Kirtland Air Force Base Traffic and Road Conditions

Kirtland Air Force Base Traffic Map

No Traffic Flow? Zoom in Closer

How to use the Kirtland Air Force Base Traffic Map

Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic or no traffic*. Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. If you are unable to pan the map, press here (to focus off of the map) and try again.

* In known extreme weather events or accidents, the map provider may still show green lines, even if lanes or the entire road is closed.

All Traffic Data Provided by NMDOT. Click the icons on the map to see info.

Kirtland Air Force Base Traffic Alerts

Title: Lane Closure, US 64 from mile marker 26, 3 miles east of Shiprock to mile marker 28, 5 miles east of Shiprock.
Description: Lane Closure~~~One lane will be closed in each direction for the construction of turning lanes and lighting at the entrance to Flowing Water Casino. Work is expected to be completed by the end of November 2023. *** There is an 11-foot width restriction in place in both directions for the duration of this project. ***
Post Date: 2023-09-20 14:16:05.0
Update Date: 2023-11-27 13:26:16.0
Expiration Date: unknown
Title: Roadwork, NM 176 from mile marker 26, 8 miles west of Eunice to mile marker 34, Eunice.
Description: Roadwork~~~Roadwork mill and fill operations have begun on NM 176 from mm 26 (west of Eunice) to mm 34 (Eunice). NM 176 will be reduced to one lane for both eastbound and westbound traffic. Drivers can expect pilot car and flagging operations throughout the duration of the project and working hours. Drivers are encouraged to plan accordingly and expect short delays. Use caution for all workers and equipment in the area. The hours of operation are from 7:00 a.m. to 5:30 p.m., Monday through Sunday. The project has been placed in suspension until weather allows for continued paving. Contractor: Cutler Repaving Inc. Superintendent- Marcus Jacobs (785) 766-2408; NMDOT Project Manager- John Lara (575) 626-9872; NMDOT AMS- Greg Evans (575) 626-3850.
Post Date: 2023-11-15 12:00:52.0
Update Date: 2024-01-18 14:42:20.0
Expiration Date: unknown
Title: Lane Closure, NM 117 , and undefined from mile marker 16, 9 miles south of Pie Town Road to mile marker 18, 7 miles south of Pie Town Road.
Description: Lane Closure~~~NM 117 will have multiple lane closures from mile marker 16-18 (South of Pie Town Road) due to road maintenance. Flagger operation will be utilized. All work will be performed until 2:30pm. Please watch for flaggers. Please drive with caution, reduce speed, and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-02-14 10:14:00.0
Update Date: 2024-02-14 10:14:00.0
Expiration Date: unknown
Title: Roadwork, NM 549 from mile marker 10 to mile marker 22.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) will be continuing roadway rehabilitation project on NM 549 from milepost 10 to 22. Drivers can expect lane closures on both the eastbound and westbound lanes of NM 549 as needed. A temporary traffic light with a pilot car operation will be in place, please reduce your speed and obey traffic control devices. Roadway will be restricted to 12-foot for oversized loads. The contractor’s hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday, with the possibility of some weekend work.
Post Date: 2023-12-06 07:42:25.0
Update Date: 2024-02-29 11:30:49.89
Expiration Date: unknown
Title: Seasonal Closure, NM 159 from mile marker 12, 3 miles east of Mogollon to mile marker 22, 3 miles west of Willow Creek Campground.
Description: Seasonal Closure~~~The New Mexico Department of Transportation has closed the gates on NM 159 “Bursum Rd” for the upcoming winter months starting today Wednesday, January 3, 2024. The lower gate is located at milepost 12.3, just past Mogollon, and the upper gate located at milepost 22.6, Willow Creek Campground. This closure is in place due to winter weather conditions making the roadway impassable. The traveling public is asked to use US 180 to NM 12 (Reserve) to NM 435 (Reserve Beaverhead Road) for access into Willow Creek, Snow Lake, and the Gila National Forrest. The NMDOT will monitor gates, expected reopening is scheduled for late April to mid-May.
Post Date: Wed Jan 03 09:30:20 MST 2024
Update Date: 2024-02-28 07:41:25.0
Expiration Date: unknown
