not to make critical decisions. Your safest option on the web is to use your state-run traffic website, or to call the DOT traffic line for your state, local authorities, or the state's 511 number if available.
Yatahey Traffic Alerts
Title: Construction Closure, I 25 northbound and southbound at mile marker 203, Meadow Lake (NM 6/LOS LUNAS).
Description: I-25 NB/SB milepost 203-207 (Thru 9/30) The New Mexico Department of Transportation will be having various lane, ramp, and shoulder restrictions. Detours will be established. Work being performed for interstate maintenance. Motorists should anticipate delays. Contractor: AAI NMDOT: Barry Lytle
Post Date: 2023-08-30 15:55:25.0
Update Date: 2023-09-21 08:28:06.0
Expiration Date: 2023-09-30 23:59:00.0
Description: I-25 NB/SB milepost 203-207 (Thru 9/30) The New Mexico Department of Transportation will be having various lane, ramp, and shoulder restrictions. Detours will be established. Work being performed for interstate maintenance. Motorists should anticipate delays. Contractor: AAI NMDOT: Barry Lytle
Post Date: 2023-08-30 15:55:25.0
Update Date: 2023-09-21 08:28:06.0
Expiration Date: 2023-09-30 23:59:00.0
Title: Crash, I 40 eastbound at mile marker 122, 27 miles west of Albuquerque.
Description: Crash~~~Eastbound right lane closed on I-40, mile marker 122 (West of Albuquerque) due to multiple crashes. Watch for emergency response personnel and vehicles. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-09-27 08:38:44.0
Update Date: 2023-09-27 08:38:44.0
Expiration Date: unknown
Description: Crash~~~Eastbound right lane closed on I-40, mile marker 122 (West of Albuquerque) due to multiple crashes. Watch for emergency response personnel and vehicles. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-09-27 08:38:44.0
Update Date: 2023-09-27 08:38:44.0
Expiration Date: unknown
Title: Lane Closure, US 64 from mile marker 26, 3 miles east of Shiprock to mile marker 28, 5 miles east of Shiprock.
Description: Lane Closure~~~One lane will be closed in each direction for the construction of turning lanes and lighting at the entrance to Flowing Water Casino. Work is expected to be completed by the end of November 2023. *** There is an 11-foot width restriction in place in both directions for the duration of this project. ***
Post Date: 2023-09-20 14:16:05.0
Update Date: 2023-09-20 14:17:09.0
Expiration Date: 2023-11-30 17:00:00.0
Description: Lane Closure~~~One lane will be closed in each direction for the construction of turning lanes and lighting at the entrance to Flowing Water Casino. Work is expected to be completed by the end of November 2023. *** There is an 11-foot width restriction in place in both directions for the duration of this project. ***
Post Date: 2023-09-20 14:16:05.0
Update Date: 2023-09-20 14:17:09.0
Expiration Date: 2023-11-30 17:00:00.0
Title: Roadwork, NM 104 from mile marker 0, Las Vegas to mile marker 5, 5 miles east of Las Vegas.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2023-09-20 08:01:57.0
Update Date: 2023-09-20 08:01:57.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2023-09-20 08:01:57.0
Update Date: 2023-09-20 08:01:57.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~I-25 northbound and southbound from mile marker 454 to mile marker 460, (RATON PASS/PORT OF ENTRY). The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-06-16 13:27:31.0
Update Date: 2023-06-07 07:30:01.0
Expiration Date: unknown
Description: Roadwork~~~I-25 northbound and southbound from mile marker 454 to mile marker 460, (RATON PASS/PORT OF ENTRY). The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-06-16 13:27:31.0
Update Date: 2023-06-07 07:30:01.0
Expiration Date: unknown
Title: Roadwork, US 54 at mile marker 304 Montoya / Tucumcari.
Description: Roadwork~~~US 54 from mile marker 303 to mile marker 305. The New Mexico Department of Transportation District Four will have road construction on U.S. 54 between mile posts 303 to 305. Please drive with caution, reduce speed and obey all posted traffic signs. The traveling public is advised to expect minor delays. (ET Construction)
Post Date: 2021-06-16 13:21:24.0
Update Date: 2023-06-07 07:30:30.0
Expiration Date: unknown
Description: Roadwork~~~US 54 from mile marker 303 to mile marker 305. The New Mexico Department of Transportation District Four will have road construction on U.S. 54 between mile posts 303 to 305. Please drive with caution, reduce speed and obey all posted traffic signs. The traveling public is advised to expect minor delays. (ET Construction)
Post Date: 2021-06-16 13:21:24.0
Update Date: 2023-06-07 07:30:30.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 344, 2 miles east of Taiban to mile marker 345, 1 mile west of Tolar. Roadway closed.
Description: Roadwork~~~Bridge deck replacement is taking place on US60/84 from MP 344.479 to MP 344.713. In the workzone the speed limit is reduced to 45MPH expect delays. There is a 12ft width restriction wide loads must seek alternate route. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. Work is expected to be completed in the Spring of 2024, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-12 06:53:39.0
Update Date: 2023-09-22 14:51:32.0
Expiration Date: unknown
Description: Roadwork~~~Bridge deck replacement is taking place on US60/84 from MP 344.479 to MP 344.713. In the workzone the speed limit is reduced to 45MPH expect delays. There is a 12ft width restriction wide loads must seek alternate route. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. Work is expected to be completed in the Spring of 2024, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-12 06:53:39.0
Update Date: 2023-09-22 14:51:32.0
Expiration Date: unknown
Title: Alert, NM 547 at mile marker 1.
Description: Alert~~~NM 547, mile marker 1 (between First Street and Roosevelt Avenue) will have an 8ft. width restriction in place until mid-November due to roadwork. NO VEHICLES WIDER THAN 8 FEET WILL BE PERMITTED. Use Sakalares Blvd as an alternate route for vehicles exceeding width restriction. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-04-12 10:58:35.0
Update Date: 2023-07-18 07:45:34.0
Expiration Date: 2023-12-01 12:54:00.0
Description: Alert~~~NM 547, mile marker 1 (between First Street and Roosevelt Avenue) will have an 8ft. width restriction in place until mid-November due to roadwork. NO VEHICLES WIDER THAN 8 FEET WILL BE PERMITTED. Use Sakalares Blvd as an alternate route for vehicles exceeding width restriction. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-04-12 10:58:35.0
Update Date: 2023-07-18 07:45:34.0
Expiration Date: 2023-12-01 12:54:00.0
Title: Roadwork, NM 209 from mile marker 8 to mile marker 9.
Description: Roadwork~~~Bridge repairs and replacement on NM 209 from mm 8.97 to mm 9.175 (Ned Houk Park area). Motorists should expect intermittent lane closures in both and north and southbound lanes throughout the duration of the project and an automated stop light running 24/7. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. There is a 11ft width restriction for this project. Work is expected to be complete September 2023, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-01-04 15:45:09.0
Update Date: 2023-09-22 14:51:55.0
Expiration Date: unknown
Description: Roadwork~~~Bridge repairs and replacement on NM 209 from mm 8.97 to mm 9.175 (Ned Houk Park area). Motorists should expect intermittent lane closures in both and north and southbound lanes throughout the duration of the project and an automated stop light running 24/7. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. There is a 11ft width restriction for this project. Work is expected to be complete September 2023, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-01-04 15:45:09.0
Update Date: 2023-09-22 14:51:55.0
Expiration Date: unknown
Title: Roadwork, US 56 from mile marker 60, 22 miles west of Clayton to mile marker 80, 2 miles west of Clayton.
Description: Roadwork~~~The New Mexico Department of Transportation will have maintenance personnel and equipment on the roadway, road maintenance will be performed until 5:30 PM.
Post Date: 2023-08-29 11:36:55.0
Update Date: 2023-08-29 11:36:55.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have maintenance personnel and equipment on the roadway, road maintenance will be performed until 5:30 PM.
Post Date: 2023-08-29 11:36:55.0
Update Date: 2023-08-29 11:36:55.0
Expiration Date: unknown
Title: Lane Closure, NM 247 from mile marker 36 to mile marker 43.
