Home / Local Weather & Traffic / New Mexico / Espanola

Espanola Traffic and Road Conditions

 
Map and Alert Controls, Usage Tips, and FAQs: Expand
All Traffic Data Provided by NMDOT. Click the icons on the map to see info.
Map Icon Controls
  • | NOTE: only viewable at higher elevation zoom "-" levels
Tips
  1. Click and hold the map with your mouse to move in different directions.
  2. If you do not see any markers on the map, try zooming in one or two levels using "+" on the top left side.
  3. Click an incident icon on the map to get more information.
FAQs
Q) How often is the map updated?
A) The traffic flow is updated at loadtime and upon movement outside the initial map view, or upon refresh of the page. Any incident markers are checked for updates approximately every 5-10 minutes, but you need to reload the page to load any new updates; the data provided may still be the same status/view as before. Information shown is as only reliable as how it is reported to us.

Q) The roads are backed up or closed, but the map does not show the reason why, what's the deal?
A) Municipal traffic monitors or GPS trackers may not be available, could be offline, or reports and alerts are not syndicated to media outside of the area to use on the map. This is especially true for rural areas. You are encouraged to leave a road conditions report to help others.

Q) I see traffic alerts in the box below for the state, but they aren't related to the area I'm in?
A) We attempt to display alerts as specific to the area as possible, however in some cases the data we receive will only allow us to provide it by county or even statewide.

Q) Are you an official source of traffic information?
A) We are not an official source of traffic or real-time data. We have contracts and licenses to display certain up-to-date information that comes direct from some DOTs in various states, and the traffic flow on the maps is provided by Google or MapQuest. However, the data shown here should only be used for light informational and reference purposes and not to make critical decisions. Your safest option on the web is to use your state-run traffic website, or to call the DOT traffic line for your state, local authorities, or the state's 511 number if available.

Warning! Do not attempt to use any of these features while driving a vehicle.
Espanola Traffic Alerts
Title: US 64, 14.5 miles South of Dulce at mile marker 124, -lane- lane closed.
Description: Dulce - Jct of US64 & NM537 - This project is 11 miles south of Dulce. Federal Highways Administration is building a new by-pass road between US 64 and NM 537. There will also be Intersection improvement work the Intersection of US64 & NM 537. This project is anticipated to be completed by August 2014. On July 7, 2014, motorists can expect shoulder work, trucks turning and median work. In addition NM 537 will temprarily becombe a dirt/aggregate roadway. NM 527 is expected to be paved within 6-8 days. Traffic Impacts: Motorists can expect minor delays Monday through Friday. Traffic has been shifted to the shoulder. Traffic is traveling in one lane with a flagger operation. Drivers are urged to reduce speed, watch for construction personnel and observe temporary construction signing.
Post Date: 2014-06-25 11:12:06.417
Update Date: 2014-07-01 14:42:06.54
Expiration Date: unknown
Title: US 70 eastbound and westbound, 24.5 miles South of Holloman AFB at mile marker 185
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a permanent alert and will not be updated regularly. (dm)
Post Date: 2014-05-21 12:47:23.523
Update Date: 2014-06-17 08:17:17.403
Expiration Date: unknown
Title: Interstate 25 northbound and southbound, 2 miles West of LA CIENEGA exit at mile marker 270
Description: I-25 Bonanza Creek Bridge - Contrac tor will be completing night work. Motorists can expect one lane closure northbound and southbound on I-35. from 8:00 p.m. 2:00 .a.m.. Project scheduled to be completed September, 2014.