Title: Alert, US 64 from mile marker 273, 13 miles west of Eagle Nest to mile marker 276, 10 miles west of Eagle Nest.
Description: Alert~~~U.S. 64, between mileposts 273 and 276, motorists are advised to use caution and be alert for commercial traffic performing wide turns due to narrow curves.
Post Date: 2024-01-23 07:09:35.0
Update Date: 2024-02-27 07:43:24.664
Expiration Date: unknown
Title: Conditions exist in the Taos area.
Description: Please Select~~~Crews are out salting and sanding. Drive with caution. Please stay behind snowplows at least 50 feet.
Post Date: 2022-02-22 12:16:48.0
Update Date: 2022-02-22 18:28:52.0
Expiration Date: unknown
Title: undefined, US 64 from mile marker 266, 12 miles east of Taos to mile marker 272, 14 miles west of Eagle Nest.
Description: Please Select~~~
Post Date: 2022-02-22 05:18:04.0
Update Date: 2022-02-22 19:43:56.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 151, 19 miles south of Corona to mile marker 163, 7 miles south of Corona.
Description: Roadwork~~~New Roadway construction to include drainage structures is underway between MP 151.6 and MP 163.7 (south of Corona) on US 54. Motorists should obey all construction signing and watch for construction personnel and equipment in the area. Speed limit has been reduced to 45 MPH in the construction zone. Lanes are to remain open for traffic during this phase of the project. Project is scheduled to be finished in Fall of 2024. NMDOT Project Manager, Arron Clark (575)626-9817; Contractor, FNF Construction Inc., Project Manager, Rob Woods (602) 989-1692; Traffic Control Supervisor, David Hernandez (575) 800-4663.
Post Date: 2023-04-18 12:53:43.0
Update Date: 2023-08-01 12:29:28.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde.
Description: Roadwork~~~One lane will be closed for roadwork in each direction from 7:00 AM to 7:00 PM, Monday through Friday, during daylight hours. This project is scheduled for completion in the summer of 2023. There will be lane closures and traffic switches during this time as construction progresses. Please obey all traffic control personnel and proceed with caution through the roadwork zone. Expect delays and use caution while travelling through the area.
Post Date: 2020-09-15 10:02:28.0
Update Date: 2022-11-08 07:57:45.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 16, Malaga to mile marker 17, 1 mile north of Malaga. Left lane and left shoulder closed.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 16.390 to MP 17.757. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2022-03-31 08:38:54.0
Update Date: 2023-08-01 12:03:57.0
Expiration Date: unknown
Title: Crash, NM 423 at mile marker 3.
Description: Crash~~~Paseo Del Norte Westbound at 2nd street has been reduced to 1 lane due to a crash. Seek alternate route and expect heavy delays.
Post Date: Thu Feb 29 15:28:30 MST 2024
Update Date: 2024-02-29 15:59:25.0
Expiration Date: unknown
Title: Difficult Driving, NM 152 eastbound and westbound from mile marker 11, Mimbres to mile marker 50, 2 miles east of Hillsboro.
Description: Difficult Driving Conditions - Roads are wet with some icy spots. Black ice may exist when temperatures drop.~~~NM 152 is reported at snow packed & icy from milepost 15 (San Lorenzo) to milepost 40(Kingston). Please be sure to drive with caution, reduce speed, and follow all posted traffic signs. The NMDOT will continue to plow and monitor. This event will be updated as conditions change.
Post Date: 2024-02-29 07:02:20.0
Update Date: 2024-02-29 11:30:49.89
Expiration Date: unknown
Title: Fair Driving Conditions exist in the Silver City area.
Description: Fair Driving Conditions~~~The Silver City Patrol reported the roadways with a light snow fall and wet, could become icy overnight. Please drive with caution, reduce speed, and obey all posted traffic signs. The NMDOT will continue to monitor roadways. This event will be updated as conditions change.
Post Date: 2024-02-29 07:00:55.0
Update Date: 2024-02-29 07:00:55.0
Expiration Date: unknown
Title: Construction Closure, NM 109 northbound and southbound at mile marker 5, 1 mile north of Jarales.
Description: NM 109 milepost 5.3-6.1 (3/20) The New Mexico Department of Transportation will have a continues road closure of the highway. Detours will be established. Work is being performed for bridge and road construction. Motorists should anticipate delays. Contractor: FNF Project A302220 NMDOT: NetoRey Terrazas
