San Jon Traffic and Road Conditions

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

San Jon Traffic Alerts

Title: US 380 eastbound and westbound at mile marker 107 Hondo
Description: Trucks over 65 foot are prohibited on US 380 between Hondo and Carrizozo. This is a PERMANENT ALERT.
Post Date: 2016-06-22 11:07:22.0
Update Date: 2016-08-23 09:49:15.539
Expiration Date: unknown
Title: US 380 eastbound and westbound at mile marker 66 Carrizozo
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.
Post Date: 2016-06-22 11:06:27.0
Update Date: 2016-08-23 09:49:15.539
Expiration Date: unknown
Title: US 550 eastbound and westbound at mile marker 148
Description: US 550 Mile Marker 148.55 #8244 Bloomfield - Bridge rehabilitation work on US 550 at mile marker 148.556 at the Kutz Canyon Bridge in Bloomfield. TRAFFIC IMPACTS: South of Bloomfield at the Kutz Canyon Bridge work from 6/29 thru 7/1 installing the epoxy overlay and will have various lane closures from 5:30 am to 7:00 pm. This project is scheduled for completion August of 2016.
Post Date: 2016-03-16 17:21:51.0
Update Date: 2016-07-07 10:24:57.0
Expiration Date: unknown
Title: US 285 from mile marker 1 to mile marker 11, right lane and right shoulder closed.
Description: Roadway Construction underway on US 285 from mile post 0 Texas State Line to Mile Post 11. Motorists can expect a one lane closure with some delays. There is a 11 foot width restriction and pilot car operations through the work zone. Please obey all posted signage, reduce your speed and use caution in the area watching for personnel and equipment. Work is scheduled to be complete by the Winter of 2016. Contractor: Constructors Inc, Billy Warren 575-361-4950 NMDOT Contact: Willie McCray (Project Manager) 575-234-0344
Post Date: Tue Jun 28 15:31:42 MDT 2016
Update Date: 2016-08-19 08:23:54.0
Expiration Date: Thu Dec 01 01:00:00 MST 2016
Title: Interstate 25 northbound at mile marker 225 (LOMAS / MLK)
Description: I 25 LOMAS OFF-RAMP CLOSURE: Friday August 26 at 9 p.m. to Sunday Aug. 28 at 5 a.m. for roadwork. Contractor: Truesdell Corp.
Post Date: Tue Aug 23 15:10:44 MDT 2016
Update Date: 2016-08-23 15:30:44.0
Expiration Date: Mon Aug 29 00:00:00 MDT 2016
Title: I-40 East and Westbound Utility work on shoulder. Contractor: New Mexico Gas Co.
Description: Aug. 16-Sept. 12, 2016 ; 8 a.m. - 5 p.m. each day.
Post Date: 2016-08-16 08:25:01.0
Update Date: 2016-08-16 08:25:01.0
Expiration Date: 2016-09-12 18:00:00.0
Title: Interstate 40 northbound and southbound from mile marker 233 to mile marker 239 (McKENZIE)
Description: Bridge improvement work on I-40 from mile marker 233.705 to mile marker 239.428 east of Clines Corners. There are two bridges under construction; the I-40 Bridge (Exit 234) near the Flying "C" and the I-40 Bridge (Exit 239) at McKenzie. DAY TRAFFIC IMPACTS: I-40 Bridge (Exit 234) near the Flying C Ranch cross road over I-40 is reduced to one lane of travel. There is a temporary signal light that will guide traffic across the bridge. The I-40 Bridge (Exit 239) on and off ramps at McKenzie are CLOSED. The cross road over I-40 is reduced to one lane of travel. This bridge work is scheduled to be completed June of 2016.
Post Date: 2016-05-03 16:53:35.0
Update Date: 2016-08-22 15:54:05.206
Expiration Date: unknown
Title: US 380 eastbound and westbound at mile marker 43
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a permanent alert and will not be updated regularly.
Post Date: 2014-12-02 15:01:56.003
Update Date: 2016-08-23 09:49:15.539
Expiration Date: unknown
Title: New Mexico 456 eastbound and westbound from mile marker 20 to mile marker 38
Description: This an unimproved gravel road section which may be difficult to navigate. This description is permanent and has no expiration date.
Post Date: 2015-06-25 16:19:56.0
Update Date: 2016-04-17 11:39:28.0
Expiration Date: unknown
Title: New Mexico 47 northbound and southbound from mile marker 31 to mile marker 33 Peralta
Description: NMDOT and AUI, Contractor are reconstructing a portion of NM 47 through the town of Peralta. Project expected completion: Fall 2016 Crew hours: 4 a.m. - 6 p.m. Monday - Saturday; traffic will be reduced to one north and southbound lane with a center left turn lane on NM 47 at milepost 31-32.8. Motorists reduce speed to 35 m.p.h. in work zone. Work zone speed strictly enforced. Aug. 1, 2016 Traffic will be moved to southbound lanes. Detours in place. Molina Road closed from 8/1-8/5, 2016