Post Date: 2014-08-20 21:54:08.42
Update Date: 2014-09-02 11:05:32.897
Expiration Date: unknown
Title: US 550 northbound and southbound at mile marker 53
Description: Bridge work on US 550, mile marker 53 (just south of Cuba) will have a 10' width restriction with concrete wall barrier in place. Work will begin on 3/19/14 until the project is complete. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2014-03-19 10:04:20.213
Update Date: 2014-09-19 15:55:10.753
Expiration Date: unknown
Title: US 285 from mile marker 248 to mile marker 250
Description: The New Mexico Department of Transportation (NMDOT) began work on the U.S. 285/ I-40 interchange at Clines Corners on September 2, 2014. This improvement work includes the lengthening and realignment of the westbound exit ramp, the realignment of the westbound entrance ramp, and the lengthening of the eastbound on and off ramps on I-40. The U.S. 285 bridge over I-40 will be widened 24 feet to accommodate two lanes of traffic each way. The work on U.S. 285 from mile marker 248.84 to mile marker 250.46 includes the reconstruction and widening of the existing lanes to accommodate two lanes of traffic each way. Other work on the project includes new drainage structures, new curb and gutter, new signing and the installation of an intelligent transportation system. Traffic Impacts: Motorists can expect minor delays due to a flagging operation on U.S. 285 at mile marker 249, Monday through Friday from 7:00 a.m. to 5:00 p.m. There will be intermittent lane closures on I-40 eastbound and westbound lanes at Clines Corners. Drivers are urged to proceed with caution through the work zone, observe traffic control signs and reduce speed to the posted limit.
Post Date: 2014-09-17 15:07:34.173
Update Date: 2014-09-17 15:07:34.173
Expiration Date: unknown
Title: New Mexico 88 eastbound and westbound at mile marker 1
Description: Road construction is on NM 88, mile post 0.000 to mile post 1.100, Start July 7, 2014. Lane Closures, NMDOT urges motorists to proceed through the work zone with caution, watch for construction personnel, observe traffic control signing, and reduced speed to the posted speed limit. Expected completion is September 2014. Emergency Contacts: NMDOT Project Manager Pat Garcia, 575-626-9889. Lee Montoya Asst. Supervisor 575-840-7491. Contractor Constructors Inc. Angel Vega Superintendent, 575-706-7310, JohnGuldemann, 505-397-4102
Post Date: 2014-07-16 07:50:23.787
Update Date: 2014-09-17 10:34:57.13
Expiration Date: unknown
Title: US 70 northbound and southbound and eastbound and westbound from mile marker 178 to mile marker 328
Description: Highway Supply will be replacing existing signs with new ones. This work will be taking place on the shoulders on US 70 from MM 178 to MM 328. Contractor will be work M-F 7am-5pm This work should not impact the traveling public .Motorists should watch for equipment and personnel in the workzone and adhere to all construction signage. If you have questions or concerns please contact one of the following: Jerry Hickman NMDOT Project Manager 575-585-2090 or Mike Tafoya Highway Supply Project Manger 505-975-7866.
Post Date: 2014-08-13 12:04:27.337
Update Date: 2014-08-13 12:06:57.49
Expiration Date: unknown
Title: US 285 northbound and southbound at mile marker 35
Description: The NMDOT is doing bridge deck rehabilitation work on the Dark Canyon Bridge on US 285 at MP 35 in Carlsbad. Work will consist of milling and grinding the existing bridge deck and placement of a new concrete overlay on the decks. The project is currently under suspension and all four lanes are open to traffic. Work is expected to resume on September 26, 2014 For more information contact NMDOT Project Manager Nathan Palomarez (575)626-4278 or Hasse Contracting Superintendent Christian Hasse (505)400-2336.
Post Date: 2014-04-02 08:21:46.447
Update Date: 2014-09-18 07:45:37.247
Expiration Date: unknown
Title: US 84, 2.9 miles North of S.Tesuque CR 173 at mile marker 173
Description: US 84 - NMDOT conducting bridge rehabilitation night work at the Tesuque Pueblo Bridge near JR Clothing. Motorists can expect minor delays and lane closures between 7:00 p.m. and 6:00 a.m. Project to be completed by August 29, 2014.