Post Date: 2023-07-27 12:01:32.0
Update Date: 2024-02-22 10:27:13.0
Expiration Date: 2024-03-20 23:59:00.0
Title: Lane Closure, US 550 from mile marker 160, Aztec to mile marker 165, 1 mile south of Inca.
Description: Lane Closure~~~The New Mexico Department of Transportation (NMDOT) and Fisher Sand & Gravel Inc. will begin a roadway improvement project on U.S. 550 between mile markers 161 and 165 in Aztec N.M. This project will consist of full-depth reclamation, removal of existing asphalt, placement of new asphalt pavement, safety enhancements, traffic control, signing and striping. Starting May 1, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. There will be an 11-foot width restriction in place in the southbound lane only. The contractor will be working Monday through Friday from 7:00 a.m. to 7:00 p.m. Motorists can expect delays during this time. Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. Updates on this project will be posted on the New Mexico Department of Transportation’s road advisory website, http://nmroads.com/.
Post Date: 2023-04-27 12:42:19.0
Update Date: 2023-11-27 11:12:33.0
Expiration Date: unknown
Title: Construction Closure, NM 14 northbound and southbound and eastbound and westbound at mile marker 6, Sandia Crest Rd..
Description: NM 14, Crest Rd, Frost Rd MP 6 (thru 3/8) There will be various shoulder closures. Work is being performed for utility survey. Motorists should anticipate delays. Contractor: Star Paving NMDOT: Jeremy Maestas
Post Date: 2024-02-22 13:56:42.0
Update Date: 2024-02-22 13:56:42.0
Expiration Date: 2024-03-08 18:00:00.0
Title: Roadwork, NM 41 from mile marker 56, Galisteo to mile marker 62, Lamy.
Description: Roadwork~~~NM 41 Phase III Improvements – Milepost 56.6 to US 84/285 ***A new traffic pattern has been put in place for the duration of the project. One lane will be open in each direction and the speed limit will be reduced to 35 mph in the construction zone for the duration of the project. ***
Post Date: 2022-07-21 14:43:17.0
Update Date: 2022-11-08 07:58:18.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 124, 1 mile north of Carrizozo.
Description: Roadwork~~~FULL SUSPENSION-Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Temporary Traffic Signals have been installed at the intersection of US 54 & US 380, all directions are down to one lane through the intersection, Motorist should obey Traffic Signals at all times. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667
Post Date: 2022-09-15 14:35:30.0
Update Date: 2023-08-01 12:25:03.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 17, 1 mile north of Malaga to mile marker 21, Loving.
Description: Roadwork~~~Roadwork Construction is underway on US 285 between MP 17.386 to MP 21.974. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Constructors Inc- Superintendent, Jose Louis Samaniega (915) 262-7475; Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938; NMDOT Project Manager- Brian Torres 575-626-4278.
Post Date: 2020-08-13 14:57:21.0
Update Date: 2023-08-01 12:08:40.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 0, Texas State Line to mile marker 8, 8 miles south of Malaga.
Description: Roadwork~~~Roadwork~~Roadway and Bridge Replacement Construction is underway on US 285 between MP 0.000 to MP 7.614. Motorists can expect a one lane closure with pilot car. Please proceed with caution, obey all posted signs and watch for all personnel and equipment. The Maximum Posted Speed Limit during construction will be 45 MPH through non-work zone areas. A WIDTH RESTRICTION of Twelve Feet (12') is in place. WIDE LOAD and OVER-SIZED vehicles should seek an alternate route. This Project is 450 working days. Expected completion date is to be determined at a future date. Be aware of multiple construction operations taking place throughout the construction corridor. Contractor: Fisher Sand and Gravel- Superintendent, Felipe Tenorio (505) 373-7314; Traffic Control Supervisor- Terry Werito (505) 249-1978; NMDOT Project Manager- Juan Salas 575-626-9882
Post Date: 2020-08-13 14:51:47.0
Update Date: 2023-08-01 11:59:19.0
Expiration Date: unknown
Title: Alert, NM 104 eastbound and westbound from mile marker 70, 1 mile east of Mesa Rica to mile marker 90, 15 miles east of Conchas. Roadway closed.
