Cloudcroft Traffic and Road Conditions

Cloudcroft Traffic Map

No Traffic Flow? Zoom in Closer

How to use the Cloudcroft Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic or no traffic*. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

* In known extreme weather events or accidents, the map provider may still show green lines, even if lanes or the entire road is closed.

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Cloudcroft Traffic Alerts

Title: Lane Closure, NM 273 at mile marker 2, Sunland Park.
Description: Lane Closure~~~The New Mexico Department of Transportation (NMDOT) will be performing roadway repairs on NM 273 “McNutt Road” at milepost 2. The driving right lane is expected to be closed through August 2022. Motorists are asked to reduce speed, obey posted signs, and be cautious of personnel and equipment in the area.
Post Date: 2021-12-29 13:52:36.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 43, 17 miles east of Gallup to mile marker 45, Coolidge.
Description: Roadwork~~~Eastbound I-40 is reduced to one lane from mile marker 43-44 (Coolidge) due to roadwork. Eastbound traffic is being diverted onto the westbound median shoulder. Westbound has 2 lanes open. Speed reduced to 55mph through the work zone. All work will be performed weekdays from 7am-6pm. Please drive with caution, reduce speed and obey all posted traffic signs. WATCH FOR SLOW MOVING OR STOPPED TRAFFIC. USE BOTH LANES AND TAKE TURNS MERGING AT CONSTRUCTION ZONE. This event will be updated as conditions change.
Post Date: 2022-05-18 16:09:22.0
Update Date: 2022-06-02 09:28:55.0
Expiration Date: unknown
Title: Roadwork, Roadwork
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT)has completed “Chip Sealing and Brooming” operations on this roadway. Speed limits will be reduced, no center stripe with loose gravel on roadway. Striping is scheduled to take place by end of July 2022.
Post Date: 2022-05-18 07:20:33.0
Update Date: 2022-06-10 09:17:36.0
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 454, Raton to mile marker 460, (RATON PASS/PORT OF ENTRY).
Description: Roadwork~~~I-25 northbound and southbound from mile marker 454 to mile marker 460, (RATON PASS/PORT OF ENTRY). The New Mexico Department of Transportation will have contractor personnel and equipment performing roadway construction, motorists can anticipate various lane and shoulder restrictions. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2021-06-16 13:27:31.0
Update Date: 2022-01-19 08:20:12.0
Expiration Date: unknown
Title: Roadwork, US 54 at mile marker 304 Montoya / Tucumcari.
Description: Roadwork~~~US 54 from mile marker 303 to mile marker 305. The New Mexico Department of Transportation District Four will have road construction on U.S. 54 between mile posts 303 to 305. Please drive with caution, reduce speed and obey all posted traffic signs. The traveling public is advised to expect minor delays. (ET Construction)
Post Date: 2021-06-16 13:21:24.0
Update Date: 2021-06-30 10:39:39.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 323, Aurora (NM 3/VILLANUEVA). Right lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2022-06-15 11:33:56.0
Update Date: 2022-06-15 11:33:56.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 347, (LAS VEGAS NORTH). Right lane closed.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2022-06-15 11:32:39.0
Update Date: 2022-06-15 11:32:39.0
Expiration Date: unknown
Title: Construction Closure, NM 344 from mile marker 12 to mile marker 15.
Description: Construction Closure~~~A drainage improvement has begun on NM 344 from mile marker 12.71 to 14.77. One lane will be closed while work proceeds on the roadway, with a temporary stoplight in place. Please be aware that there is a vehicle width restriction of 10 feet throughout the construction zone. Expect delays and use caution while travelling through the area.
Post Date: 2021-10-13 13:16:02.0
Update Date: 2022-05-06 12:32:33.0
Expiration Date: unknown
Title: Roadwork, I 10 at mile marker 162, (ANTHONY).
Description: Roadwork~~~AUI, Inc. (Contractor) is continuing with roadwork and replacement of the NM 404 Bridge over I-10 at milepost 162, Anthony exit. Traffic is currently using new bridge as Contractor constructs the other half of the bridge. Please follow detour signage in the area, expect delays. Traffic is open to one lane in each direction. Contractor hours will be Monday through Friday from 7 a.m. to 6 p.m. Traffic control will remain in place 24/7.