Post Date: 2014-08-19 15:55:35.687
Update Date: 2014-08-19 15:55:35.687
Expiration Date: unknown
Title: US 70 northbound and southbound at Portales at mile marker 421
Description: Road construction is on US 70, mile post 421.60 to mile post 423.330, Start March 31, 2014. Lane Closures, Width restriction 12'. NMDOT urges motorists to proceed through the work zone with caution, watch for construction personnel, observe traffic control signing, and reduced speed to the posted speed limit. Expected completion is September 2014. Emergency Contacts: NMDOT Project Manager Pat Garcia, 575-626-9889. Lee Montoya Asst. Supervisor 575-840-7491. Contractor Constructors Inc. Angel Vega Superintendent, 575-706-7310, JohnGuldemann, 505-397-4102
Post Date: 2012-05-15 13:49:09.63
Update Date: 2014-09-17 10:34:52.653
Expiration Date: unknown
Title: New Mexico 136 from at mile marker 1 to at mile marker 3
Description: NM 136 Pete Domenici Hwy is experiencing high volumes of traffic during the morning hours at the Santa Teresa Port of Entry. Please expect delays should you be crossing the border with intentions of export vehicles from the US. All proper documentation must be presented when entering the port.
Post Date: Tue Jul 15 07:37:02 MDT 2014
Update Date: 2014-09-21 07:37:50.229
Expiration Date: unknown
Title: New Mexico 245 northbound and southbound at mile marker 0
Description: Signalization Construction on NM 245 on the intersection of North Thornton and IIano Estacado is completed. Road has been opened to motorists. Stripping is scheduled for September 5, 2014. Motorists should observe the posted speed limit. Emergency Contacts: NMDOT Project Manager Pat Garcia, 575-626-9889. Lee Montoya Asst. Supervisor 575-840-7491.
Post Date: 2014-06-10 13:57:06.637
Update Date: 2014-09-17 10:33:21.827
Expiration Date: unknown
Title: Interstate 25 northbound and southbound from 1.2 miles West of CANONCITO exit at mile marker 293 to 0.1 miles West of CANONCITO exit at mile marker 294
Description: Santa Fe – The New Mexico Department of Transportation (NMDOT) began bridge replacement work on I-25 north of Santa Fe at Canoncito between mile markers 293 and 294 on April 7, 2014. The scope of the project includes bridge rehabilitation, roadway and ramp reconstruction, and pavement rehabilitation for 1.42 miles within Santa Fe County. Tom Griego is the NMDOT Project Engineer. AUI is the contractor for this project. Traffic Impacts: Starting May 21, the cross road under I-25 (Sleeping Dog Road) will be CLOSED. Local traffic and residents on the south side of I-25 will be detoured to the Valencia Exit 297 to access I-25 South. Local traffic and residents on the north side of I-25 (Old Las Vegas Highway) will be detoured to the Lamy Exit 290 to access I-25 northbound and southbound. The Sleeping Dog Road closure will be in effect until November 2014. -I-25 southbound traffic will be switched over to the northbound lanes. The northbound and southbound lanes will be reduced to one lane through the work zone. The lane closures will be in effect through June, 2014. -Motorists can expect minor delays. The posted speed limit is 55 mph through the work zone. There is a 12 foot width restriction in effect. NMDOT urges motorists to proceed through the work zone with caution, watch for construction personnel, observe traffic control signing and reduced speed to the posted speed limit.
Post Date: 2014-04-08 16:37:30.577
Update Date: 2014-08-26 11:54:54.753
Expiration Date: unknown
Title: New Mexico 344 northbound and southbound from 1.7 miles North of at mile marker 1 to 1.7 miles South of at mile marker 16
Description: NM 344 - - Starting September 2 NMDOT maintenance crews will be completing chipseal operations. Motorists can expect minor delays Monday - Friday from 9:00 a.m. to 3:00 p.m. There will be a single lane closure and there will be a flagger and pilot car escort. Motorists are urged to watch for construction personnel in the work zone, reduce speed to the posted speed limits and observe temporary construction signing.