Description: Alert~~~Bridge NO. 5995 at mile marker 71.5, Bridge No. 5254 at mile marker 81.8 and Bridge No. 5257 at mile marker 87.2 all have weight restrictions of 25 tons. Please seek alternate route.
Post Date: 2024-01-11 10:09:46.0
Update Date: 2024-01-11 10:09:46.0
Expiration Date: unknown
Title: Difficult Driving, NM 537 from mile marker 0 to mile marker 4.
Description: Difficult Driving Conditions - Roads are snow packed and icy. Light snow may cause limited visibility.~~~Difficult driving conditions on NM 537, mile marker 0-5 (from US 550 to the Rio Arriba County Line). Road is snow packed and icy. Visibility is fair. Please drive with caution, reduce speed and obey all posted traffic signs. Watch for snowplows. This event will be updated as conditions change.
Post Date: 2024-02-10 07:16:01.0
Update Date: 2024-02-10 07:16:01.0
Expiration Date: unknown
Title: Alert, NM 120 from mile marker 0, Black Lake to mile marker 9, 8 miles west of Ocate.
Description: Alert - Roads are icy in spots. Visibility is good with clear skies.~~~Roadway has limited width clearance. Tree cover will produce prolonged icy and snow packed road conditions, four-wheel drive vehicles are recommended.
Post Date: 2024-01-29 13:08:00.0
Update Date: 2024-02-28 07:53:32.619
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 150, (SOCORRO NORTH) to mile marker 161, Chamizal.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor) will be completing the roadway rehabilitation project on Interstate 25 from milepost 150 (Socorro North) to milepost 161 (Chamizal). Drivers can expect various daytime lane closures on both the northbound and southbound lanes as needed for guardrail and barrier wall placement. The contractor’s hours of operation will be from 6 a.m. to 6 p.m., Monday through Friday.
Post Date: 2023-08-28 08:52:29.0
Update Date: 2024-02-29 11:30:49.89
Expiration Date: unknown
Title: Closure, NM 539 northbound and southbound at mile marker 5 Navajo Dam.
Description: Closure~~~The New Mexico Department of Transportation, in conjunction with the Federal Bureau of Reclamation wish to alert the travelling public to an upcoming roadway closure near the Navajo Dam. The closure is scheduled to begin on February 26, 2024, and is estimated to be completed by May 17, 2024. Red Orange LLC has been retained by the Bureau of Reclamation to drill a series of monitoring wells near the dam. Due to the large size of the machinery involved motorists would be unable to pass safely in the work zone. An approximately ½ mile section of N.M. 539 will be closed for the duration of the project, motorists will detour onto N.M. 511. Active message boards will be in place to guide motorists around the road closure.
Post Date: 2024-02-26 06:54:25.0
Update Date: 2024-02-26 06:54:25.0
Expiration Date: Fri May 17 17:01:00 MDT 2024
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad. Center lane closed.
Description: Roadwork~~~FULL SUSPENSION-Road construction is underway between MM 38.5 and 42.0 on US 285. The Speed Limit is reduced to 45 MPH. Motorists should obey all construction signing and watch for construction personnel and equipment. Brian Torres, NMDOT Project Manager (575) 626-4278; Rick Castillo, NMDOT Construction Traffic Control Supervisor (512) 630-3554; Erin Millwood, Bixby Electric, Project Manager (505) 263.3421; Trae Baldwin, Bixby Electric Traffic Control Supervisor (505) 379-8058.
Post Date: 2022-08-22 15:46:56.0
Update Date: 2023-08-01 12:19:16.0
Expiration Date: unknown
Title: Seasonal Closure, NM 72 eastbound and westbound from mile marker 0, Raton to mile marker 36, Folsom. Roadway closed.
Description: Seasonal Closure - Roads are snow packed and icy.~~~Seasonal Road Closure. Roadway will become impassable due to ice, snow, and snow drifts. No roadway maintenance throughout seasonal closure.
Post Date: 2023-11-20 14:43:06.0
Update Date: 2023-12-07 11:07:57.0
Expiration Date: unknown
Title: Roadwork, I 40 eastbound and westbound from mile marker 358, 15 miles east of Texas State line to mile marker 373, Glenrio. Right lane and right shoulder closed.
Description: Roadwork~~~Text
Post Date: 2024-02-19 14:51:46.0
Update Date: 2024-02-19 14:51:46.0
Expiration Date: unknown
Title: Construction Closure, US 285 from mile marker 384, Tres Piedras to mile marker 392, 8 miles north of Tres Piedras.