Description: Lane Closure~~~NMDOT crews will begin fog sealing operations on NM 247 from mm 36 to mm 43.4 (east of Corona). Motorists should expect intermittent lane closures with pilot car operations and traffic control. Please use caution, reduce speed and watch for all personnel and equipment in the area. NMDOT contacts are Richard Marquez (575) 840-9796 and Robert Canelo (575) 626-2095.
Post Date: Tue Sep 26 09:23:01 MDT 2023
Update Date: 2023-09-27 09:54:53.0
Expiration Date: unknown
Description: Lane Closure~~~NMDOT crews will begin fog sealing operations on NM 247 from mm 36 to mm 43.4 (east of Corona). Motorists should expect intermittent lane closures with pilot car operations and traffic control. Please use caution, reduce speed and watch for all personnel and equipment in the area. NMDOT contacts are Richard Marquez (575) 840-9796 and Robert Canelo (575) 626-2095.
Post Date: Tue Sep 26 09:23:01 MDT 2023
Update Date: 2023-09-27 09:54:53.0
Expiration Date: unknown
Title: Roadwork, NM 53 from mile marker 15, Black Rock to mile marker 19, 4 miles east of Black Rock.
Description: Roadwork~~~NM 53 is reduced to one lane in both directions from mile marker 15-19 (Black Rock, east of Zuni) due to road construction work. Temporary street signals will guide traffic through the work zone. PLEASE WAIT FOR TRAFFIC SIGNALS TO AVOID ONCOMING TRAFFIC. Traffic control will remain in place 24/7. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2022-05-24 11:10:49.0
Update Date: 2023-09-19 10:29:12.0
Expiration Date: unknown
Description: Roadwork~~~NM 53 is reduced to one lane in both directions from mile marker 15-19 (Black Rock, east of Zuni) due to road construction work. Temporary street signals will guide traffic through the work zone. PLEASE WAIT FOR TRAFFIC SIGNALS TO AVOID ONCOMING TRAFFIC. Traffic control will remain in place 24/7. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2022-05-24 11:10:49.0
Update Date: 2023-09-19 10:29:12.0
Expiration Date: unknown
Title: Roadwork, NM 39 from mile marker 19, 5 miles south of Gallegos to mile marker 30, 6 miles north of Gallegos.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2022-08-23 07:32:51.0
Update Date: 2023-06-07 07:30:35.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2022-08-23 07:32:51.0
Update Date: 2023-06-07 07:30:35.0
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Lane Closure, I 40 westbound from mile marker 80, Milan to mile marker 79, Milan Interchange.
Description: Lane Closure~~~Westbound I-40 is reduced to one lane from mile marker 80-79 (Milan). WESTBOUND EXIT 79 IS CLOSED. PLEASE USE EXIT 81 AS AN ALTERNATE ROUTE. This event will be updated as conditions change.
Post Date: 2023-09-19 10:38:03.0
Update Date: 2023-09-19 10:38:03.0
Expiration Date: unknown
Description: Lane Closure~~~Westbound I-40 is reduced to one lane from mile marker 80-79 (Milan). WESTBOUND EXIT 79 IS CLOSED. PLEASE USE EXIT 81 AS AN ALTERNATE ROUTE. This event will be updated as conditions change.
Post Date: 2023-09-19 10:38:03.0
Update Date: 2023-09-19 10:38:03.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 151, 19 miles south of Corona to mile marker 163, 7 miles south of Corona.
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2023-08-01 12:29:28.0
Expiration Date: unknown
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2023-08-01 12:29:28.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~One lane will be closed for roadwork in each direction from 7:00 AM to 7:00 PM, Monday through Friday, during daylight hours. This project is scheduled for completion in the summer of 2023. There will be lane closures and traffic switches during this time as construction progresses. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2022-11-08 07:57:45.0
Expiration Date: unknown
Description: Roadwork~~~One lane will be closed for roadwork in each direction from 7:00 AM to 7:00 PM, Monday through Friday, during daylight hours. This project is scheduled for completion in the summer of 2023. There will be lane closures and traffic switches during this time as construction progresses. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2022-11-08 07:57:45.0
Expiration Date: unknown
Title: Lane Closure, I 25 from mile marker 437, 13 miles south of Raton to mile marker 439, 11 miles south of Raton. Right lane and right shoulder closed.
Description: Lane Closure~~~The New Mexico Department of Transportation will have maintenance personnel and equipment on the roadway, road maintenance will be performed until 5:30 PM.
Post Date: 2023-09-12 09:32:30.0
Update Date: 2023-09-12 09:33:19.0
Expiration Date: 2099-12-31 17:30:00.0
Description: Lane Closure~~~The New Mexico Department of Transportation will have maintenance personnel and equipment on the roadway, road maintenance will be performed until 5:30 PM.
Post Date: 2023-09-12 09:32:30.0
Update Date: 2023-09-12 09:33:19.0
Expiration Date: 2099-12-31 17:30:00.0
Title: Construction Closure, Construction Closure
Description: Construction Closure~~~The New Mexico Department of Transportation and contractor will be continuing with repairs to the I-10 to I-25 ramp in Las Cruces. Beginning Monday, Sept. 11, 2023, Hasse Contracting Company, Inc. (Contractor) will be making the needed concrete repairs to the bridge deck, barrier walls and support piers. This work is estimated at $1.3 million and is expected to take approximately three months to complete. Lane closures will be required on I-10 eastbound lanes for the safety of the traveling public and our construction crews.
Post Date: 2023-07-11 23:41:50.0
Update Date: 2023-09-14 13:44:51.0
Expiration Date: unknown
Description: Construction Closure~~~The New Mexico Department of Transportation and contractor will be continuing with repairs to the I-10 to I-25 ramp in Las Cruces. Beginning Monday, Sept. 11, 2023, Hasse Contracting Company, Inc. (Contractor) will be making the needed concrete repairs to the bridge deck, barrier walls and support piers. This work is estimated at $1.3 million and is expected to take approximately three months to complete. Lane closures will be required on I-10 eastbound lanes for the safety of the traveling public and our construction crews.
Post Date: 2023-07-11 23:41:50.0
Update Date: 2023-09-14 13:44:51.0
Expiration Date: unknown
Title: Roadwork, NM 442 from mile marker 13, 1 mile north of Ojo Flez to mile marker 21, Ocate.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 25 mph and motorists can anticipate minor delays.
Post Date: 2023-08-08 08:07:14.0
Update Date: 2023-08-08 08:07:14.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 25 mph and motorists can anticipate minor delays.
Post Date: 2023-08-08 08:07:14.0
Update Date: 2023-08-08 08:07:14.0
Expiration Date: unknown
Title: Roadwork, NM 120 from mile marker 12, 5 miles west of Ocate to mile marker 18, 1 mile east of Ocate.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 25 mph and motorists can anticipate minor delays.
Post Date: 2023-08-08 08:06:17.0
Update Date: 2023-08-08 08:06:17.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 25 mph and motorists can anticipate minor delays.
Post Date: 2023-08-08 08:06:17.0
Update Date: 2023-08-08 08:06:17.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 17, 1 mile north of Malaga. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Title: Closure, Closure
Description: Closure~~~The intersection of N.M. 76 and N.M. 68 will be closed until late September while the intersection is rebuilt and repaved as well as paving 1.6 miles of the southbound lanes of NM 68. Speed limits are reduced to 30 miles per hour in the construction zone. Motorists should use extra caution and expect delays.
Post Date: 2023-07-27 12:05:29.0
Update Date: 2023-07-27 12:05:29.0
Expiration Date: unknown
Description: Closure~~~The intersection of N.M. 76 and N.M. 68 will be closed until late September while the intersection is rebuilt and repaved as well as paving 1.6 miles of the southbound lanes of NM 68. Speed limits are reduced to 30 miles per hour in the construction zone. Motorists should use extra caution and expect delays.
