Santa Rosa, NM Traffic and Road Conditions

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Santa Rosa Traffic Alerts

Title: NM 120 eastbound and westbound from mile marker 74 to mile marker 75 Roy.
Description: Alert - ( Roy) Utility work April 18 through May 23. Hour of operation 7:00 a.m. to 4:30 p.m. Please adhere to all traffic control in area.
Post Date: 2018-04-18 08:27:02.0
Update Date: 2018-04-18 08:27:02.0
Expiration Date: Wed May 23 16:30:00 MDT 2018
Title: US 380 at mile marker 43
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. THIS IS A PERMANENT ALERT.
Post Date: 2017-05-17 14:04:16.0
Update Date: 2018-04-23 08:40:28.852
Expiration Date: unknown
Title: New Mexico 498 at mile marker 0
Description: Hasse Contracting Co., Inc. (Contractor) will begin bridge replacement and roadway reconstruction. NM 498 will be closed during construction. All traffic will be detoured to Sunland Park Drive, Futurity Drive and NM 273 (McNutt Road). Hours of operation will be from 7:00 am to 5:00 pm Monday to Friday. Construction is scheduled to be completed by summer 2018.
Post Date: 2017-10-31 07:53:39.0
Update Date: 2018-04-04 08:42:47.341
Expiration Date: unknown
Title: New Mexico 524 at mile marker 7
Description: The Intersection of Standpipe Road and NM 524 (Lea Street) in Carlsbad is CLOSED for construction at the intersection. There will be limited access to the road in this location. Business access will be maintained at all times. A Detour is in place and Motorists are asked to reduce speed and follow all posted construction and detour signs. Please watch for construction personnel and equipment at this location. Completion is expected in the Fall 2018. Contact: J & H Services Inc. 505-896-9428
Post Date: 2018-02-20 10:36:26.0
Update Date: 2018-04-23 08:40:28.852
Expiration Date: unknown
Title: New Mexico 30 at mile marker 6
Description: NMDOT Roadway Reconstruction from milepost 7.150 to milepost 7.610 in the Pueblo of Santa Clara. TRAFFIC IMPACTS: On February 19, 2018, the contractor will resume work on NM 30 in the Pueblo of Santa Clara. NM 30 will have one lane of travel in each direction at all times. The speed limit is reduced to 25 mph in the work zone. All side streets to the west side of the Santa Clara Pueblo, with the exception of Dawn Road will be OPENED to Santa Clara Pueblo local traffic. Motorists are advised to watch for heavy truck traffic turning in and out of the work zone. Motorist can use US 84/285 to NM 502 as an alternate route to commute to and from Los Alamos On December 13, 2017, traffic will be shifted onto the newly built northbound lanes of NM 30. NM 30 will have one lane of travel in each direction at all times. All side streets to the west side of the Santa Clara Pueblo, with the exception of Dawn Road will be OPENED to Santa Clara Pueblo local traffic. The west side of Santa Clara Pueblo will access NM 30 through Obsidian Road. Motorists are advised to watch for heavy truck traffic turning in and out of the work zone. Motorist can use US 84/285 to NM 502 as an alternate route to commute to and from Los Alamos. This project is scheduled to be completed December 2017; weather permitting.
Post Date: 2017-04-11 14:33:23.0
Update Date: 2018-02-22 14:37:25.0
Expiration Date: unknown
Title: New Mexico 45 northbound and southbound from mile marker 9 to mile marker 10
Description: Through April 24th, 2018 NM 45 (Coors Blvd)northbound & southbound at Blake Intersection will have various continual lane and shoulder restrictions from 7 A.M. to 5 P.M. the following day for utility and infrastructure improvements.
Post Date: 2018-01-11 09:24:20.0
Update Date: 2018-02-22 14:35:02.0
Expiration Date: 2018-04-30 03:37:00.0
Title: New Mexico 41 from mile marker 46 to mile marker 55
Description: Roadwork - NM 41 Clark Hill to Galisteo - Starting Monday March 26 - NM 41 will be reduced to one lane with a pilot car operation guiding traffic through the work zone. The pilot car will be in full operation 24 hours a day / seven days a week. Motorists can expect delays during this time. This project is scheduled to be completed November of 2018; weather permitting.
Post Date: 2017-11-09 08:44:22.0
Update Date: 2018-03-26 15:29:04.0
Expiration Date: unknown
Title: Interstate 40 eastbound and westbound at mile marker 79 (NM 605/MILAN)
Description: East and westbound I-40 at mile marker 79 (Milan) will be reduced to one lane in each direction beginning August 1, 2017 due to bridge work. Speed will be reduced to 55mph through the work zone. All work will be performed weekdays from 7am to 5:30pm. This project is expected to be complete in February, 2018.
Post Date: 2017-08-03 15:13:15.0
Update Date: 2018-04-23 08:25:33.425
Expiration Date: unknown