Post Date: 2014-08-28 10:34:29.417
Update Date: 2014-08-28 10:34:29.417
Expiration Date: unknown
Title: US 82 eastbound and westbound from mile marker 175 to mile marker 191
Description: The project consists of Roadway Rehabilitation, Processing, Placing and Compacting Existing Pavement, Shoulder Work and Permanent Signing. Construction will begin July 24, 2014. The project is for 320 Calendar Days ending in June 2015. There will be one lane closure throughout the project with pilot car operation thru the work zones. There is an 11' width restriction. Please adhere to the Construction Signing and watch out for workers. Traffic will be slowed down to 45 MPH and 35MPH throughout the work zones. Double Fines will be enforced. Fisher Sand and Gravel Superintendent, Jimmy Taylor 775-229-9506. NMDOT Project Manager, Donna Gililland 575-626-4857.
Post Date: 2014-07-24 08:47:30.853
Update Date: 2014-09-18 15:08:56.607
Expiration Date: unknown
Title: US 380 at mile marker 49
Description: Saturday, September 20, 2014, Highway 380 is scheduled to be blocked 2 times. The first block will be set at 12:00pm for approximately 2 hours and should be lifted by 2:00pm. The second block will be set at 2:15pm for approximately 2 hours and should be lifted by 4:15pm. This block will affect Hwy 380 in the northern portion of the range at Gold block (mile marker 3) and Silver block (mile marker 49).
Post Date: 2014-09-18 11:50:47.687
Update Date: 2014-09-18 11:50:47.687
Expiration Date: unknown
Title: US 70 from mile marker 251 to mile marker 256
Description: US 70, MM 251 to MM 256 will have the driving lane closed while workers do milling on the roadway. Speed limit is still reduced to 35 mph. Obey all signage on the roadway and watch for workers and large machinery.
Post Date: 2014-09-18 11:48:57.53
Update Date: 2014-09-18 11:48:57.53
Expiration Date: unknown
Title: New Mexico 244 from mile marker 15 to mile marker 17
Description: NMDOT crews will be sweeping on NM 244 from mm 17 to mm 15 both lanes. One lane will be closes at a time and there will be pilot car operations. Motorists should watch for personnel and equipment in the area and obey all posted signage. Richard Marquez, NMDOT Supv. 575-840-9796
Post Date: 2014-09-18 08:24:26.52
Update Date: 2014-09-18 08:24:26.52
Expiration Date: unknown
Title: US 70 from mile marker 329 to mile marker 336
Description: Road Construction tenitively set to resume between the US 70 intersections of 2nd Street (Roswell Relief Route) and the US 70 overpass with North Main Street. on Thursday September 16th or as roadway surfaces dry. Hours will be 6:00 am to 7:00 pm, M-F. Work is anticipated to complete by September 26, 2014. A Maximum width restriction of 10' will be in place for West & Southbound Overpass ramps only. Motorist should expect a one lane closure, pilot car / flagging operations with short delays. Please watch for personnel, equipment and obey all posted construction signs. NMDOT Contact: Gabriel Ortega, PM - 575-626-2899 or Willie McCray CETS - 575-626-7294. Contractor Brasier Superintendent Art Aguirre - 915-497-7686.
Post Date: 2014-08-14 08:16:29.04
Update Date: 2014-09-17 08:40:15.33
Expiration Date: unknown
Title: US 54 northbound and southbound from 6.7 miles South of Coyote at mile marker 130 to 1.2 miles West of Ancho at mile marker 146
Description: New roadway construction is underway. The Contractor will be working Monday through Saturday from 6:30 am to 6:30 pm. Motorists should watch for equipment and personnel in the workzone and adhere to all construction signage. Possible one lane closures up to 30 minutes during construction activities. Estimated completion is Spring of 2015. Contacts: Aaron Clark , NMDOT Project Manager- 575-648-4270, Richard Montoya FNF Project Manager480-318-5755.
Post Date: 2014-02-13 08:39:25.037
Update Date: 2014-09-11 16:20:30.407
Expiration Date: unknown
Title: Interstate 25 northbound and southbound, 0.3 miles South of SPRINGER SOUTH exit at mile marker 412
Description: I-25, Roadwork at Exit 412 MP .0690 to MP 0.973 (Springer), Bridge Replacement. Please drive with caution, obey the speed limit and other traffic control signing. Exit 412 is closed please be aware of detour.