Post Date: 2023-07-27 12:05:29.0
Update Date: 2023-07-27 12:05:29.0
Expiration Date: unknown
Title: Construction Closure, NM 109 northbound and southbound at mile marker 5, 1 mile north of Jarales.
Description: NM 109 milepost 5.3-6.1 (Thru 3/20/2024) The New Mexico Department of Transportation will have a continues road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: Nieto Terrazas
Post Date: 2023-07-27 12:01:32.0
Update Date: 2023-09-21 08:31:55.0
Expiration Date: 2024-03-20 23:59:00.0
Description: NM 109 milepost 5.3-6.1 (Thru 3/20/2024) The New Mexico Department of Transportation will have a continues road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: Nieto Terrazas
Post Date: 2023-07-27 12:01:32.0
Update Date: 2023-09-21 08:31:55.0
Expiration Date: 2024-03-20 23:59:00.0
Title: Lane Closure, US 550 northbound and southbound from mile marker 160, Aztec to mile marker 165, 1 mile south of Inca.
Description: Lane Closure~~~The New Mexico Department of Transportation (NMDOT) and Fisher Sand & Gravel Inc. will begin a roadway improvement project on U.S. 550 between mile markers 161 and 165 in Aztec N.M. This project will consist of full-depth reclamation, removal of existing asphalt, placement of new asphalt pavement, safety enhancements, traffic control, signing and striping. Starting May 1, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. There will be an 11-foot width restriction in place as well. The contractor will be working Monday through Friday from 7:00 a.m. to 7:00 p.m. Motorists can expect delays during this time. Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. Updates on this project will be posted on the New Mexico Department of Transportation’s road advisory website, http://nmroads.com/.
Post Date: 2023-04-27 12:42:19.0
Update Date: 2023-04-27 12:42:19.0
Expiration Date: unknown
Description: Lane Closure~~~The New Mexico Department of Transportation (NMDOT) and Fisher Sand & Gravel Inc. will begin a roadway improvement project on U.S. 550 between mile markers 161 and 165 in Aztec N.M. This project will consist of full-depth reclamation, removal of existing asphalt, placement of new asphalt pavement, safety enhancements, traffic control, signing and striping. Starting May 1, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. There will be an 11-foot width restriction in place as well. The contractor will be working Monday through Friday from 7:00 a.m. to 7:00 p.m. Motorists can expect delays during this time. Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. Updates on this project will be posted on the New Mexico Department of Transportation’s road advisory website, http://nmroads.com/.
Post Date: 2023-04-27 12:42:19.0
Update Date: 2023-04-27 12:42:19.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 381, westside of Cannon AFB to mile marker 382 Cannon AFB.
Description: Roadwork~~~Bridge repairs and replacement is ongoing on FR6001 from MP 0.240 to MP 0.199 (Cannon Air Force Base) The bridge will be closed from 11pm to 4:00 am starting July 24th, 2023 for jacking and shoring of the bridge. As a result Cannon Main entrance will be closed but the eastbound down ramp will be accessible for those leaving the Cannon. Drivers must seek alternated base entrance. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. There is a 11ft width restriction for this project. Work is expected to be complete September 2023, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-02-23 11:01:50.0
Update Date: 2023-09-22 14:51:42.0
Expiration Date: unknown
Description: Roadwork~~~Bridge repairs and replacement is ongoing on FR6001 from MP 0.240 to MP 0.199 (Cannon Air Force Base) The bridge will be closed from 11pm to 4:00 am starting July 24th, 2023 for jacking and shoring of the bridge. As a result Cannon Main entrance will be closed but the eastbound down ramp will be accessible for those leaving the Cannon. Drivers must seek alternated base entrance. Drivers please be aware of equipment and personnel in the work zone and follow all posted signage. There is a 11ft width restriction for this project. Work is expected to be complete September 2023, weather permitting. Contractor - Hasse Contracting Company, Inc.- Leonel Ramirez 505-463-7893; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-02-23 11:01:50.0
Update Date: 2023-09-22 14:51:42.0
Expiration Date: unknown
Title: Construction Closure, NM 448 northbound and southbound at mile marker 3.
Description: NM 45 NB/SB milepost 18-20 (Thru 10/28) There will be left lane and median restrictions. Work is being performed for City of Albuquerque landscape beautification. Motorists should anticipate delays. Contractor: City of Albuquerque-Phase IV
Post Date: 2023-09-21 08:59:33.0
Update Date: 2023-09-21 08:59:33.0
Expiration Date: 2023-10-28 23:59:00.0
Description: NM 45 NB/SB milepost 18-20 (Thru 10/28) There will be left lane and median restrictions. Work is being performed for City of Albuquerque landscape beautification. Motorists should anticipate delays. Contractor: City of Albuquerque-Phase IV
Post Date: 2023-09-21 08:59:33.0
Update Date: 2023-09-21 08:59:33.0
Expiration Date: 2023-10-28 23:59:00.0
Title: Construction Closure, NM 528 at mile marker 5.
Description: NM 45 NB/SB (Elison to Westside) milepost 22 (9/25 thru 12/15) There will be left lane and median restrictions. Work is being performed for City of Albuquerque landscape beautification. Motorists should anticipate delays. Contractor: Lee Landscape
Post Date: 2023-09-21 08:56:03.0
Update Date: 2023-09-21 08:56:03.0
Expiration Date: 2023-12-15 23:59:00.0
Description: NM 45 NB/SB (Elison to Westside) milepost 22 (9/25 thru 12/15) There will be left lane and median restrictions. Work is being performed for City of Albuquerque landscape beautification. Motorists should anticipate delays. Contractor: Lee Landscape
Post Date: 2023-09-21 08:56:03.0
Update Date: 2023-09-21 08:56:03.0
Expiration Date: 2023-12-15 23:59:00.0
Title: Construction Closure, NM 47 northbound at mile marker 44, Mountainview.
Description: NM 47 NB milepost 44-45 (Thru 11/2) There will be right lane and shoulder restrictions. Work is being performed for commercial development. Motorists should anticipate delays. Contractor: Franklin Construction
Post Date: 2023-09-21 08:51:36.0
Update Date: 2023-09-21 08:51:36.0
Expiration Date: 2023-11-02 23:59:00.0
Description: NM 47 NB milepost 44-45 (Thru 11/2) There will be right lane and shoulder restrictions. Work is being performed for commercial development. Motorists should anticipate delays. Contractor: Franklin Construction
Post Date: 2023-09-21 08:51:36.0
Update Date: 2023-09-21 08:51:36.0
Expiration Date: 2023-11-02 23:59:00.0
Title: Alert, NM 448 at mile marker 10 Corrales.
Description: ALERT-NM448 at Sagebrush milepost 9.7 (9/29) The New Mexico Department of Transportation will have a road closure of the highway. Detours will be established. Work is being performed for highway maintenance. Motorists should anticipate delays. NMDOT: Barry Lytle
Post Date: 2023-09-21 08:34:49.0
Update Date: 2023-09-21 08:34:49.0
Expiration Date: 2023-09-29 15:30:00.0
Description: ALERT-NM448 at Sagebrush milepost 9.7 (9/29) The New Mexico Department of Transportation will have a road closure of the highway. Detours will be established. Work is being performed for highway maintenance. Motorists should anticipate delays. NMDOT: Barry Lytle
Post Date: 2023-09-21 08:34:49.0
Update Date: 2023-09-21 08:34:49.0
Expiration Date: 2023-09-29 15:30:00.0
Title: Construction Closure, I 40 eastbound and westbound at mile marker 177, Cedro.
Description: I-40 EB/WB milepost 173-182 (Thru 10/23) The New Mexico Department of Transportation will be having various lane and shoulder restriction. The work being performed for interstate maintenance. This will be night work. Motorists should anticipate delays. Contractor: MSCI Project A302123 NMDOT: Will Rose
Post Date: 2023-09-21 08:22:44.0
Update Date: 2023-09-21 08:28:35.0
Expiration Date: 2023-10-23 23:59:00.0
Description: I-40 EB/WB milepost 173-182 (Thru 10/23) The New Mexico Department of Transportation will be having various lane and shoulder restriction. The work being performed for interstate maintenance. This will be night work. Motorists should anticipate delays. Contractor: MSCI Project A302123 NMDOT: Will Rose
Post Date: 2023-09-21 08:22:44.0
Update Date: 2023-09-21 08:28:35.0
Expiration Date: 2023-10-23 23:59:00.0
Title: Construction Closure, I 40 eastbound at mile marker 149, (W. CentralL /Paseo del Volcan).