Description: Construction Closure~~~Construction continues on a project to improve 8.337 miles of U.S. 285 at Tres Piedras. The project, which extends from milepost 384.051 on the south to milepost 392.308 on the north, is designed to improve safety and includes the following: . • Rehabilitation of the roadway • Widening of the shoulders on both sides to the roadway • Extending the drainage structures near the roadway • Erosion control • New signing and striping of the roadway. . Regular work hours will be 6 a.m.-6 p.m. Monday-Thursday and 6 a.m.-2 p.m. Friday although the contractor may work longer hours or weekends as needed. *** One lane will be closed for the duration of the project, and flaggers and a pilot car will be on hand to guide motorists through the construction zone 24 hours a day, 7 days a week until the end of the project. *** Please obey all traffic control personnel and proceed with caution through the roadwork zone. *** PLEASE NOTE: THERE IS A 10 FOOT WIDTH RESTRICTION IN PLACE!***
Post Date: 2022-04-18 07:33:36.0
Update Date: 2023-06-29 11:39:06.0
Expiration Date: unknown
Title: Roadwork, I 25 at mile marker 75, Williamsburg (T OR C SOUTH).
Description: Roadwork~~~El Terrero Construction, LLC. (Contractor) will be continuing construction to replace the bridge at I-25 milepost 75, Broadway Street and NM 187 in Williamsburg. Traffic has been shifted into the northbound lanes with the on/off ramps open, access to the southbound on/off ramps are still closed. Currently crews are working on installation of southbound on/off ramps, bridge installation and drainage structures. Regular work hours will be 7 a.m.-5:30 p.m. Monday-Friday although the contractor may work longer hours or on weekends as needed. Access will be maintained to all businesses and residences during construction.
Post Date: 2023-01-16 08:55:34.0
Update Date: 2024-02-29 11:30:49.89
Expiration Date: unknown
Title: Roadwork, US 84 northbound and southbound at mile marker 208, Tierra Azul.
Description: Roadwork~~~The New Mexico Department of Transportation (NMDOT) and Hasse Contracting Company Inc. will begin a bridge repair project at mile marker 208 on U.S. 84 in Abiquiu. This project will consist of structural repairs and modifications, concrete drainage installation, concrete wall barrier installation, and new guardrail installations. *** Starting August 14th, 2023, the highway will be reduced to one lane northbound and southbound throughout the construction zone. Working hours will be from 7a.m. to 5p.m., Monday through Friday. All lanes will be reopened by the end of the workday and all traffic control devices will be removed from the roadway. *** Drivers are urged to watch out for workers in the area, observe traffic control signs and reduce speed to the posted speed limit. ***
Post Date: 2023-08-14 10:03:01.0
Update Date: 2023-08-14 10:03:01.0
Expiration Date: unknown
Title: Roadwork, NM 68 from mile marker 44, 1 mile south of Taos to mile marker 45, Taos.
Description: Roadwork~~~Work resumes April 19, 2021. There will be barricades along the center of Paseo Del Pueblo Sur preventing any left turns in either direction between the Tewa/Albright intersection and the Siler/Los Pandos intersection. Also, the intersection of Albright Street and Paseo Del Pueblo Sur will be closed while crews work in the southeast corner of the intersection. For more information, motorists are encouraged to visit www.taosnm6864.com
Post Date: 2020-04-13 07:53:05.0
Update Date: 2022-11-08 07:57:24.0
Expiration Date: unknown
Title: Construction Closure, I 25 from mile marker 264, (COCHITI/NM 16) to mile marker 267, WALDO.
Description: Construction Closure~~~The first phase of the La Bajada Slope Mitigation project begins on July 11, 2022. This will entail the closure of the northbound right line and the construction of crossover lanes between the northbound and southbound roadways. 2 lanes will be open during peak hours for the duration of the project. At all other times, lane closures are possible, and motorists should plan their trips accordingly.
Post Date: 2022-07-11 12:14:48.0
Update Date: 2022-11-08 07:58:43.0
Expiration Date: unknown
Title: Roadwork, US 380 at mile marker 65, Carrizozo.