Post Date: 2021-01-13 14:58:54.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Construction Closure, I 40 eastbound and westbound at mile marker 170, (CARNUEL).
Description: The New Mexico Department of Transportation is doing roadway rehabilitation project on I-40 between MM 170-174. Speed reduced to 45 mph. Crews will be working on various lanes and shoulders in both directions. They will maintain two lanes of traffic eastbound and west bound. Westbound entrance ramp from NM 337 will be closed and detours will be set up. Motorists should anticipate delays. Contractor: MSCI NMDOT PM: Manny Ramirez
Post Date: 2022-06-01 16:14:58.0
Update Date: 2022-06-17 07:53:24.0
Expiration Date: unknown
Title: Construction Closure, I 25 northbound and southbound at mile marker 203, Meadow Lake (NM 6/LOS LUNAS).
Description: The Village of Los Lunas will be landscaping median of I-25 for drainage improvements. southbound and northbound inside lanes will be closed from 9am to 3pm daily. Motorist should expect delays. Contractor: TLC
Post Date: 2022-06-01 16:04:50.0
Update Date: 2022-06-17 07:57:11.0
Expiration Date: unknown
Title: Construction Closure, NM 556 northbound and southbound at mile marker 12, at Candelaria.
Description: The New Mexico Department of Transportation will be working on pedestrian bridges between Comanche and Candelaria. There will be various lane closures and shoulder restrictions daily from 9am-3 PM. Motorists should anticipate delays. Contractor: Meridian Contracting
Post Date: 2022-06-01 16:02:22.0
Update Date: 2022-06-17 07:53:53.0
Expiration Date: unknown
Title: Roadwork, NM 94 at mile marker 3, Manuelitas. Right lane closed.
Description: Roadwork~~~A single lane closure is in place, expect minor delays
Post Date: 2022-06-01 07:44:25.0
Update Date: 2022-06-01 07:44:25.0
Expiration Date: unknown
Title: Roadwork, US 64 at mile marker 318, 8 miles east of Cimarron. Right lane closed.
Description: Roadwork~~~One lane closure with Mobile Traffic Signal System, expect minor delays.
Post Date: 2022-05-31 09:12:43.0
Update Date: 2022-05-31 09:12:43.0
Expiration Date: unknown
Title: Roadwork, NM 434 from mile marker 19, 5 miles north of Guadalupita to mile marker 22, 4 miles south of Black Lake. Right lane closed.
Description: Roadwork~~~Clearing and Grubbing operations are underway. A single lane closure is in place, expect delays.
Post Date: 2022-05-31 08:37:09.0
Update Date: 2022-05-31 08:37:09.0
Expiration Date: unknown
Title: Construction Closure, NM 6 eastbound and westbound at mile marker 23, 7 miles west of Los Lunas.
Description: NM 6 EB & WB milepost 26-33 will have various lane and shoulder restrictions daily from 6am to 6pm. Work is being performed for utility maintenance. Motorists should anticipate delays. Contractor: Mountain States
Post Date: 2022-03-29 15:54:29.0
Update Date: 2022-06-17 07:56:48.0
Expiration Date: unknown
Title: Roadwork, NM 53 from mile marker 15, Black Rock to mile marker 19, 4 miles east of Black Rock.
Description: Roadwork~~~NM 53 is reduced to one lane in both directions from mile marker 15-19 (Black Rock, east of Zuni) due to road construction work. Temporary street signals will guide traffic through the work zone. PLEASE WAIT FOR TRAFFIC SIGNALS TO AVOID ONCOMING TRAFFIC. Traffic control will remain in place 24/7. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2022-05-24 11:10:49.0
Update Date: 2022-06-02 09:27:12.0
Expiration Date: unknown
Title: Roadwork, NM 61 from mile marker 0, at US 180 to mile marker 24, 1 mile south of NM 152.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT)has completed “Chip Sealing and Brooming” operations on this roadway. Speed limits will be reduced, no center stripe with loose gravel on roadway. Striping is scheduled to take place by end of July 2022.