Description: I-40 EB milepost 148.9 (Thru 10/4) The New Mexico Department of Transportation will be having right lane and shoulder restrictions. Work is being performed for interstate maintenance. Motorists should anticipate delays. Contractor: Uretek USA NMDOT: Barry Lytle
Post Date: 2023-09-21 08:06:14.0
Update Date: 2023-09-21 08:06:14.0
Expiration Date: 2023-10-04 23:59:00.0
Description: I-40 EB milepost 148.9 (Thru 10/4) The New Mexico Department of Transportation will be having right lane and shoulder restrictions. Work is being performed for interstate maintenance. Motorists should anticipate delays. Contractor: Uretek USA NMDOT: Barry Lytle
Post Date: 2023-09-21 08:06:14.0
Update Date: 2023-09-21 08:06:14.0
Expiration Date: 2023-10-04 23:59:00.0
Title: Construction Closure, I 25 northbound at mile marker 227, (Comanche).
Description: I-25 FRT NB/SB milepost 227-229 (9/25 thru 9/29) The New Mexico Department of Transportation will be having various lane and shoulder restrictions. Work is being performed for utility maintenance. Motorists should anticipate delays. Contractor: T2 UT Engineers Project A301901 NMDOT: TBD
Post Date: 2023-09-21 08:03:30.0
Update Date: 2023-09-21 08:03:30.0
Expiration Date: 2023-09-29 15:00:00.0
Description: I-25 FRT NB/SB milepost 227-229 (9/25 thru 9/29) The New Mexico Department of Transportation will be having various lane and shoulder restrictions. Work is being performed for utility maintenance. Motorists should anticipate delays. Contractor: T2 UT Engineers Project A301901 NMDOT: TBD
Post Date: 2023-09-21 08:03:30.0
Update Date: 2023-09-21 08:03:30.0
Expiration Date: 2023-09-29 15:00:00.0
Title: Roadwork, NM 41 from mile marker 56, Galisteo to mile marker 62, Lamy.
Description: Roadwork~~~NM 41 Phase III Improvements – Milepost 56.6 to US 84/285 ***A new traffic pattern has been put in place for the duration of the project. One lane will be open in each direction and the speed limit will be reduced to 35 mph in the construction zone for the duration of the project. ***
Post Date: 2022-07-21 14:43:17.0
Update Date: 2022-11-08 07:58:18.0
Expiration Date: unknown
Description: Roadwork~~~NM 41 Phase III Improvements – Milepost 56.6 to US 84/285 ***A new traffic pattern has been put in place for the duration of the project. One lane will be open in each direction and the speed limit will be reduced to 35 mph in the construction zone for the duration of the project. ***
Post Date: 2022-07-21 14:43:17.0
Update Date: 2022-11-08 07:58:18.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 124, 1 mile north of Carrizozo.
Description: Roadwork~~~FULL SUSPENSION-Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Temporary Traffic Signals have been installed at the intersection of US 54 & US 380, all directions are down to one lane through the intersection, Motorist should obey Traffic Signals at all times. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667
Post Date: 2022-09-15 14:35:30.0
Update Date: 2023-08-01 12:25:03.0
Expiration Date: unknown
Description: Roadwork~~~FULL SUSPENSION-Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Temporary Traffic Signals have been installed at the intersection of US 54 & US 380, all directions are down to one lane through the intersection, Motorist should obey Traffic Signals at all times. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667
Post Date: 2022-09-15 14:35:30.0
Update Date: 2023-08-01 12:25:03.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2023-08-01 12:08:40.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2023-08-01 12:08:40.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 0, Texas State Line to mile marker 8, 8 miles south of Malaga.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2020-08-13 14:51:47.0
Update Date: 2023-08-01 11:59:19.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2020-08-13 14:51:47.0
Update Date: 2023-08-01 11:59:19.0
Expiration Date: unknown
Title: Construction Closure, I 40 eastbound at mile marker 161, (Carlisle).
Description: I-40 EB/WB milepost 160-163 (Thru 9/30) The New Mexico Department of Transportation will be having various lane, ramp, and shoulder restrictions. Detours will be established. Work being performed for interstate maintenance. Motorists should anticipate delays. Contractor: AAI Project A302125 NMDOT: Josh Gallegos
Post Date: 2023-04-06 14:56:03.0
Update Date: 2023-09-21 08:07:55.0
Expiration Date: 2023-09-30 23:59:00.0
Description: I-40 EB/WB milepost 160-163 (Thru 9/30) The New Mexico Department of Transportation will be having various lane, ramp, and shoulder restrictions. Detours will be established. Work being performed for interstate maintenance. Motorists should anticipate delays. Contractor: AAI Project A302125 NMDOT: Josh Gallegos
Post Date: 2023-04-06 14:56:03.0
Update Date: 2023-09-21 08:07:55.0
Expiration Date: 2023-09-30 23:59:00.0
Title: Roadwork, US 60 from mile marker 266, 2 miles west of Vaughn to mile marker 267, 1 mile west of Vaughn. , right shoulder, and left shoulder
Description: Roadwork~~~Bridge Rehabilitation and reconstruction on US60/285 mile post 266.500 to mile post 267.626. Kimo Construction is continuing bridge reconstruction operations with traffic reduced to one lane each direction on the bridge. Motorist can expect delays or seek an alternate route. Drivers please be aware of equipment and personnel in the work zone. Also please follow and obey all posted signs. Please follow signs for detour, speed limit is reduced to 45 miles per hour in the work zone and there is a 12ft width restriction. Work is expected to be complete fall of 2023, depending on weather and other unforeseen delays. Contractor - Kimo Construction Lucas Lucero – 505-452-7217 or Romie Jone 505-339-7544 NMDOT - Donna Gililland 575-626-4857
Post Date: 2020-01-02 12:39:45.0
Update Date: 2023-09-21 13:21:49.0
Expiration Date: unknown
Description: Roadwork~~~Bridge Rehabilitation and reconstruction on US60/285 mile post 266.500 to mile post 267.626. Kimo Construction is continuing bridge reconstruction operations with traffic reduced to one lane each direction on the bridge. Motorist can expect delays or seek an alternate route. Drivers please be aware of equipment and personnel in the work zone. Also please follow and obey all posted signs. Please follow signs for detour, speed limit is reduced to 45 miles per hour in the work zone and there is a 12ft width restriction. Work is expected to be complete fall of 2023, depending on weather and other unforeseen delays. Contractor - Kimo Construction Lucas Lucero – 505-452-7217 or Romie Jone 505-339-7544 NMDOT - Donna Gililland 575-626-4857
Post Date: 2020-01-02 12:39:45.0
Update Date: 2023-09-21 13:21:49.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 305, 21 miles north of Santa Fe to mile marker 309, 25 miles north of Santa Fe.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 45 mph and motorists can anticipate minor delays.
Post Date: 2023-08-26 11:52:17.0
Update Date: 2023-09-05 07:33:31.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 45 mph and motorists can anticipate minor delays.
Post Date: 2023-08-26 11:52:17.0
Update Date: 2023-09-05 07:33:31.0
Expiration Date: unknown
Title: Closure, NM 91 at mile marker 1, 1 mile south of Santa Rosa.
Description: Closure~~~Bridge closed due to structural failure. Detour is in place through Blue Hole Road and Reilly Road.
Post Date: 2023-08-05 09:31:15.0
Update Date: 2023-08-07 13:31:15.0
Expiration Date: unknown
Description: Closure~~~Bridge closed due to structural failure. Detour is in place through Blue Hole Road and Reilly Road.