Post Date: 2014-06-12 08:40:39.41
Update Date: 2014-07-23 13:42:29.027
Expiration Date: unknown
Title: Interstate 25 northbound and southbound from 1.5 miles South of AIRPORT exit at mile marker 351 to 1.8 miles East of AIRPORT exit at mile marker 353
Description: I-25, Roadwork from MP 351.669 to MP 352.790 (3 miles North of Las Vegas), Bridge Replacement. Please drive with caution, obey the speed limit and other traffic control signing. Both North Bound and South Bound are down to one lane as Construction is going on.
Post Date: 2014-06-12 08:01:26.103
Update Date: 2014-07-10 09:46:03.31
Expiration Date: unknown
Title: US 54 northbound and southbound from mile marker 154 to mile marker 162
Description: Roadway reconstruction is underway. The Contractor will be working Monday through Friday from 6:30 am to 6:30 pm. Motorists should watch for equipment and personnel in the workzone and adhere to all construction signage. One lane closures up to 15 minutes during construction activities. Estimated completion is Winter of 2014. Contacts: Aaron Clark , NMDOT Project Manager- 575-648-4270, Doug Cutler Cutler Repaving 785-843-1524
Post Date: 2014-09-11 16:38:16.597
Update Date: 2014-09-11 16:40:19.137
Expiration Date: unknown
Title: US 54 northbound and southbound from 35.4 miles NorthTularosa at mile marker 94 to 19.6 miles SouthCarrizozo at mile marker 107
Description: New roadway construction is underway. The Contractor will be working Monday through Friday from 6:30 am to 6:30 pm. A WIDTH RESTRICTION of 12 feet is in place and wide loads should use an alternative route. Motorists should watch for equipment and personnel in the workzone and adhere to all construction signage. Traffic may be reduced to one lane with pilot car at random times throughout the work day. Speed limits have been reduced to 45 MPH between MP 94 to MP 103. Estimated completion is Spring of 2014. Contacts: Jerry Hickman, NMDOT Project Manager- 575-585-2090 or 575-626-0804, Jim Hemm, FNF Superintendent- 602-989-4735, Contractor.
Post Date: 2010-12-09 09:35:18.247
Update Date: 2014-06-26 14:19:10.377
Expiration Date: unknown
Title: US 380 at mile marker 52
Description: White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road or roads will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a permanent alert and will not be updated regularly. (dm)
Post Date: 2014-02-06 13:26:11.203
Update Date: 2014-09-05 15:19:28.6
Expiration Date: unknown
Title: New Mexico 244 eastbound and westbound from mile marker 0 to mile marker 29
Description: Project went in to full suspension starting June 9,2014 until further notice. New signage project. The Contractor will be working Monday through Friday from 8:00 am to 5:00 pm. Motorists should watch for equipment and personnel in the workzone and adhere to all construction signage. Traffic may be reduced to one lane with pilot car at random times throughout the work day. Expect delays up to 15 minutes. Contacts: Jerry Hickman, NMDOT Project Manager- 575-585-2090 or 575-626-0804, Vince DeMenno, Superintendent- 505-280-9039, Contractor.
Post Date: 2014-04-03 09:18:08.647
Update Date: 2014-06-18 08:27:08.167
Expiration Date: unknown
Title: New Mexico 248 from Eunice at mile marker 0 to 13.1 miles North of Eunice at mile marker 6
Description: NM248 is closed due to high water crossing the road.Please seek an alternate route.This event will be updated as conditions change. JRF
Post Date: 2014-09-21 08:04:32.054
Update Date: 2014-09-21 08:04:32.054
Expiration Date: unknown
Title: Interstate 25 northbound and southbound from mile marker 79 to mile marker 93
Description: The NMDOT with Mountain States Construction are currently working in the southbound shoulder of I-25. The north and southbound lanes have restrictions at 13.5 width and speed limit reduced as traffic is switching from driving lane to passing lane at the pass. Please proceed with caution.