Post Date: 2022-05-24 07:29:46.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Roadwork, NM 68 northbound and southbound from mile marker 4 to mile marker 12.
Description: Roadwork~~~One lane will be closed for roadwork in each direction from 7:00 AM to 7:00 PM, Monday through Friday, during daylight hours. This project is scheduled for completion in the summer of 2023. There will be lane closures and traffic switches during this time as construction progresses. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2021-11-19 07:35:06.0
Expiration Date: unknown
Title: Roadwork, NM 15 from mile marker 1, Silver City to mile marker 35, 4 miles south of Gila Hot Springs.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) will be performing “Chip Sealing and Brooming” operations in Grant Co. Speed limits will be reduced, no center stripe with loose gravel on roadway. Traffic will encounter lane drops with pilot car and flagging operations.
Post Date: 2022-06-14 08:55:06.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Alert, NM 124 from mile marker 0, at NM 117 to mile marker 8, 1 mile east of I-40 exit 96.
Description: Alert~~~NM 124 HAS A PERMANENT HEIGHT RESTRICTION IN PLACE. All CMV's and high profile vehicles are PROHIBITED on NM 124, from mile marker 0-8 (from Skyway at Exit 89 to McCartys at Exit 96) due to a low 13' clearance of a concrete box culvert and no turn-around space. This event will be updated as conditions change.
Post Date: 2020-01-14 15:29:13.0
Update Date: 2022-06-02 09:26:46.0
Expiration Date: unknown
Title: Construction Closure, NM 528 northbound and southbound at mile marker 9.
Description: The New Mexico Department of Transportation will have various lane and shoulder restrictions daily through. Work will be performed for state road maintenance and improvements. Motorists should anticipate delays.
Post Date: 2022-06-07 08:22:10.0
Update Date: 2022-06-17 12:48:56.0
Expiration Date: unknown
Title: Lane Closure, US 70 westbound at mile marker 229 Tularosa.
Description: Lane Closure~~~Motorists please be advised that the Village of Tularosa will have the Westbound right lane closed on US 70 at mm 229 (Tularosa) due to a water line break. Please use caution, reduce speed and watch for all personnel and equipment in the area.
Post Date: 2022-07-05 11:19:49.0
Update Date: 2022-07-05 11:19:49.0
Expiration Date: unknown
Title: Roadwork, I 40 at mile marker 320, 8 miles west of Tucumcari.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway Motorists can anticipate various lane and shoulder restrictions.
Post Date: 2022-07-05 07:46:39.0
Update Date: 2022-07-05 07:46:39.0
Expiration Date: unknown
Title: Roadwork, I 40 from mile marker 112, 27 miles east of Grants to mile marker 117, Mesita Interchange.
Description: Roadwork~~~I-40 will be reduced to one lane from mile marker 112-117 (from Laguna to Mesita). All work will be performed from 7am to 6pm until early July. Speed reduced to 55mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2020-09-01 09:18:42.0
Update Date: 2022-06-02 09:26:30.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 34, 7 miles south of Hatch to mile marker 39, 2 miles south of Hatch.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) is working on finalizing the roadway reconstruction project on I-25 north of Las Cruces. Traffic in now shifted into the northbound and southbound lanes, exit 35 at Rincon is now open. Continue to use caution as contractor completes final project items such as removal of barrier wall, ROGFC and striping. Hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday.
Post Date: 2021-06-01 11:23:40.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Roadwork, NM 518 at mile marker 24, La Cueva.
Description: Roadwork~~~The New Mexico Department of Transportation will have contractor personnel and equipment on the roadway. Motorists can anticipate various lane and shoulder restrictions and minor delays
Post Date: 2022-03-31 13:51:54.0
Update Date: 2022-03-31 13:51:54.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 22, 1 mile north of Loving. Left lane and left shoulder closed.