Post Date: 2023-08-05 09:31:15.0
Update Date: 2023-08-07 13:31:15.0
Expiration Date: unknown
Title: Roadwork, I 40 at mile marker 44, Coolidge Interchange.
Description: Roadwork~~~Roadwork on I-40, mile marker 44 (Coolidge). Eastbound has 2 lanes open to traffic and westbound is reduced to one lane. Speed reduced to 55 mph the construction zone. For more information contact El Terrero Construction at (505) 896-3864. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-03-04 08:09:09.0
Update Date: 2023-09-19 10:29:49.0
Expiration Date: 2099-12-31 12:00:00.0
Description: Roadwork~~~Roadwork on I-40, mile marker 44 (Coolidge). Eastbound has 2 lanes open to traffic and westbound is reduced to one lane. Speed reduced to 55 mph the construction zone. For more information contact El Terrero Construction at (505) 896-3864. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-03-04 08:09:09.0
Update Date: 2023-09-19 10:29:49.0
Expiration Date: 2099-12-31 12:00:00.0
Title: Roadwork, I 10 from mile marker 2, (Vinton) to mile marker 22, (LORDSBURG).
Description: Roadwork~~~MWI, Inc. (Contractor) will be continuing the installation of the Truck Parking Availability System (TPAS) along Interstate 10 from milepost 2 (NM/AZ Stateline) to milepost 163 (Anthony). Motorists can expect lane closures in both the eastbound and westbound driving right lane from milepost 18 to 23. The hours of operation will be from 7 a.m. to 5 p.m., Monday through Thursday.
Post Date: 2023-07-31 11:56:55.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Description: Roadwork~~~MWI, Inc. (Contractor) will be continuing the installation of the Truck Parking Availability System (TPAS) along Interstate 10 from milepost 2 (NM/AZ Stateline) to milepost 163 (Anthony). Motorists can expect lane closures in both the eastbound and westbound driving right lane from milepost 18 to 23. The hours of operation will be from 7 a.m. to 5 p.m., Monday through Thursday.
Post Date: 2023-07-31 11:56:55.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Title: Roadwork, US 64 westbound from mile marker 387, 38 miles east of Raton to mile marker 393 Sofia. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2023-08-28 08:08:46.0
Update Date: 2023-08-28 08:08:46.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2023-08-28 08:08:46.0
Update Date: 2023-08-28 08:08:46.0
Expiration Date: unknown
Title: Roadwork, US 180 from mile marker 115, 1 mile east of Silver Arces to mile marker 128, 1 mile east of Hurley.
Description: Roadwork~~~Crews have completed Fog Sealing US 180 from milepost 115 (32nd Street) to 128 (east of Hurley) in Silver City. Striping is scheduled to take place in the upcoming months. Signage will stay in place for safety.
Post Date: 2023-03-27 09:12:33.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Description: Roadwork~~~Crews have completed Fog Sealing US 180 from milepost 115 (32nd Street) to 128 (east of Hurley) in Silver City. Striping is scheduled to take place in the upcoming months. Signage will stay in place for safety.
Post Date: 2023-03-27 09:12:33.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Title: Alert, US 70 at mile marker 184, 22 miles west of Holloman AFB.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: Mon Jun 27 10:28:09 MDT 2022
Update Date: 2023-09-27 09:56:11.0
Expiration Date: unknown
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: Mon Jun 27 10:28:09 MDT 2022
Update Date: 2023-09-27 09:56:11.0
Expiration Date: unknown
Title: Construction Closure, NM 101 eastbound and westbound at mile marker 0, Mesilla.
Description: Construction Closure~~~JGF Built LLC (Contractor) is currently replacing the underground utilities on NM 101 from milepost 0 to 0.8 (Intersection of Avenida de Mesilla and University Ave.) in the Town of Mesilla. Traffic can expect a full roadway closure, a detour is in place on NM 28 (Ave. De Mesilla), NM 373 (Union Ave), and McDowell Rd. Please obey traffic control devices. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday. Drivers should expect delays and plan accordingly.
Post Date: 2023-06-26 14:30:30.0
Update Date: 2023-06-26 14:30:30.0
Expiration Date: unknown
Description: Construction Closure~~~JGF Built LLC (Contractor) is currently replacing the underground utilities on NM 101 from milepost 0 to 0.8 (Intersection of Avenida de Mesilla and University Ave.) in the Town of Mesilla. Traffic can expect a full roadway closure, a detour is in place on NM 28 (Ave. De Mesilla), NM 373 (Union Ave), and McDowell Rd. Please obey traffic control devices. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday. Drivers should expect delays and plan accordingly.
Post Date: 2023-06-26 14:30:30.0
Update Date: 2023-06-26 14:30:30.0
Expiration Date: unknown
Title: Roadwork, NM 104 from mile marker 0, Las Vegas to mile marker 5, 5 miles east of Las Vegas. Left lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 35 mph and motorists can anticipate minor delays.
Post Date: 2023-06-26 07:34:27.0
Update Date: 2023-06-26 07:34:27.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced to 35 mph and motorists can anticipate minor delays.
Post Date: 2023-06-26 07:34:27.0
Update Date: 2023-06-26 07:34:27.0
Expiration Date: unknown
Title: Construction Closure, NM 6 eastbound and westbound at mile marker 35, Los Lunas.
Description: NM 6 WB milepost 35-36 (Thru 10/31) The New Mexico Department of Transportation will be having various lane and shoulder restrictions. Work is being performed for highway maintenance. Motorists should anticipate delays. Contractor: AUI NMDOT: Barry Lytle
Post Date: 2023-07-24 08:48:17.0
Update Date: 2023-09-21 08:30:38.0
Expiration Date: 2023-10-31 23:59:00.0
Description: NM 6 WB milepost 35-36 (Thru 10/31) The New Mexico Department of Transportation will be having various lane and shoulder restrictions. Work is being performed for highway maintenance. Motorists should anticipate delays. Contractor: AUI NMDOT: Barry Lytle
Post Date: 2023-07-24 08:48:17.0
Update Date: 2023-09-21 08:30:38.0
Expiration Date: 2023-10-31 23:59:00.0
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad. Center lane closed.
Description: Roadwork~~~FULL SUSPENSION-Road construction is underway between MM 38.5 and 42.0 on US 285. The Speed Limit is reduced to 45 MPH. Motorists should obey all construction signing and watch for construction personnel and equipment. Brian Torres, NMDOT Project Manager (575) 626-4278; Rick Castillo, NMDOT Construction Traffic Control Supervisor (512) 630-3554; Erin Millwood, Bixby Electric, Project Manager (505) 263.3421; Trae Baldwin, Bixby Electric Traffic Control Supervisor (505) 379-8058.
Post Date: 2022-08-22 15:46:56.0
Update Date: 2023-08-01 12:19:16.0
Expiration Date: unknown
Description: Roadwork~~~FULL SUSPENSION-Road construction is underway between MM 38.5 and 42.0 on US 285. The Speed Limit is reduced to 45 MPH. Motorists should obey all construction signing and watch for construction personnel and equipment. Brian Torres, NMDOT Project Manager (575) 626-4278; Rick Castillo, NMDOT Construction Traffic Control Supervisor (512) 630-3554; Erin Millwood, Bixby Electric, Project Manager (505) 263.3421; Trae Baldwin, Bixby Electric Traffic Control Supervisor (505) 379-8058.
Post Date: 2022-08-22 15:46:56.0
Update Date: 2023-08-01 12:19:16.0
Expiration Date: unknown
Title: Construction Closure, NM 47 northbound at mile marker 43, 1 mile south of Mountainview.