Post Date: 2014-06-30 09:35:05.647
Update Date: 2014-09-19 07:00:39.137
Expiration Date: unknown
Title: New Mexico 549 from 9.9 miles East of Akela at mile marker 23 to 14.3 miles East of Akela at mile marker 25
Description: A portion of NM 549 is CLOSED due to roadway construction. The NMDOT has posted detours and traffic control alerting motorists of this workzone. Please proceed with caution.
Post Date: Mon Aug 25 11:39:15 MDT 2014
Update Date: 2014-09-19 15:18:39.778
Expiration Date: unknown
Title: US 82 at Cloudcroft
Description: US 82 between Cloudcroft and Alamogordo descends 5,000 feet in 16 miles! Steep grades, numerous tight turns and one tunnel! Trucks without retarder brakes and/or longer than 65 feet in length PROHIBITED on this section of US 82. Consider using an alternative route – US 62/180 or US70 This is a permanent alert. (dm)
Post Date: 2012-08-20 08:38:52.783
Update Date: 2012-12-10 09:53:39.94
Expiration Date: unknown
Title: New Mexico 51, 11.8 miles East of Elephant Butte at mile marker 10
Description: NMDOT with Meridian continue to work on a portion of NM 51 to improve the drainage channel by Ash Canyon. Motorists may encounter minor delays and are encouraged to proceed with caution.
Post Date: 2014-04-07 09:20:47.817
Update Date: 2014-09-19 07:00:42.697
Expiration Date: unknown
Title: Interstate 40 eastbound and westbound from mile marker 17 to mile marker 22
Description: Roadwork on I-40, mile marker 17-22 (from Munoz Interchange to West Gallup Interchange). All work will be performed Monday-Friday from 6:30am to 7:00pm. I-40 will be reduced to one lane beginning on westbound lanes, then eastbound lanes. Speed reduced in work zone. Please drive with caution, reduce speed and obey all posted traffic signs, This event will be updated as conditions change.
Post Date: 2014-04-07 08:37:34.883
Update Date: 2014-09-19 15:55:10.753
Expiration Date: unknown
Title: US 82 eastbound and westbound from mile marker 0 to mile marker 16
Description: Project went in to full suspension starting June 9,2014 until further notice. New signage project. The Contractor will be working Monday through Friday from 8:00 am to 5:00 pm. Motorists should watch for equipment and personnel in the workzone and adhere to all construction signage. Traffic may be reduced to one lane with pilot car at random times throughout the work day. Expect delays up to 15 minutes. Run away truck ramp at MM 5 will be closed for repairs for the next 3 weeks. Contacts: Jerry Hickman, NMDOT Project Manager- 575-585-2090 or 575-626-0804, Vince DeMenno, Superintendent- 505-280-9039, Contractor.
Post Date: 2013-09-27 15:31:46.81
Update Date: 2014-06-18 08:26:52.267
Expiration Date: unknown
Title: US 70 eastbound and westbound from LAS CRUCES CLOVERLEAF US 70 exit at mile marker 150 to mile marker 152
Description: The NMDOT with Smith and Aguirre Construction has traffic control at the I-25/US 70 Interchange to just east of the Rinconada (exit 152). The contractor is placing concrete wall barrier structure. The contractor will be working within the inner lane as motorists will continue to have 2 lanes of open traffic for both directions. The project working hours will be Monday to Friday from 7 a.m. until 5 p.m. until completion late September of 2014.
Post Date: Fri May 23 11:37:13 MDT 2014
Update Date: 2014-09-19 15:18:19.955
Expiration Date: unknown
Title: Interstate 25, 3 miles North of US 285 exit at mile marker 288
Description: I-25 - Seaton Village- 10 TON WEIGHT LIMIT - There is a 10 ton weight limit restriction onver the bridge . Motorists are advised to observe weight limit restriction. This event will be in effect until further notice.