Description: Roadwork~~~Road construction to include full deck reconstruction, reconstruction of curb and gutter, sidewalk, ADA improvements, drainage structures, intersection improvements, traffic signals, roadway lighting and miscellaneous construction. Road construction is underway between MP 17.386 and MP 21.97 on US285. The Speed Limit is reduced to 45 MPH. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be complete in October 2023. Brian Torres, NMDOT Project Manager (575)626-4278; Alex Serna, NMDOT Construction Traffic Control Supervisor (719)251-6823; Jacob Thompson, Constructors, Inc. Construction Project Manager (575)706-0874; Javier Sanchez, Constructors, Inc. Traffic Control Supervisor (575)706-2980.
Post Date: 2022-03-31 08:38:54.0
Update Date: 2022-06-17 11:59:45.0
Expiration Date: unknown
Title: Weather Alert, NM 211 from mile marker 3 to mile marker 4 Gila.
Description: Weather Advisory - Standing water on roadway. Use extreme caution.~~~NM 211 “Bear Creek” at milepost 3.5 is closed due to running water and roadway flooding. Please use US 180 as an alternate route. This roadway will remain closed over the holiday weekend. When the roadway is flooded do not cross and seek an alternate route. NMDOT will notify as conditions change.
Post Date: 2022-06-30 16:06:26.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Roadwork, US 180 from mile marker 48, 2 miles east of Alma to mile marker 67, 9 miles west of Buckhorn.
Description: Roadwork~~~Dustrol, Inc. (Contractor) has completed Hot-In-Place Recycling project along US 180 near Glenwood, NM. Traffic can expect no center stipe and reduced speeds.
Post Date: 2022-04-28 15:17:15.0
Update Date: 2022-06-10 09:18:07.0
Expiration Date: unknown
Title: Construction Closure, I 40 eastbound and westbound at mile marker 153, (98th STREET).
Description: I-40 EB & WB milepost 152-155 (between 98th and Coors) The New Mexico Department of Transportation will have various lane and shoulder restrictions daily. Work will be performed for interstate maintenance and improvements. During construction, drivers should expect intermittent shoulder closures and temporary intermittent ramp closures along the construction route. Motorists should anticipate delays. Ramp closures are as follows: WB 98th St. Off Ramp WB Unser On Ramp EB Unser On Ramp EB Unser Loop on Ramp Contractor: Mountain States NMDOT PM: Manny Ramirez
Post Date: 2022-05-26 14:48:23.0
Update Date: 2022-06-17 07:49:46.0
Expiration Date: unknown
Title: Roadwork, US 54 northbound and southbound from mile marker 124, 1 mile north of Carrizozo to mile marker 125, 2 miles north of Carrizozo.
Description: Bridge Rehabilitation is underway at MP 124 to 125 on US54. The Speed Limit is reduced to 45 MPH applying to the Work. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2022. Aaron Clark, NMDOT Project Manager (575)626-7816; Contractor; Austin Mansfield, AUI Inc., Construction Project Manager (505)-269-3577 ; Mark Pino, AUI Inc., Construction Traffic Control Supervisor (505)-366-1143.
Post Date: 2022-06-23 08:50:56.0
Update Date: 2022-06-23 08:50:56.0
Expiration Date: unknown
Title: Roadwork, NM 602 northbound and southbound from mile marker 5, 5 miles north of NM 53 to mile marker 10, 2 miles south of Vanderwagen.
Description: Roadwork~~~NM 602 is reduced to one lane in both directions from mile marker 5-10 (north of Jct. NM 602/NM53) due to road maintenance work. A pilot car will guide traffic through the work zone. All work will be completed 9am-4pm Monday through Thursday until the end of May. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2022-05-19 08:53:28.0
Update Date: 2022-06-02 09:27:52.0
Expiration Date: unknown
Title: Roadwork, NM 122 from mile marker 12, 2 miles east of South Chaves to mile marker 15, 2 miles west of Prewitt.