Description: NM 47 NB milepost 43.5-43.7 (Thru 11/30) There will be right lane and shoulder restrictions. Work is being performed for environmental cleanup. Motorists should anticipate delays. Contractor: Emergency Enviro
Post Date: 2023-08-21 11:15:07.0
Update Date: 2023-09-21 08:49:36.0
Expiration Date: 2023-11-30 23:59:00.0
Description: NM 47 NB milepost 43.5-43.7 (Thru 11/30) There will be right lane and shoulder restrictions. Work is being performed for environmental cleanup. Motorists should anticipate delays. Contractor: Emergency Enviro
Post Date: 2023-08-21 11:15:07.0
Update Date: 2023-09-21 08:49:36.0
Expiration Date: 2023-11-30 23:59:00.0
Title: Construction Closure, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Construction Closure~~~Construction continues on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. . Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. *** One lane will be closed for the duration of the project, and flaggers and a pilot car will be on hand to guide motorists through the construction zone 24 hours a day, 7 days a week until the end of the project. *** Please obey all traffic control personnel and proceed with caution through the roadwork zone. *** PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!***
Post Date: 2022-04-18 07:33:36.0
Update Date: 2023-06-29 11:39:06.0
Expiration Date: unknown
Description: Construction Closure~~~Construction continues on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. . Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. *** One lane will be closed for the duration of the project, and flaggers and a pilot car will be on hand to guide motorists through the construction zone 24 hours a day, 7 days a week until the end of the project. *** Please obey all traffic control personnel and proceed with caution through the roadwork zone. *** PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!***
Post Date: 2022-04-18 07:33:36.0
Update Date: 2023-06-29 11:39:06.0
Expiration Date: unknown
Title: Roadwork, US 60 from mile marker 387, 1 mile west of Clovis to mile marker 389, eastside of Clovis. Roadway closed.
Description: Roadwork~~~Road Reconstruction project on US60/84 from MP 387.800 to MP 389.120. Work has begun on Phase One which will include waterline/drainage structures installation as well as building of water basin. Santa Fe Ave is closed to traffic and the US60/84 Eastbound Lane will be reduced from two to one lane from Ash St to Sycamore St. Also on US60/84 from Grand Ave to Main St traffic is reduced to one lane in each direction. There is a 12ft width restriction, oversized or wide loads must use the designated truck bypass off of Hall St. Project expected completion date is Summer of 2025 depending on weather and delays. Contractor - AUI, Inc.- Carl Johnson 505-401-5251 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-17 15:32:10.0
Update Date: 2023-09-22 14:52:08.0
Expiration Date: unknown
Description: Roadwork~~~Road Reconstruction project on US60/84 from MP 387.800 to MP 389.120. Work has begun on Phase One which will include waterline/drainage structures installation as well as building of water basin. Santa Fe Ave is closed to traffic and the US60/84 Eastbound Lane will be reduced from two to one lane from Ash St to Sycamore St. Also on US60/84 from Grand Ave to Main St traffic is reduced to one lane in each direction. There is a 12ft width restriction, oversized or wide loads must use the designated truck bypass off of Hall St. Project expected completion date is Summer of 2025 depending on weather and delays. Contractor - AUI, Inc.- Carl Johnson 505-401-5251 ; NMDOT PM- Debbie Ysasi 575-291-5208.
Post Date: 2023-07-17 15:32:10.0
Update Date: 2023-09-22 14:52:08.0
Expiration Date: unknown
Title: Roadwork, US 64 from mile marker 273, 13 miles west of Eagle Nest to mile marker 276, 10 miles west of Eagle Nest.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced down to 25 mph with a width restriction of 9.5 ft. and length restriction of 65 ft. Motorists can anticipate delays.
Post Date: 2023-04-17 09:42:31.0
Update Date: 2023-07-06 07:57:26.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions. Speed has been reduced down to 25 mph with a width restriction of 9.5 ft. and length restriction of 65 ft. Motorists can anticipate delays.
Post Date: 2023-04-17 09:42:31.0
Update Date: 2023-07-06 07:57:26.0
Expiration Date: unknown
Title: Roadwork, US 84 northbound and southbound at mile marker 208, Tierra Azul.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) and Hasse Contracting Company Inc. will begin a bridge repair project at mile marker 208 on U.S. 84 in Abiquiu. This project will consist of structural repairs and modifications, concrete drainage installation, concrete wall barrier installation, and new guardrail installations. *** Starting August 14th, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. Working hours will be from 7a.m. to 5p.m., Monday through Friday. All lanes will be reopened by the end of the workday and all traffic control devices will be removed from the roadway. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. ***
Post Date: 2023-08-14 10:03:01.0
Update Date: 2023-08-14 10:03:01.0
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) and Hasse Contracting Company Inc. will begin a bridge repair project at mile marker 208 on U.S. 84 in Abiquiu. This project will consist of structural repairs and modifications, concrete drainage installation, concrete wall barrier installation, and new guardrail installations. *** Starting August 14th, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. Working hours will be from 7a.m. to 5p.m., Monday through Friday. All lanes will be reopened by the end of the workday and all traffic control devices will be removed from the roadway. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. ***
Post Date: 2023-08-14 10:03:01.0
Update Date: 2023-08-14 10:03:01.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2022-11-08 07:57:24.0
Expiration Date: unknown
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2022-11-08 07:57:24.0
Expiration Date: unknown
Title: Construction Closure, I 25 from mile marker 264, (COCHITI/NM 16) to mile marker 267, WALDO.
Description: Construction Closure~~~The first phase of the La Bajada Slope Mitigation project begins on July 11, 2022. This will entail the closure of the northbound right line and the construction of crossover lanes between the northbound and southbound roadways. 2 lanes will be open during peak hours for the duration of the project. At all other times, lane closures are possible, and motorists should plan their trips accordingly.
Post Date: 2022-07-11 12:14:48.0
Update Date: 2022-11-08 07:58:43.0
Expiration Date: unknown
Description: Construction Closure~~~The first phase of the La Bajada Slope Mitigation project begins on July 11, 2022. This will entail the closure of the northbound right line and the construction of crossover lanes between the northbound and southbound roadways. 2 lanes will be open during peak hours for the duration of the project. At all other times, lane closures are possible, and motorists should plan their trips accordingly.
Post Date: 2022-07-11 12:14:48.0
Update Date: 2022-11-08 07:58:43.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~La Calerita LLC. (Contractor) construction, the first project is near completion with the contractor completing colored median pavement and cleanup around the project. The contractor has started on roundabout 3, during construction traffic will be shifted into the southbound lanes with the northbound lanes closed. NM 181 will be closed, and traffic will be shifted onto the detour route. The contractor will be working on storm drain construction and removing the original pavement. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours will be 7 a.m. to 5 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed.
Post Date: Mon Jan 09 10:16:30 MST 2023
Update Date: 2023-09-26 07:25:15.0
Expiration Date: unknown
Description: Roadwork~~~La Calerita LLC. (Contractor) construction, the first project is near completion with the contractor completing colored median pavement and cleanup around the project. The contractor has started on roundabout 3, during construction traffic will be shifted into the southbound lanes with the northbound lanes closed. NM 181 will be closed, and traffic will be shifted onto the detour route. The contractor will be working on storm drain construction and removing the original pavement. Motorists are encouraged to use extra caution in the construction zone, obey lower posted speed limits and allow extra time to reach their destinations. Regular work hours will be 7 a.m. to 5 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed.
Post Date: Mon Jan 09 10:16:30 MST 2023
Update Date: 2023-09-26 07:25:15.0
Expiration Date: unknown
Title: Roadwork, I 10 from mile marker 55, (QUINCY) to mile marker 65, 16 miles west of Deming.
Description: Roadwork~~~Mountain States Construction, Inc. (Contractor) has completed the roadway rehabilitation project on Interstate 10 from milepost 55 (Quincy) to milepost 65 (16 miles west of Deming). Currently, the subcontractor is installing concrete wall barriers throughout the project. Traffic should expect a lane closure in both the eastbound and westbound lanes as needed. The hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2023-02-06 10:58:17.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Description: Roadwork~~~Mountain States Construction, Inc. (Contractor) has completed the roadway rehabilitation project on Interstate 10 from milepost 55 (Quincy) to milepost 65 (16 miles west of Deming). Currently, the subcontractor is installing concrete wall barriers throughout the project. Traffic should expect a lane closure in both the eastbound and westbound lanes as needed. The hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2023-02-06 10:58:17.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Title: Roadwork, NM 26 at mile marker 26, 2 miles west of Nutt.