Post Date: 2016-05-19 14:07:13.0
Update Date: 2016-08-05 14:07:22.0
Expiration Date: 2016-10-01 01:00:00.0
Title: New Mexico 300 from mile marker 0 to mile marker 6
Description: The New Mexico Department of Transportation (NMDOT) will begin pavement preservation work on NM 300 (Old Las Vegas Highway) from mile marker 0.200 to mile marker 6.200 on the northbound and southbound lanes. TRAFFIC IMPACTS: Starting Saturday, July 8-9, NM 300 will be reduced to one lane with a flagger operation from 7:00 a.m. to 8:00 p.m. On Monday July 10- 17, NM 300 will be reduced to one lane with a flagger operation from 8:30 a.m. to 8:00 p.m. This project is scheduled to be completed July 17; weather permitting. Motorists are reminded to keep a safe distance between workers and their equipment and dedicate your full attention to the roadway while driving through the work zone.
Post Date: 2016-07-07 16:20:00.0
Update Date: 2016-08-22 15:54:05.206
Expiration Date: unknown
Title: I-40 Westbound at Unser Boulevard milepost 153-154 westbound off-ramp outside right lane closed Contractor: AUI, Inc.
Description: Through August. 30, 2016 6 a.m. 3:00 p.m. Monday - Friday for construction of wall barrier. Contractor: AUI NMDOT Project Manager: Patsy Najar
Post Date: 2016-04-07 15:20:53.0
Update Date: 2016-08-11 16:45:52.0
Expiration Date: 2016-09-01 01:00:00.0
Title: New Mexico 68 northbound and southbound at mile marker 20
Description: NMDOT will begin bridge rehabilitation work at the Jct. of NM 68 & NM 75 at mile marker 20.80 north of Espanola near the Dixon turn off. The bridge rehabilitation will include concrete deck repairs, replacement of bridge joints and bridge railing. TRAFFIC IMPACTS: Starting Monday August 8th, the NM 68 northbound and southbound lanes will be reduced to one lane. There will be a flagger operation guiding traffic through the work zone from 6:00 a.m. to 8:00 p.m. Monday through Friday. Motorists can expect delays during this time. This work is scheduled to be completed end of August 2016. NMDOT thanks you for your patience during this bridge improvement project. The contractor for this project is Hasse Contracting Co. of Albuquerque, New Mexico. Drivers are urged to proceed with caution through the work zone, observe traffic control signs and reduce speed to the posted limit.
Post Date: 2016-08-04 15:54:11.0
Update Date: 2016-08-22 15:54:05.206
Expiration Date: unknown
Title: New Mexico 529 eastbound and westbound from mile marker 0 to mile marker 22
Description: Roadway Rehabilitation and Reconstruction is underway on NM 529 from MP 0.000 to MP 22.165. The Speed Limit is reduced to 55 MPH within the project's 22.165 miles. The Speed Limit is reduced within the Work Zone to 35 MPH with an 11 FOOT WIDTH RESTRICTION. Oversized and Wide Loads should seek an alternate route. This Project is 400 working days. Expected completion date is NOVEMBER 2017. Contractor: James Hamilton Construction Superintendent, James Fields 575-313-4328. NMDOT Project Manager, Donna Gililland 575-626-4857
Post Date: 2016-03-03 08:54:40.0
Update Date: 2016-08-19 07:50:30.665
Expiration Date: unknown
Title: US 82 at mile marker 16 Cloudcroft
Description: US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles! STEEP GRADES, NUMEROUS TIGHT TURNS AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route - US 62/180 or US 70. This is a permanent alert. (lc).
Post Date: 2015-10-25 15:29:32.0
Update Date: 2016-08-23 09:49:15.539
Expiration Date: unknown
Title: US 64 eastbound and westbound from mile marker 57 to mile marker 60
Description: NMDOT- Roadway reconstruction work on US 64 from mile maker 57.87 to mile marker 60.00 between Farmington and Bloomfield. TRAFFIC IMPACTS: RD 5379, RD 5367, NCM RD 5364, NCM RD 5322, RD 5290 (SJC Landfill/Aztec Cut-Across). There will be temporary delays accessing local businesses in these areas during the paving operations. there will be an 11 width restriction on the US 64 eastbound and westbound lanes. These lanes will be separated by an 11 two way left turn lane. Contractor has switch traffic to the new WBL roadway on U.S 64 Hwy on Friday, the cold milling operation is on the EBL roadway and the listed county roads above will impacted with the milling operation for the next 2 weeks. These lanes will be separated by an 11 two way left turn lane. The cold milling operation is on The EBL roadway and the listed county roads above will be impacted with the milling operation for the next 2 weeks. This project is scheduled for completion March of 2017.