Description: Roadwork~~~NM 122 is reduced to one lane in both directions from mile marker 12-15 (between Prewitt and Thoreau) due to road maintenance work. Flag personnel will guide traffic through the work zone. All work will be completed 7am-6pm until mid-June. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2022-05-19 08:50:37.0
Update Date: 2022-06-02 09:26:55.0
Expiration Date: unknown
Title: Roadwork, US 380 from mile marker 72, 6 miles east of Carrizozo to mile marker 74, 8 miles east of Carrizozo.
Description: Roadwork~~~Bridge Reconstructions is underway between MP 27 and MP 74 on US 380. The Speed Limit is reduced to 45 MPH applying to the Work Zones and a temporary detour bridge is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2022. Aaron Clark NMDOT Project Manager 575-626-9817; Contractor; Tony Sam, FNF Construction Project Manager 480-209-3636; Bill Moss, FNF Construction Traffic Control Supervisor 505-350-7409
Post Date: 2021-07-15 13:52:16.0
Update Date: 2022-06-17 11:57:09.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 18, 2 miles north of Malaga.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Donna Gililland 575-626-4857
Post Date: 2020-08-13 14:57:21.0
Update Date: 2022-06-24 07:59:29.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 0, Texas State Line to mile marker 8, 8 miles south of Malaga.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Donna Gililland 575-626-4857
Post Date: 2020-08-13 14:51:47.0
Update Date: 2022-06-17 09:29:42.0
Expiration Date: unknown
Title: Roadwork, US 380 at mile marker 65, Carrizozo.
Description: Dynamic Message Signs and Guardrail improvements are underway at MP 65 on US 380. The Speed Limit is reduced to 45 MPH applying to the Work. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2022. Gilbert Barela, NMDOT Project Manager (575)626-7986; Contractor; Erin Millwood, Bixby Electric, Construction Project Manager (505)-263-3421 ; Trae Baldwin, Bixby Electric, Construction Traffic Control Supervisor (505)379-8058.
Post Date: 2022-03-10 11:12:16.0
Update Date: 2022-06-23 08:47:39.0
Expiration Date: unknown
Title: Closure, NM 94 from mile marker 14, Ledoux to mile marker 15, 1 mile north of Ledoux. Roadway closed.
Description: Closure~~~Closure, NM 94 from mile marker 14, Ledoux to mile marker 15, 1 mile north of Ledoux. Roadway closed du to flooding This event will be updated as conditions change.
Post Date: 2022-07-02 17:25:22.0
Update Date: 2022-07-02 17:25:22.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 14, 4 miles north of Las Cruces to mile marker 24, 14 miles north of Las Cruces.
Description: Roadwork~~~Mesa Verde Enterprises, Inc. (Contractor) will be continuing a roadway reconstruction project on Interstate 25 from milepost 14 to 24, just north of Las Cruces. Crews will be working in the northbound and southbound lanes; one lane will remain open at all times. The southbound rest area at milepost 23 may be closed due to paving operations. Contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Saturday.
Post Date: 2022-03-28 13:34:25.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Roadwork, I 25 northbound and southbound from mile marker 270, 8 miles south of Santa Fe to mile marker 269, La Bajada.
Description: Roadwork~~~Kimo Constructors Inc, in conjunction with the New Mexico Department of Transportation are set to begin a bridge rehabilitation project on Canyon Ridge Road that spans I 25. The existing bridge superstructure will be raised and rehabilitated. *** During peak commuter hours all lanes will be open for traffic. Peak commuter hours would be 7am to 9am northbound and 3pm to 6pm southbound. *** Partial lane closures in either direction may occur between 5am and 11 pm, and full I-25 closures may occur between 11pm and 5am. In the event of a full I-25 lane closure traffic will be detoured to the La Cienega Interchange onto the East frontage road to Waldo Canyon Interchange back on to I-25. *** Work is expected to be completed within 3 weeks.
Post Date: 2022-06-27 10:46:08.0
Update Date: 2022-06-27 10:46:08.0
Expiration Date: unknown
Title: Alert, US 70 at mile marker 184, 22 miles west of Holloman AFB.