Description: Roadwork~~~Project is in Full Suspension-Dynamic Message signs are being installed throughout Lincoln and Otero Counties. US 380, MP 65 to MP 66, US 70 at MP 259 in Lincoln County and US 70 at MP 231 in Otero County. The Speed Limit is reduced to 45 MPH applying to the Work Zones. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Aaron Clark, NMDOT Project Manager (575)840-3566; Contractor; Erin Millwood, Bixby Electric, Construction Project Manager (505)263-3421 ; Russell Critchell, Bixby Electric, Construction Traffic Control Supervisor (505)238-3595
Post Date: 2023-05-01 09:30:41.0
Update Date: 2023-08-01 12:27:39.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad.
Description: Roadwork~~~Roadwork for intersection lighting will begin on August 2nd, 2022 on US 285 from mm 38.5 to mm 42 (North of Carlsbad). There will be lane restrictions (780’ taper with drums) during the day from 6:00 AM to 6:00 PM with traffic control being taken off the road at the end of the work day. This is a 60 day project with estimated completion being September 2022. Contractor: Bixby Electric; Project Manager: Erin Millwood (505)263-3421 Superintendent: Russell Critchell (505)238-3595; TCS Trae Baldwin (505) 379-8058. NMDOT PM Brian Torres (575) 626-4278.
Post Date: 2022-07-29 12:13:40.0
Update Date: 2022-09-01 15:22:31.0
Expiration Date: unknown
Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe.
Description: - Please Select - - Roads are wet and may become slick. Visibility is good with clear skies.~~~Glorieta - Roads are wet at this time.
Post Date: 2019-12-27 22:23:17.0
Update Date: 2019-12-28 13:53:25.0
Expiration Date: unknown
Title: Roadwork, NM 566 northbound and southbound from mile marker 6, 6 miles north of I-40 to mile marker 7, 7 miles north of I-40.
Description: Roadwork~~~Roadwork on NM 566, mile marker 6-7 (north of Church Rock) due to a bridge replacement project. All traffic has been shifted onto the detour pavement. Speed reduced to 35mph through the work zone. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2023-12-22 09:19:16.0
Update Date: 2023-12-22 09:19:16.0
Expiration Date: unknown
Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 123, Carrizozo. , right shoulder, and left shoulder
Description: Roadway Reconstructions is underway between MP 122 and MP 123 on US 54. The Speed Limit is reduced to 25 MPH applying to the Work Zones and a temporary detour is in place. Motorists should obey all construction signing and watch for construction personnel and equipment. Project is scheduled to be finished in Fall of 2023. Patrick Palomarez, NMDOT Project Manager (505)288-1911; Contractor; Hector Sicre, Constructor's Inc. Construction Project Manager (915)316-7732 ; James Atkinson, Constructor's Inc Construction Traffic Control Supervisor (575)937-4667~~~
Post Date: 2022-02-18 11:01:42.0
Update Date: 2022-07-22 09:47:34.0
Expiration Date: unknown
Title: Alert, NM 14 from mile marker 28, 1 mile south of Madrid to mile marker 29, Madrid.
Description: Alert~~~Vehicles over 55' in length are prohibited in Madrid N.M.
Post Date: 2023-08-18 16:17:57.0
Update Date: 2024-02-10 19:05:15.0
Expiration Date: unknown
Title: Lane Closure, I 25 from mile marker 159, McNierney to mile marker 175, Bernardo (US 60/MOUNTAINAIR).
Description: Lane Closure~~~J-H Supply, Co. (Contractor) will be continuing a guardrail and end treatment project along I-25 in Socorro County from milepost 159 to 175. Motorists can expect lane closures in the northbound lane from 167-172 and the southbound lane from milepost 171-168. Overnight lane closures should be expected. The hours of operation are from 7 a.m. to 5 p.m., Monday through Friday. Construction is expected to be completed by Spring 2024.
Post Date: Fri Feb 17 14:06:00 MST 2023
Update Date: 2024-02-29 11:30:49.89
Expiration Date: unknown
Title: Construction Closure,
Description: NM 45 SB MP 13.2 at Bluewater (2/19 thru 4/24) There will be right lane and shoulder restrictions. Work is being performed for commercial development. Motorists should anticipate delays. Contractor: HB Construction
Post Date: 2024-02-16 07:02:16.0
Update Date: 2024-02-22 10:26:11.0
Expiration Date: 2024-04-24 23:59:00.0
Title: Construction Closure, I 25 southbound at mile marker 230, (SAN MATEO).
Description: I-25 SB FRT MP 230 at Ellison/San Antonio (2/19 thru 3/8) There will be left lane and shoulder restrictions. Work is being performed for utility maintenance. Motorists should anticipate delays. Contractor: AMAFCA