Post Date: 2016-02-22 18:51:40.0
Update Date: 2016-08-22 15:54:05.206
Expiration Date: unknown
Title: Dr. Martin Luther King Jr. Ave. NE (Under I-25) from Locust St. to Cedar St. (Under I-25) Westbound right lane closure
Description: Through August 30, 2016 9 a.m. - 3 p.m. or 9 p.m. - 5 a.m. for multi transportation improvement project. Contractor: TLC Plumbing. Monday - Sunday.
Post Date: 2016-06-20 11:33:45.0
Update Date: 2016-08-11 16:45:46.0
Expiration Date: 2016-08-31 01:00:00.0
Title: US 550 at mile marker 151
Description: US 550- Mile Marker 150.85 #8243 Farmington - The contractor will be completing bridge deck grinding, replacing bridge railing and bridge deck overlays. TRAFFIC IMPACTS: NO Traffic Impacts. Bridge deck seal overlay is scheduled for mid-September. NMDOT thanks you for your patience during this bridge improvement project.
Post Date: 2016-04-18 11:04:18.0
Update Date: 2016-08-22 15:54:05.206
Expiration Date: 2016-10-01 08:00:00.0
Title: New Mexico 273 at mile marker 1
Description: The Texas Department of Transportation has closed McNutt Road at the Rio Grande in Anapra/Sunland Park until further notice due to the Loop 375 construction project. Please follow detour signs to Racetrack Drive then onto Doniphan Drive.
Post Date: Mon Nov 16 08:13:18 MST 2015
Update Date: 2016-08-23 07:01:34.852
Expiration Date: unknown
Title: US 380 northbound and southbound at mile marker 102
Description: Bridge Rehabilitation work is being preformed on US 380, (Lincoln) between mm 102 and completed by October 9, 2016. Motorists can expect a one lane closure- intermittently as work progresses. Please reduce speed and obey all posted signage, watch for personnel and equipment in the area. NMDOT Contact: Aaron Clark, Project Manager 575-648-4270; Contractor: Interstate Highway Construction, Daniel Mcfadden, 505-620-5458.
Post Date: 2016-06-13 09:58:26.0
Update Date: 2016-08-18 11:48:50.193
Expiration Date: unknown
Title: US 70 eastbound and westbound at mile marker 185
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a permanent alert.
Post Date: 2016-06-06 10:05:20.0
Update Date: 2016-08-22 08:22:03.701
Expiration Date: unknown
Title: New Mexico 182 from mile marker 0 to mile marker 2
Description: The New Mexico Department of Transportation (NMDOT) will be performing minor pavement preservation operations (Chip Sealing) on NM 182 from mile post 0 to mile post 1.2 in both lanes. Construction will begin Monday, August 22, 2016 and is expected to be completed by the end of September. Traffic will encounter a single lane drop with a flag man and pilot car operation from 7 am to 4 pm, Monday thru Friday. Motorists are advised to use caution and reduce speed while nearing and passing through the work zone being cautious of trucks turning and workers in the area. No center stripe and loose gravel.
Post Date: Fri Aug 19 08:10:00 MDT 2016
Update Date: 2016-08-23 07:01:34.852
Expiration Date: unknown
Title: Interstate 40 eastbound and westbound from mile marker 93 to mile marker 95
Description: East and Westbound I-40 is reduced to one lane from mile marker 93-95 (from east of Skyway to west of McCartys) due to roadwork. Speed reduced to 55mph. All work will be performed from 6:30am- 7pm daily. Expect minor delays. This event will be updated as conditions change.
Post Date: 2016-03-18 08:19:14.0
Update Date: 2016-08-22 08:59:03.675
Expiration Date: unknown
Title: Interstate 40 eastbound and westbound from mile marker 46 to mile marker 48 Continental Divide
Description: East and Westbound I-40 reduced to one lane from mile marker 46-48 (Continental Divide) with a 12 ft. width restriction in force, due to roadwork. Speed reduced to 55 mph through the work zone. All work will be performed from 6:30am-7pm daily. Expect minor delays. This event will be updated as conditions change.
Post Date: 2016-03-18 08:16:59.0
Update Date: 2016-08-22 08:59:03.675
Expiration Date: unknown
Title: US 84 from mile marker 236 to mile marker 246