Post Date: 2014-08-22 19:02:26.383
Update Date: 2014-08-22 19:03:55.17
Expiration Date: unknown
Title: Interstate 25 northbound and southbound from 5.8 miles East of NM 107/MAGDALENA exit at mile marker 118 to 8.5 miles North of NM 107/MAGDALENA exit at mile marker 119
Description: The NMDOT with Fisher Construction will continue with their mill and inlay paving operations where traffic will encounter lane and speed restrictions. The contractor should be complete with this process by Monday August 25th.
Post Date: Fri Aug 22 15:25:35 MDT 2014
Update Date: 2014-09-19 15:15:04.565
Expiration Date: unknown
Title: US 62 at mile marker 9
Description: US 62,MM 9, South of Carlsbad, Post Signs advising travelling public that county roads are covered with water due to heavy rain. Use extreme caution as road may be washed out. This will be updated as conditions change.
Post Date: 2014-09-19 02:42:05.237
Update Date: 2014-09-19 02:42:05.237
Expiration Date: unknown
Title: New Mexico 41 from 1.6 miles South of Galisteo at mile marker 55 to 0.5 miles South of Galisteo at mile marker 56
Description: The New Mexico Department of Transportation (NMDOT) construction work on NM 41 near the Village of Galisteo between mile post 55.53 and mile post 56.1 on April 21, 2014. This work will include the replacement of two bridges and roadway improvements between the two bridges. The bridge work will be located at the San Cristobal Arroyo Bridge south of the Village of Galisteo and the Galisteo Creek Bridge on the southern edge of the Village of Galisteo. Traffic Impacts: Motorists can expect minor delays. During the daylight hours, the northbound and southbound traffic will travel through one lane with a pilot car operation and temporary signal setup. During the night, there will be a temporary signal set up on the north end and south end of the work zone. -NO oversize vehicles or commercial loads are allowed through the work zone, and NO oversize loads allowed between Stanley and South of County Road 42. There is a 10’ width restriction. -Motorists traveling south on NM 41 can use U.S. 285 south to Clines Corners to I-40. Motorists traveling north on NM 41 can use I-40 east to Clines Corners to U.S. 285 north. The detours are equivalent to approximately 21 miles. Drivers are urged to proceed through the work zone with caution, observe traffic control signs and obey speed limits.
Post Date: 2014-06-13 10:35:58.587
Update Date: 2014-06-13 10:35:58.587
Expiration Date: unknown
Title: US 285 northbound and southbound, 2 miles West of Lamy at mile marker 284
Description: Santa Fe–The New Mexico Department of Transportation (NMDOT) continues bridge rehabilitation work on U.S. 285 near Lamy just North of NM 41 at mile post 284.1 Traffic Impacts: The U.S. 285 the northbound and southbound lanes will be reduced to one lane. Motorists can expect minor delays. There will be a flagger and pilot car operation. This bridge rehabilitation project is scheduled for completion September of 2014. Drivers are urged to proceed through the work zone with caution, observe traffic control signs and obey speed limits.
Post Date: 2014-07-11 12:06:05.637
Update Date: 2014-08-28 10:05:36.637
Expiration Date: unknown
Title: Interstate 40 eastbound from mile marker 47 to mile marker 50
Description: Rough road on eastbound I-40, mile marker 47-50 (Continental Divide area). Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2014-06-06 20:34:13.027
Update Date: 2014-09-19 15:55:10.753
Expiration Date: unknown


For official NM traffic info visit: New Mexico DOT Traffic Site

Espanola Current Weather | Espanola 5-Day Forecast | Espanola Hourly Forecast | Espanola Time & Date

Espanola weather and traffic updates by locals

Are you in Espanola? Write your own Espanola, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read the Terms of Service and the Espanola, New Mexico report and/or forecast you are posting is in compliance with such terms. Be respectful. An inappropriate Espanola, New Mexico report and/or forecast will be removed by a moderator.
 
Top Road Conditions
Espanola Road Conditions
Espanola traffic updates, highway and road conditions with live interactive map including flow, delays, accidents, construction, closures and driving conditions for the Espanola area and Santa Fe county.