Post Date: 2024-02-16 06:57:58.0
Update Date: 2024-02-22 10:26:38.0
Expiration Date: 2024-03-08 15:00:00.0
Title: Roadwork, NM 566 northbound and southbound at mile marker 0, Church Rock (I-40).
Description: Roadwork~~~Bridge Replacement work on NM 566, mile marker 0 - 0.866 (Church Rock). All traffic has been shifted to the detour pavement. Watch for equipment. This event will be updated as conditions change.
Post Date: 2023-10-13 15:46:41.0
Update Date: 2023-10-13 15:46:41.0
Expiration Date: unknown
Title: Roadwork, NM 404 from mile marker 1 to mile marker 9.
Description: Roadwork~~~Mountain States Constructors, Inc. (Contractor), will be continuing the roadway reconstruction and lighting project on NM 404 from milepost 0.9 (Anthony) to milepost 8.8 (Chaparral). Traffic has been shifted into the westbound lanes so construction can begin on the eastbound lanes except in the areas where culvert box placement is still in process. Currently, the contractor is installing drainage structures, subgrade preparation, Base Course, and Hot Mix. The speed limit has been reduced to 45 MPH for the safety of the traveling public. The contractor’s regular hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday, some weekends as needed.
Post Date: 2022-12-09 13:32:21.0
Update Date: 2024-02-29 11:30:49.89
Expiration Date: unknown
Title: Alert, NM 475 from mile marker 1 to mile marker 5.
Description: Alert~~~Beginning Monday, September 11, 2023, PNM will begin a project to upgrade the electrical service to residents on N.M. 475. One lane will be closed in various spots between mile marker 2.5 to 4.5 until the project is completed. *** For more information, please contact the PNM Electric Hotline @ 1-833-910-3670 ***
Post Date: 2023-09-08 12:37:39.0
Update Date: 2024-02-10 19:04:48.0
Expiration Date: unknown
Title: Alert, US 380 at mile marker 66, Carrizozo.
Description: Trucks over 65 foot are prohibited on US 380 between Carrizozo and Hondo. This is a PERMANENT ALERT.~~~
Post Date: Fri Jan 06 12:52:40 MST 2017
Update Date: 2024-02-29 08:36:21.0
Expiration Date: unknown
Title: Roadwork, NM 359 at mile marker 2.
Description: Roadwork~~~AUI, Inc. (Contractor) will continue the bridge rehabilitation project on NM 359 at milepost 1.90 over the Rio Grande. The majority of the work will take place under and around the bridge, with no traffic impacts expected. Drivers are asked to please obey traffic control devices if placed and be on the lookout for workers and/or equipment entering and exiting the roadway. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday.
Post Date: Fri Jan 05 13:48:00 MST 2024
Update Date: 2024-02-29 11:30:49.89
Expiration Date: unknown
Title: Roadwork, NM 157 eastbound and westbound at mile marker 0.
Description: Roadwork~~~AUI, Inc. (Contractor) will begin working on a bridge rehabilitation project on NM 157 at milepost 0.1 over the Leasburg Canal. The majority of the work will take place under and around the bridge, with no traffic impacts expected. Drivers are asked to please obey traffic control devices if placed and be on the lookout for workers and/or equipment entering and exiting the roadway. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-01-05 13:45:04.0
Update Date: 2024-02-29 11:30:49.89
Expiration Date: unknown
Title: Roadwork, US 380 at mile marker 2, San Pedro.
Description: Roadwork~~~AUI, Inc. (Contractor) will begin working on a bridge rehabilitation project on US 380 between mileposts 1.6 and 1.8 over the Rio Grande River. The majority of the work will take place under and around the bridge, with no traffic impacts expected. Drivers are asked to please obey traffic control devices if placed and be on the lookout for workers and/or equipment entering and exiting the roadway. The contractor’s hours of operation will be from 7 a.m. to 5 p.m. Monday through Friday.
Post Date: 2024-01-05 13:44:23.0
Update Date: 2024-02-29 11:30:49.89
Expiration Date: unknown
Title: Roadwork, I 25 from mile marker 3, (LOHMAN) to mile marker 4, 4 Las Cruces.
Description: Roadwork~~~Grass Masters LLC (Contractor) is continuing a landscaping, curb and gutter, miscellaneous construction, and paving project along I-25 from milepost 3 to milepost 3.7 near Lohman Ave in Las Cruces. Crews will be working on the wall foundations and wall footing along the I-25 northbound interchange and on/off ramp. Most construction will be on the shoulders with little impact to travelers. The contractor’s hours of operation will be from 7 a.m. to 5 p.m., Monday through Friday.