Description: Roadwork~~~Meridian Contracting, Inc. (Contractor) is currently working on a bridge rehabilitation project on NM 26 “Hatch Hwy” at milepost 26.8 near Nutt. Traffic can expect a temporary traffic signal in place with only one lane open over the bridge. Speed limits will be reduced, please obey traffic control devices. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday. Drivers should expect delays and plan accordingly.
Post Date: 2023-06-05 09:18:53.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Description: Roadwork~~~Meridian Contracting, Inc. (Contractor) is currently working on a bridge rehabilitation project on NM 26 “Hatch Hwy” at milepost 26.8 near Nutt. Traffic can expect a temporary traffic signal in place with only one lane open over the bridge. Speed limits will be reduced, please obey traffic control devices. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday. Drivers should expect delays and plan accordingly.
Post Date: 2023-06-05 09:18:53.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Title: Roadwork, NM 80 from mile marker 32, Roadforks to mile marker 8, at NM 9.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be starting the 2023 season “Chip Sealing and Brooming” operations in Hidalgo Co. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2023-05-01 12:45:37.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be starting the 2023 season “Chip Sealing and Brooming” operations in Hidalgo Co. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2023-05-01 12:45:37.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Title: Roadwork, NM 338 from mile marker 0, at I-10 to mile marker 24, Animas.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be starting the 2023 season “Chip Sealing and Brooming” operations in Hidalgo Co. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2023-05-01 12:45:03.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be starting the 2023 season “Chip Sealing and Brooming” operations in Hidalgo Co. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2023-05-01 12:45:03.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Title: Roadwork, NM 113 from mile marker 10, 10 miles north of NM 9 to mile marker 20, 1 mile south of I-10.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be starting the 2023 season “Chip Sealing and Brooming” operations in Hidalgo Co. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2023-05-01 12:44:33.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be starting the 2023 season “Chip Sealing and Brooming” operations in Hidalgo Co. Speed limits will be reduced, no center stripe with loose gravel on roadway.
Post Date: 2023-05-01 12:44:33.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Title: Roadwork, US 380 at mile marker 65, Carrizozo.
Description: Roadwork~~~Project is in Full Suspension-Dynamic Message signs are being installed throughout Lincoln and Otero Counties. US 380, MP 65 to MP 66, US 70 at MP 259 in Lincoln County and US 70 at MP 231 in Otero County. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Aaron Clark, NMDOT Project Manager (575)840-3566; Contractor; Erin Millwood, Bixby Electric, Construction Project Manager (505)263-3421 ; Russell Critchell, Bixby Electric, Construction Traffic Control Supervisor (505)238-3595
Post Date: 2023-05-01 09:30:41.0
Update Date: 2023-08-01 12:27:39.0
Expiration Date: unknown
Description: Roadwork~~~Project is in Full Suspension-Dynamic Message signs are being installed throughout Lincoln and Otero Counties. US 380, MP 65 to MP 66, US 70 at MP 259 in Lincoln County and US 70 at MP 231 in Otero County. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Aaron Clark, NMDOT Project Manager (575)840-3566; Contractor; Erin Millwood, Bixby Electric, Construction Project Manager (505)263-3421 ; Russell Critchell, Bixby Electric, Construction Traffic Control Supervisor (505)238-3595
Post Date: 2023-05-01 09:30:41.0
Update Date: 2023-08-01 12:27:39.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad.
Description: Roadwork~~~Roadwork for intersection lighting will begin on August 2nd, 2022 on US 285 from mm 38.5 to mm 42 (North of Carlsbad). There will be lane restrictions (780’ taper with drums) during the day from 6:00 AM to 6:00 PM with traffic control being taken off the road at the end of the work day. This is a 60 day project with estimated completion being September 2022. Contractor: Bixby Electric; Project Manager: Erin Millwood (505)263-3421 Superintendent: Russell Critchell (505)238-3595; TCS Trae Baldwin (505) 379-8058. NMDOT PM Brian Torres (575) 626-4278.
Post Date: 2022-07-29 12:13:40.0
Update Date: 2022-09-01 15:22:31.0
Expiration Date: unknown
Description: Roadwork~~~Roadwork for intersection lighting will begin on August 2nd, 2022 on US 285 from mm 38.5 to mm 42 (North of Carlsbad). There will be lane restrictions (780’ taper with drums) during the day from 6:00 AM to 6:00 PM with traffic control being taken off the road at the end of the work day. This is a 60 day project with estimated completion being September 2022. Contractor: Bixby Electric; Project Manager: Erin Millwood (505)263-3421 Superintendent: Russell Critchell (505)238-3595; TCS Trae Baldwin (505) 379-8058. NMDOT PM Brian Torres (575) 626-4278.
Post Date: 2022-07-29 12:13:40.0
Update Date: 2022-09-01 15:22:31.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Roadwork, US 84 from mile marker 6, 6 miles north of Fort Sumner to mile marker 12, 12 miles north of Fort Sumner.
Description: Roadwork~~~Road Rehabilitation on US84 from MP 6.740 to MP 12.736. Work began in June 2023. In the workzone traffic is reduced to one lane with a pilot car so expect delays. When traveling through the work zone please obey all posted signage and be aware of personnel as well as equipment. Project expected completion date is Fall of 2023. NMDOT PM- Debbie Ysasi 575-291-5208 K Barnett Superintendent- Art Metcalf (336)417-2752.
Post Date: 2023-05-26 15:47:28.0
Update Date: 2023-09-22 14:51:13.0
Expiration Date: unknown
Description: Roadwork~~~Road Rehabilitation on US84 from MP 6.740 to MP 12.736. Work began in June 2023. In the workzone traffic is reduced to one lane with a pilot car so expect delays. When traveling through the work zone please obey all posted signage and be aware of personnel as well as equipment. Project expected completion date is Fall of 2023. NMDOT PM- Debbie Ysasi 575-291-5208 K Barnett Superintendent- Art Metcalf (336)417-2752.
Post Date: 2023-05-26 15:47:28.0
Update Date: 2023-09-22 14:51:13.0
Expiration Date: unknown
Title: Roadwork, US 84 from mile marker 12, 12 miles north of Fort Sumner to mile marker 18, 14 miles south of Puerto De Luna.
Description: Roadwork~~~Road Rehabilitation on US84 from MP 12.674 to MP 18.48. Roadwork is taking place with traffic reduced to one lane with portable traffic signals and pilot car. Due to lane being closed expect delays. There is a 12ft width restriction oversized loads please seek alternate route. When traveling through the workzone please obey all posted signage and be aware of personnel as well as equipment. Project expected completion date is Fall of 2023. NMDOT PM- Debbie Ysasi 575-291-5208 Mountain States Superintendent- Joe Lopez (505)492-8716
Post Date: 2023-05-26 15:44:13.0
Update Date: 2023-09-22 14:51:02.0
Expiration Date: unknown
Description: Roadwork~~~Road Rehabilitation on US84 from MP 12.674 to MP 18.48. Roadwork is taking place with traffic reduced to one lane with portable traffic signals and pilot car. Due to lane being closed expect delays. There is a 12ft width restriction oversized loads please seek alternate route. When traveling through the workzone please obey all posted signage and be aware of personnel as well as equipment. Project expected completion date is Fall of 2023. NMDOT PM- Debbie Ysasi 575-291-5208 Mountain States Superintendent- Joe Lopez (505)492-8716
Post Date: 2023-05-26 15:44:13.0
Update Date: 2023-09-22 14:51:02.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 123, Carrizozo. , right shoulder, and left shoulder
Description: Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667~~~
Post Date: 2022-02-18 11:01:42.0
Update Date: 2022-07-22 09:47:34.0
Expiration Date: unknown
Description: Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667~~~
Post Date: 2022-02-18 11:01:42.0
Update Date: 2022-07-22 09:47:34.0
Expiration Date: unknown
Title: Alert, NM 14 northbound and southbound from mile marker 45, 2 miles south of Santa Fe to mile marker 29, Madrid.