Title: US 82 at mile marker 16 Cloudcroft
Description: US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles! STEEP GRADES, NUMEROUS TIGHT TURNS AND ONE TUNNEL. Trucks without retarder brakes and/or longer than 65 feet in length are PROHIBITED on this section of US 82. Consider using an alternate route - US 62/180 or US 70. THIS IS A PERMANENT ALERT. (lc).
Post Date: 2015-10-25 15:29:32.0
Update Date: 2018-04-23 08:40:28.852
Expiration Date: unknown
Title: New Mexico 124 eastbound and westbound from mile marker 0 to mile marker 8
Description: CMV's and other high profile vehilces are PROHIBITED on NM 124 from mile marker 0-8 (from Exit 96 at McCartys to Exit 89 at Skyway) due to low 13' clearance of concrete box culvert and no turn-around space. This event will be updated as conditions change.
Post Date: 2017-03-25 21:55:09.0
Update Date: 2018-04-23 08:25:33.425
Expiration Date: unknown
Title: New Mexico 478 northbound and southbound at mile marker 8 Vado
Description: Smith & Aguirre Construction (Contractor) will be replacing and repairing sewer/manhole covers. Roadway is CLOSED at this time with a detour in place on NM 226 (W Berino Rd) and NM 189. Hours of operation will be from 7:00 am to 5:00 pm Monday to Friday. Construction is scheduled to be completed by April 23rd.
Post Date: Mon Feb 26 07:47:36 MST 2018
Update Date: 2018-04-23 10:44:58.436
Expiration Date: Tue Apr 24 00:00:00 MDT 2018
Title: I 40 at mile marker 163 (Louisiana).
Description: Alert---Through April 25 from 10 PM to 5:30 AM Louisiana NB to I-40 westbound on ramp will be closed.--- Through May 5th from 9 P.M. to 5:30 A.M I-40 westbound on and off ramps to and from Louisiana Boulevard will have various lane restrictions. Nightly closures of the I-40 westbound off ramp will be in effect from 10 P.M. to 5:30 A.M through April 13th. Work is being performed for Interchange maintenance. Expect delays
Post Date: Mon Apr 23 09:23:51 MDT 2018
Update Date: 2018-04-23 09:23:45.0
Expiration Date: Tue May 15 04:26:00 MDT 2018
Title: US 60 from mile marker 236 to mile marker 238
Description: US 60- Encino - NMDOT Maintenance crews will be paving in the Encino area. There will be one lane closures Monday April 23 thru April 25th. Drivers are advised to watch for workers in the area, reduce speed and obey traffic control signing.
Post Date: 2018-04-23 08:46:50.0
Update Date: 2018-04-23 08:46:50.0
Expiration Date: unknown
Title: New Mexico 18 northbound from mile marker 7 to mile marker 9 Jal, right lane closed.
Description: Motorists please be advised that the Northbound right lane of NM 18 from mm 7.7 to mm 8.5 (Jal) will be CLOSED as contractors replace water lines. Please use caution, reduce speed and watch for all personnel and equipment in the area.
Post Date: 2018-01-22 10:14:16.0
Update Date: 2018-04-23 08:40:28.852
Expiration Date: unknown
Title: US 70 at mile marker 184
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: 2016-06-06 10:05:20.0
Update Date: 2018-04-23 08:40:28.852
Expiration Date: unknown
Title: Interstate 25 southbound from mile marker 112 to mile marker 115 (NM 107/MAGDALENA)
Description: The New Mexico Department of Transportation will have maintainers on the roadway, I-25 southbound at mile post 112-115 (NM 107/MAGDALENA) the driving right lane will be closed due to road repair. This closure is expected Monday through Friday from 9:00 am to 3:00 pm.
Post Date: Mon Apr 02 07:55:57 MDT 2018
Update Date: 2018-04-23 10:50:00.0
Expiration Date: unknown
Title: US 380 at mile marker 107 Hondo
Description: Trucks over 65 foot are prohibited on US 380 between Hondo and Carrizozo. This is a PERMANENT ALERT.
Post Date: 2017-02-17 08:17:49.0
Update Date: 2018-04-23 08:40:28.852
Expiration Date: unknown
Title: New Mexico 117 northbound and southbound from mile marker 33 to mile marker 39
Description: NM 117 reduced to one lane in both directions from mile marker 33-39 (La Ventana) due to roadwork. Traffic signals and a pilot car will guide traffic through the work zone. Expect minor delays. Work hours are Monday through Friday from 7am - 5pm, with work tentatively ending at the end of May, 2018. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2018-03-09 11:34:48.0
Update Date: 2018-04-23 08:25:33.425
Expiration Date: 2018-06-01 00:00:00.0
For official NM traffic info visit: New Mexico DOT Traffic Site

Traffic Nearby

More Local Information

Bookmark and Share

Santa Rosa weather and traffic updates by locals

Write your own Santa Rosa, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read the Terms of Service and the Santa Rosa, NM report and/or forecast you are posting is in compliance with such terms. Be respectful. An inappropriate Santa Rosa, NM report and/or forecast will be removed by a moderator.