Description: Alert~~~White Sands Missile Range periodically has missile firings over US 70 and/or US 380. During the firings the road will be temporarily closed. Please call 575-678-1178 for daily information on possible closure dates and times for firings. This is a PERMANENT ALERT.
Post Date: Mon Jun 27 10:28:09 MDT 2022
Update Date: 2022-07-05 08:43:24.0
Expiration Date: unknown
Title: Roadwork, NM 169 from mile marker 23, 6 miles south of Alamo to mile marker 24, 5 miles south of Alamo.
Description: Roadwork~~~Hasse Contracting Co. (Contractor) will have lane closures in place on NM 169 at milepost 23.4 for bridge and culvert repairs. Traffic can expect lane closures. Contractor working hours are Monday through Friday from 7 a.m. to 5 p.m. This closure is estimated to be in place for two weeks reopening on or about summer 2022.
Post Date: 2022-04-25 07:27:38.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Alert, NM 513 at mile marker 0.
Description: Alert~~~Closure The New Mexico Department of Health (NMDOH) has detected community spread in the state. Salinas National Park is CLOSED DUE TO COVID-19.
Post Date: 2020-03-23 13:40:40.0
Update Date: 2020-03-23 13:40:40.0
Expiration Date: unknown
Title: Alert, NM 152 eastbound and westbound from mile marker 15, San Lorenzo to mile marker 40, Kingston.
Description: Alert~~~NM 152 between San Lorenzo and Kingston has STEEP GRADES AND NUMEROUS TIGHT TURNS. Trucks without retarder brakes and/or longer than 40 feet in length are PROHIBITED on this section of NM 152. Consider using an alternate route - NM 26 to US 180 or US 60 to NM 12 to US 180. THIS IS A PERMANENT ALERT.
Post Date: 2022-06-20 20:25:08.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Alert, NM 104 from mile marker 69, Mesa Rica to mile marker 105, 1 mile west of Tucumcari. Roadway closed.
Description: Alert~~~There is currently a load restriction of 25 tons (50,000 lbs.) between mile posts 69 and 105. This event will update as conditions change.
Post Date: 2021-12-20 15:13:12.0
Update Date: 2022-02-04 00:10:04.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Roadwork~~~Construction begins on a one-year-long project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. . Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. Please obey all traffic control personnel and proceed with caution through the roadwork zone. **PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!**
Post Date: 2022-04-18 07:33:36.0
Update Date: 2022-05-18 10:03:30.0
Expiration Date: unknown
Title: Roadwork, US 285 northbound and southbound from mile marker 338, 1 mile north of Hernandez to mile marker 350, 3 miles south of Ojo Caliente.
Description: Roadwork~~~One lane will be closed from 8am until 6pm, Monday through Friday, for a repaving project. The project is expected to take 30 working days to complete. Please obey all traffic control personnel and expect delays through the road work area.
Post Date: 2022-04-18 07:26:44.0
Update Date: 2022-04-18 07:26:44.0
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 85, 6 miles north of T or C to mile marker 103, 24 miles north of T or C.
Description: Roadwork~~~J-H Supply, Inc. (Contractor) will continue replacing the guardrail and end treatments along I-25 in Sierra County. Traffic can expect lane closures in the northbound and southbound driving right lane and shoulder as the contractor is performing these safety improvements. Overnight lane closures will be in place as needed. Hours of operation will be from 7:00 am to 5:00 pm, Monday through Friday. Construction is expected to be completed by fall 2022.
Post Date: 2022-05-16 09:59:26.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 117, 30 miles south of Socorro to mile marker 121, 26 miles south of Socorro.
Description: Roadwork~~~Hasse Contracting Co. will be making repairs to the bridges on I-25 at milepost 117 and milepost 121. Traffic can expect lane closures on I-25 on the southbound lanes until the bridge deck repairs are complete, one lane will remain open. Contractor working hours are Monday through Friday from 7 a.m. to 5 p.m., traffic control will remain in place 24/7. Use caution for workers and equipment in the area. Repairs are expected to be completed by summer 2022.