Post Date: 2024-01-05 13:42:31.0
Update Date: 2024-02-29 11:30:49.89
Expiration Date: unknown
Title: Roadwork, NM 83 from mile marker 0, Lovington to mile marker 1, 1 mile east of Lovington. Roadway closed.
Description: Roadwork~~~Construction for NM83/ US82/ and NM18 in the City of Lovington will take place between Milepost 71.98 to 72.13 for NM 18; between MP 171.37 to MP 172.10 US82 north; MP 171.34 to 171.37 US 82 West; and MP 0.00 to 0.48 on NM83. Commercial trucks are to use the bypasses around the city. On US82 from Tatum there is a truck bypass at MP 173. On US82 from Artesia there is a truck route at MP170 that goes to Hobbs on the right and to Tatum on the left. US82 from Texas the truck bypass is on Commercial. From Hobbs, take a left on Urlacher. The intersection of NM 83/82 has been reopened for east, west, and southbound traffic. Northbound traffic is closed from the intersection to Central. Use posted detour signs to navigate through construction. Obey all traffic and speed signs, and use caution while driving. Detours are set up for the road work there will be a restriction of 10 feet in width on the project. Construction for the project is scheduled to last an estimated 499 working days. Traffic Control is currently set up in Lovington. Traffic Control has been set up on US 82 Going east. Obey all traffic posting throughout the project. The intent of this project is to reconstruct existing concrete and asphalt paving, curb and gutter, ADA curb ramps, sidewalk, drive pads, storm drainage improvements, lighting, signal equipment replacement, signing, pavement markings and to provide construction traffic control for vehicles and pedestrians. Emergency Contact List for the 2101381R2 project: Contractor: Constructors, Inc., Project Manager- Darin Coslin (575) 626-1140, Superintendent- Hector Sicre (915)316-7732. Traffic Control Supervisor- Francisco Rodriguez (915) 540-2938, Project Safety Office- Tami Mandel (505) 697-1787- Project EEO Officer- Kelly Hicks (575) 302-8408 NMDOT Project Manager John Lara (575) 840-9625, Hobbs Project Office (575) 973-0245.
Post Date: 2021-09-03 10:43:53.0
Update Date: 2024-01-18 14:38:15.0
Expiration Date: unknown
Title: Roadwork, US 285 from mile marker 6, 6 miles north of TX State Line to mile marker 17, 1 mile north of Malaga. Roadway closed.
Description: Roadwork~~~FNF Construction will be reconstructing the roadway, working on bridge rehab and extending drainage structures. Expect lane closures and some delays. There is a 12 foot restriction the entire corridor. WIDE LOADS SHOULD SEEK ALTERNATE ROUTE. Contact Information: FNF Project Manager - Greg Williams 480-290-0383 cell. FNF Traffic Control Supervisor - Christian Day 480-305-4872 cell. NMDOT Project Manager - Juan Salas 575-626-9882
Post Date: 2022-06-03 07:40:05.0
Update Date: 2023-08-01 12:00:45.0
Expiration Date: unknown
Title: Severe Driving, NM 126 from mile marker 17, 17 miles east of Cuba to mile marker 25, 13 miles west of NM 4.
Description: Severe Driving Conditions - Roads are snow packed and icy.~~~Severe driving conditions on NM 126, mile marker 17-25 (17 miles east of Cuba to 13 miles west of NM 4). Road is snow packed and icy. Please drive with caution, reduce speed and obey all posted traffic signs. This event will be updated as conditions change.
Post Date: 2024-02-02 11:27:57.0
Update Date: 2024-02-02 11:27:57.0
Expiration Date: unknown
For official NM traffic info visit: New Mexico DOT Traffic Site

Currently

A Few Clouds 34°F
30.13in
Barometer
85%
Humidity
Southeast 4.6mph
Wind
A Few Clouds

More Local Information

Bookmark and Share

Traffic Nearby

Kirtland Air Force Base weather and traffic updates by locals

Write your own Kirtland Air Force Base, New Mexico report, forecast, or traffic update:

Please note by clicking on "Post" you acknowledge that you have read our Privacy Policy and Terms of Service and the Kirtland Air Force Base, NM report and/or forecast you are posting is in compliance with such terms. If you are under 18, do not submit this form. Be respectful. An inappropriate Kirtland Air Force Base, NM report and/or forecast will be removed by a moderator.