Description: NMDOT) will begin pavement preservation work on US 84 from mile marker 236.5 to mile marker 246.5 south of Tierra Amarilla. The contractor will be placing a Hot in Place Recycled Asphalt on the roadway. Project is scheduled to be completed September 9; weather permitting. Starting Monday, August 15 September 9, the US 84 northbound and southbound lanes will be reduced to one lane from 6:30 a.m. to 7:00 p.m. Monday through Friday. There will be a flagger and pilot car operation guiding traffic through the work zone. Motorists can expect delays during this time.
Post Date: 2016-08-12 15:02:49.0
Update Date: 2016-08-22 15:54:05.206
Expiration Date: 2016-09-09 16:00:00.0
Title: Interstate 40 eastbound and westbound from mile marker 238 to mile marker 239 (McKENZIE)
Description: Clines CornersThe New Mexico Department of Transportation (NMDOT) continues bridge replacement work on I-40 from mile marker 238.00 mile marker 239.24 at the Guadalupe and Torrance County line east of Clines Corners. This project is scheduled to be completed in summer of 2016. TRAFFIC IMPACTS: The I-40 eastbound and westbound lanes will be reduced to one lane in each direction. There will be concrete barrier wall separating the eastbound and westbound lanes. There is a 12 lane width restriction.
Post Date: 2016-03-11 16:04:37.0
Update Date: 2016-08-22 15:54:05.206
Expiration Date: unknown
Title: New Mexico 14 from mile marker 51 to mile marker 52
Description: City of Santa Fe Reconstruction Project: Phase IIC of the Cerrillos Road (NM 14) Roadway Reconstruction from Camino Carlos Rey to Llano Street. Project scheduled for substantial completion in October of 2016. TRAFFIC IMPACTS:Cerrillos Road will be reduced to one-lane traffic in each direction through the intersection of St. Michaels/Osage. Left turn movements will be allowed during the lane reduction. This reduction is required to complete storm drain and waterline construction All traffic has been detoured onto the newly constructed lanes. The contractor is working on the south side of the road with removals and new waterline. The traffic will be in this configuration for the duration of the project. For additional project information please see the following links: Please continue to use caution going through the construction zone and adhere to the posted signage and speed limit of 25MPH. For additional questions on the project contact City of Santa Fe Project Engineer, David Quintana by email ddquintana@ci.santa-fe.nm.us or by phone 505-995-7762
Post Date: 2016-03-11 15:46:49.0
Update Date: 2016-08-22 15:54:05.206
Expiration Date: 2016-11-02 01:00:00.0
Title: New Mexico 6 eastbound and westbound from mile marker 18 to mile marker 23
Description: NMDOT and Mountain States Constructors, Inc. will begin roadway reconstruction on NM 6 east and westbound beginning on July 25 through November 22, 2016. NM 6 within the project zone is reduced to one lane with a flagging and pilot care operation 24 hours daily. Motorists can expect reduced speeds and delays. Project: A300420 Project Manager: Patsy Najar.
Post Date: 2016-06-10 08:50:44.0
Update Date: 2016-08-05 14:07:28.0
Expiration Date: 2016-11-24 00:00:00.0
Title: US 380 northbound and southbound from mile marker 79 to mile marker 107 Hondo
Description: NMDOT and Blue Collar Construction will begin pavement rehabilitation on US 380 between mm 79 and mm 107.6 between Capitan and Hondo on Tuesday 8/16/2016. Work is scheduled to be completed by the beginning of September, weather permitting. During the project motorists can expect delays between the hours of 7:00 am to 5:30 pm, Monday through Friday. The project will require lane closures with flagger and pilot car operations. Speed limit has been reduced to 45 mph through the work zone. Please drive safely through work zones and watch for personnel and equipment in the area. NMDOT Contact is Aaron Clark, Staff Manager 575-648-4270.
Post Date: 2016-08-05 16:22:51.0
Update Date: 2016-08-16 08:23:32.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

San Jon NM Traffic Nearby

More Local Information

Bookmark and Share

San Jon weather and traffic updates by locals

Write your own San Jon, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read the Terms of Service and the San Jon, NM report and/or forecast you are posting is in compliance with such terms. Be respectful. An inappropriate San Jon, NM report and/or forecast will be removed by a moderator.