Post Date: 2022-02-14 16:17:12.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: unknown
Title: Closure, Closure
Description: Closure~~~COCHITI PUEBLO WILL BE CLOSED FOR EVERYONE WHO IS NOT RESIDENTIAL. Be advised the ONLY entrance open to residents, which will be monitored by law enforcement. (ONLY TRIBAL RESIDENTS). Safety precautions during the COVID-19
Post Date: 2020-04-13 08:23:13.0
Update Date: 2020-04-13 08:25:13.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44 to mile marker 45.
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2021-04-30 08:17:27.0
Expiration Date: unknown
Title: Lane Closure, NM 96 eastbound and westbound from mile marker 31 Arroyo del Agua to mile marker 32. Roadway closed.
Description: Lane Closure~~~One lane closed for bridge and road repairs. A pilot car is on hand to guide travelers through the construction zone. THERE IS A 12' WIDTH RESTRICTION IN PLACE UNTIL FURTHER NOTICE. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-10-05 07:54:09.0
Update Date: 2020-10-05 07:54:09.0
Expiration Date: unknown
Title: Roadwork, US 62 from mile marker 31, Carlsbad to mile marker 32, Carlsbad. Right lane and right shoulder closed.
Description: Roadwork~~~Road construction to include, reconstruction of the east and west approaches to the intersection, reconstruction of curb and gutter, construction of raised median, install sidewalk, ADA improvements, traffic signals, and miscellaneous construction. Road construction is underway between MM 31 and 32 on US62. The Speed Limit is reduced to 35 MPH. Motorists should obey all construction and detour signing and watch for construction personnel and equipment. Project is scheduled to be complete in November 2022. Brian Torres, NMDOT Project Manager (575) 626-4278; Rick Castillo, NMDOT Construction Traffic Control Supervisor (512) 630-3554; Albert Gomez, Constructors, Inc. Construction Project Manager (575) 885-8838; Phillip Howell, Constructors, Inc. Traffic Control Supervisor (575) 361-0629.
Post Date: 2022-05-27 13:36:41.0
Update Date: 2022-06-23 08:56:48.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Closure, NM 290 at mile marker 6.
Description: Closure~~~Eastbound NM 290 is closed at mile marker 6 (end of the pavement) due to a wildfire. Seek alternate route. This event will be updated as conditions change
Post Date: 2022-04-22 21:50:04.0
Update Date: 2022-06-14 08:39:46.0
Expiration Date: unknown
Title: Closure, NM 65 at mile marker 15, 2 miles north of El Porvenir. Roadway closed.
Description: Closure~~~Closed due to forest fire. Traffic is allowed for evacuation from the Hermits Peak fire to Las Vegas.
Post Date: 2022-04-22 19:57:49.0
Update Date: 2022-05-17 15:46:52.0
Expiration Date: unknown
Title: Roadwork, NM 176 from mile marker 10, 2 miles west of Lea to mile marker 26, 8 miles west of Eunice. Roadway closed.
Description: Roadwork~~~Road Construction is ongoing for Highway 176 between milepost 10 and milepost 26.3 for 16.3 miles. The project has resumed from full suspension. Width restrictions are in place. Traffic control has been placed back onto the project. Follow posted speed limits and signs. Be mindful of the construction crews working on project. Contact Information Supervisor Curtis Been- 575-538-1613. Project Manager Jason Stailey- 575-388-1546 extension 2735. Traffic Control Supervisor Harry Hatter- 970-529-3500. NMDOT: Project Manager John Lara- 575-840-9625.
Post Date: 2022-03-18 13:57:48.0
Update Date: 2022-07-01 06:22:34.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 123, Carrizozo. Roadway closed.
Description: Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667
Post Date: 2022-02-18 11:01:42.0
Update Date: 2022-06-23 08:20:26.0
Expiration Date: unknown
Title: Roadwork, NM 359 eastbound and westbound from mile marker 2 to mile marker 1 Mesilla.
Description: Roadwork~~~A Mountain Construction Company (Contractor) will have equipment and employees along Calle de Norte for the construction of a walking path. Traffic is encouraged to reduce speeds and use caution. Construction hours are Monday through Friday from 7a.m. to 5 p.m. Walking path is expected to be completed by November 2022.