Description: Alert~~~Vehicles over 55' in length are required to obtain a permit in order to enter this section of roadway. No vehicles over 55' in length are allowed to pass through the town of Madrid N.M. *** For a permit, please contact Leslie Sanchez at: leslie.sanchez@dot.nm.gov
Post Date: 2023-08-18 16:23:26.0
Update Date: 2023-08-18 16:23:26.0
Expiration Date: unknown
Description: Alert~~~Vehicles over 55' in length are required to obtain a permit in order to enter this section of roadway. No vehicles over 55' in length are allowed to pass through the town of Madrid N.M. *** For a permit, please contact Leslie Sanchez at: leslie.sanchez@dot.nm.gov
Post Date: 2023-08-18 16:23:26.0
Update Date: 2023-08-18 16:23:26.0
Expiration Date: unknown
Title: Alert, NM 14 from mile marker 15, 2 miles south of Golden to mile marker 28, 1 mile south of Madrid.
Description: Alert~~~Vehicles over 55' in length are required to obtain a permit in order to enter this section of roadway. No vehicles over 55' in length are allowed to pass through the town of Madrid N.M. *** For a permit, please contact Leslie Sanchez at: leslie.sanchez@dot.nm.gov
Post Date: 2023-08-18 16:21:45.0
Update Date: 2023-08-18 16:23:54.0
Expiration Date: unknown
Description: Alert~~~Vehicles over 55' in length are required to obtain a permit in order to enter this section of roadway. No vehicles over 55' in length are allowed to pass through the town of Madrid N.M. *** For a permit, please contact Leslie Sanchez at: leslie.sanchez@dot.nm.gov
Post Date: 2023-08-18 16:21:45.0
Update Date: 2023-08-18 16:23:54.0
Expiration Date: unknown
Title: Alert, NM 14 northbound and southbound from mile marker 28, 1 mile south of Madrid to mile marker 29, Madrid.
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2023-08-18 16:17:57.0
Expiration Date: unknown
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2023-08-18 16:17:57.0
Expiration Date: unknown
Title: Construction Closure, I 40 eastbound and westbound from mile marker 232, 14 miles east of Clines Corner to mile marker 239, (McKENZIE).
Description: Construction Closure~~~The NMDOT and Mountain States Constructors Inc. have begun a road reconstruction project on I-40 between mile markers 232 and 239.5. The project is expected to be completed by Nov. 2023. The project will include full width roadway preservation, guardrail replacement and limited permanent signing. The contractor will move the eastbound traffic lanes onto the westbound side of I-40 next week, separated by a continuous concrete wall barrier. Traffic will be reduced to one lane in each direction and there will be a width restriction in place of 14 feet throughout the length and duration of the project. The speed limit will be reduced to 55 mph inside the construction zone. Once the eastbound lanes are completed, work will commence on the westbound lanes. The NMDOT reminds motorists to expect delays, plan ahead, watch for workers, slow down, and follow the posted speed limit as they travel through the double fine zone.
Post Date: 2023-04-14 11:04:42.0
Update Date: 2023-04-14 11:04:42.0
Expiration Date: 2023-11-30 23:59:00.0
Description: Construction Closure~~~The NMDOT and Mountain States Constructors Inc. have begun a road reconstruction project on I-40 between mile markers 232 and 239.5. The project is expected to be completed by Nov. 2023. The project will include full width roadway preservation, guardrail replacement and limited permanent signing. The contractor will move the eastbound traffic lanes onto the westbound side of I-40 next week, separated by a continuous concrete wall barrier. Traffic will be reduced to one lane in each direction and there will be a width restriction in place of 14 feet throughout the length and duration of the project. The speed limit will be reduced to 55 mph inside the construction zone. Once the eastbound lanes are completed, work will commence on the westbound lanes. The NMDOT reminds motorists to expect delays, plan ahead, watch for workers, slow down, and follow the posted speed limit as they travel through the double fine zone.
Post Date: 2023-04-14 11:04:42.0
Update Date: 2023-04-14 11:04:42.0
Expiration Date: 2023-11-30 23:59:00.0
Title: Roadwork, NM 404 from mile marker 1 to mile marker 9.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor), will be continuing the roadway reconstruction and lighting project on NM 404 from milepost 0.9 (Anthony) to milepost 8.8 (Chaparral). Currently, the contractor is installing drainage structures, subgrade preparations and paving along the project. Subcontractors are working overnight from 11 p.m. to 6:30 a.m. installing concrete wall barriers. The speed limit has been reduced to 45 MPH for the safety of the traveling public. The contractor’s hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday, some Saturdays as needed.
Post Date: 2022-12-09 13:32:21.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor), will be continuing the roadway reconstruction and lighting project on NM 404 from milepost 0.9 (Anthony) to milepost 8.8 (Chaparral). Currently, the contractor is installing drainage structures, subgrade preparations and paving along the project. Subcontractors are working overnight from 11 p.m. to 6:30 a.m. installing concrete wall barriers. The speed limit has been reduced to 45 MPH for the safety of the traveling public. The contractor’s hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday, some Saturdays as needed.
Post Date: 2022-12-09 13:32:21.0
Update Date: 2023-09-26 07:23:08.862
Expiration Date: unknown
Title: Alert, NM 475 northbound and southbound from mile marker 1 to mile marker 5.
Description: Alert~~~Beginning Monday, September 11, 2023, PNM will begin a project to upgrade the electrical service to residents on N.M. 475. One lane will be closed in various spots between mile marker 2.5 to 4.5 until the project is completed. *** For more information, please contact Tina Mares at PNM @ (480) 712-0559. ***
Post Date: 2023-09-08 12:37:39.0
Update Date: 2023-09-08 12:37:39.0
Expiration Date: unknown
Description: Alert~~~Beginning Monday, September 11, 2023, PNM will begin a project to upgrade the electrical service to residents on N.M. 475. One lane will be closed in various spots between mile marker 2.5 to 4.5 until the project is completed. *** For more information, please contact Tina Mares at PNM @ (480) 712-0559. ***
Post Date: 2023-09-08 12:37:39.0
Update Date: 2023-09-08 12:37:39.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 17, 1 mile north of Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2023-08-01 12:00:45.0
Expiration Date: unknown
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2023-08-01 12:00:45.0
Expiration Date: unknown
Title: Roadwork, US 70 from mile marker 370, 1 mile east of Elkins to mile marker 385, 3 miles west of Kenna.
Description: Roadwork~~~Roadway Rehabilitation work on US 70 mile post 370 to mile post 385 eastbound traffic has been reduce to 1 lane. Motorists can expect delays or seek and alternate route. Drives please be aware of equipment and personnel in the work zone. Please follow post signs and speed limits. Work is expected to be completed fall of 2023, depending on weather and other unforeseen delays. Contractor - Constructor's Inc. Mark Brooks 575-706-4594 Traffic Control Supervisor 575-937-4667, NMDOT Project Manager Donna Gililland 575-626-4857
Post Date: 2023-09-01 10:44:20.0
Update Date: 2023-09-21 13:21:35.0
Expiration Date: unknown
Description: Roadwork~~~Roadway Rehabilitation work on US 70 mile post 370 to mile post 385 eastbound traffic has been reduce to 1 lane. Motorists can expect delays or seek and alternate route. Drives please be aware of equipment and personnel in the work zone. Please follow post signs and speed limits. Work is expected to be completed fall of 2023, depending on weather and other unforeseen delays. Contractor - Constructor's Inc. Mark Brooks 575-706-4594 Traffic Control Supervisor 575-937-4667, NMDOT Project Manager Donna Gililland 575-626-4857
Post Date: 2023-09-01 10:44:20.0
Update Date: 2023-09-21 13:21:35.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site
Tweets by ABQTraffic
Currently
![]() |
81°F |
30.17in
Barometer 10%
Humidity West 10.4mph Wind |
Fair |