Post Date: 2022-06-17 13:28:59.0
Update Date: 2022-07-05 08:03:25.792
Expiration Date: 2022-11-30 17:00:00.0
Title: Construction Closure, US 550 eastbound and westbound at mile marker 4, 2 miles north of Bernalillo.
Description: The Department of Transportation will be working on OGFC to complete project on US 550. There will be several lane closures. This will be night work until completed. Motorists should anticipate delays. Contractor: FNF NMDOT: James Paez
Post Date: 2022-06-17 12:50:27.0
Update Date: 2022-06-22 09:06:43.0
Expiration Date: unknown
Title: Construction Closure, NM 45 northbound and southbound at mile marker 12, Bridge Blvd.
Description: Crews will close the right-hand lanes both north and southbound on Coors Boulevard. Southbound drivers will begin to see lane restrictions on the approach to Fortuna, and northbound drivers will see restrictions on the approach to Cloudcroft. These lane closures will occur between the hours of 9:00 a.m. – 3:30 p.m.
Post Date: 2022-05-06 15:23:13.0
Update Date: 2022-06-17 12:47:25.0
Expiration Date: unknown
Title: Roadwork, NM 83 from mile marker 0, Lovington to mile marker 1, 1 mile east of Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US83 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. Work is underway in Downtown Lovington and there will be road closures on the side roads connecting to Main Street and the south bound lane will be closed from Van Buren to Adams. Expect delays and detours around the closed roads. Obey all traffic and speed signs, and use caution while driving. Once detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last 410 working days. Traffic Control is currently set up in Downtown Lovington. Traffic Control has been set up on HWY 83 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drivepads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2104340 project: Contractor: Constructors, Inc., Project Manager- Gabriel Ortega (575) 496-9397, Superintendent-James King (575) 885-8838. Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938, Project Safety Office- Tami Mandel (505) 697-1787- Project RRO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2022-07-01 06:22:45.0
Expiration Date: unknown
Title: Roadwork, NM 173 eastbound and westbound from mile marker 2 to mile marker 4.
Description: Roadwork~~~Work begins on 6/6/2022 on a project that will include roadway reconstruction, improved drainage structures, erosion control & revegetation, new right-of-way fencing, and permanent signing and striping. One lane will be closed for the duration of the project, and there will be a width restriction limit for all vehicles of 9 feet. Work will take place Monday through Friday, from 7am until 4:30pm each day. The contractor, AUI Inc., expects to have the project completed in November 2022.
Post Date: 2022-06-03 10:55:55.0
Update Date: 2022-06-03 10:55:55.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 16, Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, will be working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Donna Gililland 575-626-4857
Post Date: 2022-06-03 07:40:05.0
Update Date: 2022-06-24 07:59:15.0
Expiration Date: unknown
Title: Alert, Alert
Description: Alert~~~The La Bajada Rest Area is closed due to plumbing issues.
Post Date: 2022-07-01 19:10:06.0
Update Date: 2022-07-01 19:10:06.0
Expiration Date: unknown
Title: Closure, NM 94 at mile marker 12, South Carmen. Roadway closed.
Description: Closure~~~ Closure, NM 94 at mile marker 12, South Carmen. Roadway closed. Due to flooding This event will be updated as conditions change.
Post Date: 2022-07-01 16:54:58.0
Update Date: 2022-07-01 16:54:58.0
Expiration Date: unknown
Title: Closure, NM 276 at mile marker 0.
Description: Closure~~~Closure due to flooding. Roadway is open for evacuation only.
Post Date: 2022-07-01 15:36:51.0
Update Date: 2022-07-01 15:36:51.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

Fair 77°F
30.06in
Barometer
44%
Humidity
South 10.4mph
Wind
Fair

More Local Information

Bookmark and Share

Traffic Nearby

Go Ad Free - Become a Member

Cloudcroft weather and traffic updates by locals

Write your own Cloudcroft, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Cloudcroft, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Cloudcroft, NM report and/or forecast will be removed by a moderator.